Weekly Con-call

Weekly Con Call (1st – 06th May’18)


Safety Performance UOM (This Week) FTM

08 NMI + 0 process + 0 Equip. 08 NMI + 0 process + 0 Equip. Damage + 0 Env.


A Near Miss & Incidents Nos
Damage Damage

Inc. Date Inc. Time Area Risk Level Reported By NM_DESCRIPTION


5-May-18 10:15:00 North Load 6 (Medium ) 564902 - Shikhar Kumar while conducting the ventilation survey at 285mRL, 1 piece of pipe was
Gupta lying in the drive in the water accumulated there. Suddenly the foot of
the person accompanying was placed on the pipe and he slipped but
somehow managed to fall.

4-May-18 5:55:00 VRM & East Load 4 (Low ) 564892 - Sarth Manish While a loaded LPDT was passing through 100mRL north (near surface
Bodawala ramp), while turning it got strike on side wall and thus cracked front
glass of LPDT. Luckily no injury occurred to operator.

2-May-18 19:45:00 VRM & East Load 8 (Medium ) 576699 - Rakesh Singhadia AT 100mRL E , 2 LPDT'S WERE GOING UPRAMP ONE LPDT WAS
BREAKDOWN ON THEIR PATH SO THEY CAME OUT OF THE THEIR
RESPECTIVE LPDT'S AND PARKED THIER LPDT'S ON THE RAMP. BUT
WHEN THE LPDT( WHICH WAS BD) GIVEN OK. 1ST LPDT OPERATOR
STARTED HIS VEHICLE AND TRY TO MOVE IT BUT SUDDENLY THE
SECOND LPDT OPERATOR TRY TO CROSS THE LPDT FROM LEFT SIDE
WHICH WAS SO CONFINED AND THERE WAS NOT ANY MAN HOLES TO
SAVE IT BUT EVENTUALY HE NEARLY ESCAPED FROM ANY INJURY.

one vision . one vedanta .


Mine Performance
Weekly ConCall mining Operations
May-18 FTW 01 May to 06 May 18 MTD May-18 % Achieved (MTD)
1 Operational Performance UoM BP RP BP RP Actual BP RP Actual %BP %RP
A Ore Production MT 119000 110000 19194 17742 14373 19194 17742 14373 75% 81%
Ore Production- Hoisting MT 69000 68600 11129 11065 6837 11129 11065 6837 61% 62%
B Ore Hauling MT 50000 41400 8065 6677 7536 8065 6677 7536 93% 113%
C Ore Treatment-RDM MT 91500 90000 14758 14516 14373 14758 14516 14373 97% 99%
D Ore Treatment-SKM MT 0 0 0 0 0 0 0 0 0% 0%
E Ore Treatment-Total MT 91500 90000 14758 14516 14373 14758 14516 14373 97% 99%
F Mine Development Mtrs 658 658 106 106 76.0 106 106.1 76.0 72% 72%
G Production Drilling Mtrs 11000 10000 1774 1613 1259 1774 1613 1259 71% 78%
H Exploration Drilling Mtrs 700 600 113 97 131 113 96.77 131 116% 135%
I Average Pull Mtrs 2.3 2.3 2.3 2.3 2.3 2.3 2.3 2.3 100% 100%
J No. of blast nos 286 286 46 46 33 46 46 33 72% 72%
2 K LPDT availability(20t) % 82 82 82 82 78 82 82 78 95% 95%
LPDT availability(30t) % 82 82 82 82 88 82 82 88 107% 107%
L LPDT Utilisation (20t) % 50 50 50 50 5 50 50 5 10% 10%
LPDT Utilisation (30t) % 50 50 50 50 35 50 50 35 70% 70%
M LHD Availability(7t) % 65 65 65 65 57 65 65 57 88% 88%
LHD Availability(10t) % 80 80 80 80 75 80 80 75 94% 94%
N LHD Utilisation(7t) % 65 65 65 65 37 65 65 37 57% 57%
LHD Utilisation(10t) % 65 65 65 65 48 65 65 48 74% 74%
O Jumbo drill - Availability % 72 72 72 72 60 72 72 60 83% 83%
P Jumbo drill - Utilisation % 25 25 25 25 14 25 25 14 56% 56%
3 Hydro Fill performance
Q Total Filling Hrs Hrs 400 400 65 65 50 65 65 50 78% 78%
R High Density Fill Hrs Hrs 41 41
S Void Filled m3 14400 14400 2323 2323 1696 2323 2323 1696 73% 73%

Month Plan FTM Mar18


one vision . one vedanta .
Mill Performance
May-18 FTW 01 May to 06 May 18 MTD May-18 % Achieved (MTD)
UoM
BP RP BP RP Actual BP RP Actual %BP %RP
Ore Treatment -Total MT 91500 90000 14758 19900 14373 14758 62386 14373 97% 23%
Ore Treatment -SKM+ZWR MT 0 0 0 0 0 0 0 0 0% 0%
Ore Treatment -RDM MT 91500 91500 14758 19900 14373 14758 62386 14373 97% 23%
% Pb_RDM % 1.26 1.2 1.26 1.2 1.19 1.26 1.20 1.19 94% 99%
%Zn_RDM % 5.14 5.1 5.14 5.1 5.1 5.14 5.10 5.1 99% 100%
TMC_RDM % 6.4 6.3 6.4 6.3 6.29 6.40 6.30 6.29 98% 100%
Ag ppm 43 55 43 55 65 43 55 65 151% 118%
Recovery Pb % 68.90 68.90 68.90 68.90 68.91 68.90 68.90 68.91 100% 100%
Recovery Zn % 83.90 83.90 83.90 83.90 83.94 83.90 83.90 83.94 100% 100%
MIC_RDM-Pb MT 794 685 128 110 143 128 110 143 112% 129%
MIC_RDM-Zn MT 3915 3550 631 573 748 631 573 748 118% 131%
MIC_RDM-Total MT 4710 4235 760 683 891 760 683 891 117% 130%
MIC_SKM+ZWR-Total MT 0 0 0 0 0 0 0 0 0% 0%
MIC -Total MT 4710 4235 760 683 891 760 683 891 117% 130%

Month Plan FTM Mar18