National
NLDC Level
32 State HQ
SLDC SLDC SLDC Level
Nos.
Group /
51 SUB LDC SUB LDC SUB LDC
Nos. Distt Level
RLDC
Wide Band
Commn
SLDC SLDC
Wide Band
Commn
(MW / FO)
Sub-LDC Sub-LDC
Wide Band /
PLCC Commn
RTU RTU RTU
HINDUPUR
Integrated
Opn
of Ten Power
Annual Inter- Utilities Generators –
Regional Hydro,
Energy Thermal,Gas/IP
Transfer 30,000 POINTS P
≈10,000MU Active Power, Reactive 422 nos.
Power,
Installed Voltage, Frequency, Transmission
Capacity Transformer Network
≈32800 MW Tap Position, Circuit 400/220kV
Breaker Position, ≈ 40700 Ckm
Isolator Position etc
Transformers Transformati
(220kV and on
above) Capacity ≈
480 nos. Dynamic 45000 MVA
Grid
Conditions
Scan Cycles
• All the analog data are scanned every 10/12
seconds
• Status information are reported by exception
• All status information are scanned for integrity
check every 10 minutes
• The SOE datas are time stamped at 1 ms resolution
• Time synchronisation is done every 10 minutes
SRLDC ARCHITECTURE
DTS SYSTEM
AP-07 AP-08 FEP-1 FEP-2
DTS DTS
SERVER SERVER
APPLICATION
PROCESSOR
HIERARCHICAL LEVEL
Sub-LDC SCADA
• OPERATION MONITOR
• AUTOMATIC GENERATION CONTROL
• ECONOMIC DISPATCH
• RESERVE MONITOR
• LOAD SHEDDING SUPPORT
• PRODUCTION COST MONITORING
REAL-TIME NETWORK ANALYSIS
FUNCTIONS
• NETWORK TOPOLOGY
• BUS-LOAD FORECAST
• STATE ESTIMATION
• EXTERNAL MODEL
• LOSS SENSITIVITY
• REAL-TIME CONTINGENCY ANALYSIS
• OPTIMUM POWER FLOW
POST-DISPATCH FUNCTIONS
• POST DISTURBANCE ANALYSIS
--DISTURBANCE DATA COLLECTION
--SEQUENCE OF EVENTS DATA
Implementation through –
Unified Approach
• Achieved co-ordinated and phased
implementation
• Established the facilities within same time frame
• Compatibility of equipment system
• Standardisation of Hardware and software with
resulting economy in cost
• Optimisation of maintenance/spares of
equipments