point of water (point at which water directly flashes into steam with no latent heat of vaporization), VIZ.,22.09MPa and 374.14°C, the operating regime is said to be super critical.
Operation below these limits are said to be in sub-
critical.
Plants with operating steam cycle parameters of
31.0-34.5 MPa and 566/566°C are referred as ultra super critical plants. Comparison of power cycle efficiency particulars Sub critical Super Ultra super cycles critical critical cycles cycles Gross unit 37.8% 41.6% 43.4% efficiency% Gross unit 2275 2067 1981 heat rate kcal/kg Unit size 30-1300 50-1100 300-1100 MW RLA/R&M The performance of thermal units got deteoriated over time and this has been reflected in terms of plant load factor. Various factors responsible for poor performance are poor quality of fuel
inadequacy of design at conceptual stage
lack of operational experience
poor performance of controls& instrumentation
poor quality control of chemical regime
improper overhauling and maintenance
improper planning and management
lack of sound spares management cell
Maintenance schedule For 210 MW &above, CEA norms are Planned annual maintenance every
alternate year=30 days
Planned short maintenance every year=15 days Planned capital overhaul every 5-6 years=50
days Works during shut down Short shut down Major overhaul