INTRODUCTION
FEASIBILITY STUDY
• Initial Work
– Market Analysis and Production Capacity
– Competing Processes, Patent and License
Situation
– Legal Aspects
FEASIBILITY STUDY
• Cost Estimation
– Investment Costs
• Onsite Items
• Offsite Items
– Operating Costs
FEASIBILITY STUDY
• Profitability Analysis
– Profitability Analysis as an Engineering Task
FEASIBILITY STUDY
• Profitability Analysis (con’d)
– Methods of Profitability Analysis
• Payout (Payback) Period
• Return on Investment (ROI)
• Dynamic calculations
– IRR
– NPV
FEASIBILITY STUDY
• Site Selection
– Site Quality, Topography, Soil Conditions, Climate,
Flood Risk
– Raw-Material Availability Including Power, Fuels,
and Water
– Environmental Conditions, Environmental
Legislation, and Infrastructure of the Construction
Site
– Long-Term Availability of Qualified Labor
FEASIBILITY STUDY
• Decision between Alternative Investments
– Preparation for Decisionmaking
• Risk Analysis
• Sensitivity Analysis
– Decisionmaking
PRELIMINARY DESIGN
• Preliminary Design Costs
Project cost < $2.000.000 $2.000.000- $10.000.000-
$10.000.000 $100.000.000
Order-of- $3.000 $6.000 $13.000
magnitude estimate
Study estimate $20.000 $40.000 $60.000
Piping model
EXECUTION OF THE PROJECT
• Procurement
– Purchase of Equipment and Services
– Expediting
– Shipping
• Planning and Execution of Civil Work and Erection
• Commissioning
– Plant Design and Commissioning
– Operating Manual
– Responsibility and Organization
– Preparation for Commissioning
– Plant Startup