Contractor’s Day Session : Avoiding Problems Through Sound Prevention Methods
Using Technology and Visual
Management to Prevent Rework The Big Why ? Why ?
What Problem Are We Trying to Solve
Design Quality has been Early Problem Detection /
Declining Resolution Schedules / Budgets are Fast Cycle / Collaborative Decision Compressed Process Why ? How does Technology combat these challenges? CHARATERISTICS OUTCOMES EFFECTIVE COMMUNICATION OF REDUCED REWORK PROJECT TEAM REDUCED WASTE COLLABORATIVE / ENVIRONMENT HIGHER PRODUCTIVITY OF TRUST HIGHER QUALITY EARLY DECISION MAKING ZERO INJURIES PROACTIVE vs REACTIVE REDUCTION IN TIME APPROACH REDUCTION IN COST HIGH PREFABRICATION / SUPPLY CHAIN OPTIMIZATION MODULARIZATION PROJECT TEAM HAD A GREAT EFFECTIVE SUPPLY CHAIN EXPERIENCE VIRTUAL PROTOTYPING / MOST IMPORTANTLY DELIGHTED SIMULATIONS CUSTOMER The Process Process – Assembly Instructions
“Assembly Instructions” for
Construction Process – Collection of Information
Misc Metals Shop Drawings
MEP Models
Rebar Shop Drawings Structural CDs
Steel Shop Drawings Architectural CDs
Process – Concrete Install Process – As Planned As Built Paperless Collaboration and Communication Collaborative Review
Architect Foremen
Bluebeam
Engineer Project Engineer
MEP Detailer and Foremen Superintendent
Technology in the Field
• 120 Ipads In The Field For MKE
• Information At the Fingertips of Craft Workers Technology in the Field No Ipad, No Problem……
• Community Ipad for jobsite
• Can hook up an Ipad to monitor • Printer available • All the same information syncs to community ipad Metrics Metrics US Bank Stadium Questions & Answers
Shaun Hester Using Technology and Visual Management to Prevent Rework shaun.hester@mortenson.com @MAMortensonCo www.mortenson.com/vdc-journey