Capacity
► The throughput, or the number of units
a facility can hold, receive, store, or
produce in a period of time
► Determines
fixed costs
► Determines if
demand will
be satisfied
► Three time horizons
© 2014 Pearson Education, Inc. S7 - 2
Design and Effective Capacity
► Design capacity is the maximum
theoretical output of a system
► Normally expressed as a rate
► Effective capacity is the capacity a firm
expects to achieve given current
operating constraints
► Often lower than design capacity
800 –
Break-even point Total cost line
700 – Total cost = Total revenue
Cost in dollars
600 –
500 –
300 –
200 –
TR = TC F
or BEPx =
P–V
Px = F + Vx
F $10,000
BEP$ = =
1 – (V/P) 1 – [(1.50 + .75)/(4.00)]
$10,000
= = $22,857.14
.4375
F $10,000
BEP$ = =
1 – (V/P) 1 – [(1.50 + .75)/(4.00)]
$10,000
= = $22,857.14
.4375
F $10,000
BEPx = = = 5,714
P–V 4.00 – (1.50 + .75)
Revenue
40,000 –
Break-even
point Total
30,000 –
Dollars
costs
20,000 –
Fixed costs
10,000 –
–
| | | | | |
0 2,000 4,000 6,000 8,000 10,000
Units
5-25
© 2014 Pearson Education, Inc. Instructor Slides
S7 - 25