Sie sind auf Seite 1von 5

DT(Drive Test) information

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 1


DTR and Related check points
Check the Missing route / issue sites

1. Planned DTR Check Point


- DTR Should be approved by Jio RF Lead
Result : Yes

2. Total DTR Covered Check point


Covered rate
Category Distance (Km) (%)
Planned Drive Route 6.23 KM
100%
Actual Measurement Route 6.23 KM

3. Redrive / Additional Drive Check Point


- Result : No , Additional drive not done

Covered DTR less than 90%, Required


justification with Geo code &snap
Justification for
missing route

Planned DTR

Actual DTR based on RSRP DTDL call model

*KML DTR to be embedded into SSCVT Vuze Generated Report in Analysis Worksheet
© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 2
DL PRB Utilization
Required Sector wise for target SCVT site of drive period , Source from JCP Site RAN Performance stats

Drive duration

Drive completed in 2 days. i,.e 17 oct and 21 oct but we have used 21 Oct data.

Microsoft Excel
Worksheet

© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 3


Handover Interruption Time < 100ms

Handover Interruption Time < 100ms failure due to core issue.


© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 4
© Samsung Electronics. All Rights Reserved. Confidential and Proprietary. 5

Das könnte Ihnen auch gefallen