Gabion Alternative
3. Gabion alternative
4. Investigation of dredged material JOSÉ LUIS MONSÓ
SENER SENIOR ADVISOR
5. Embankment protection design
6. Global Stability
CESAR GARCÍA &
7. Settlements SYLVIE BRETELLE
GHD GEOTECHNICAL DIRECTOR
8. Compaction
9. Filters, Surface preparation
CARLOS ROS
10. Constructability CLJV CAUSEWAY CONST. MNG.
CORDOVA TIE-IN
TOLL PLAZA
CAUSEWAY
MAIN
BRIDGE
CSCR
RAMPS
Conventional solution
100% Quarry materials
AREA Material
Reliable performance
Quarry Run I 1-150 kg
Durable (if good rock quality)
INTERIOR
Quarry Run II 1-50 kg Permeable core Easier design
Armour Rock, 60-300 kg
Main disadvantages:
EXTERIOR PROTECTION Armour Rock, 300-1000 kg
• Cost of quarry materials
Armour Rock, 1-1,5 T
• Logistics
• Environmental impacts
• Community impacts
Cebu - Cordova Link Expressway
2. Background. Geotube solution. Tender alternative.
• Allows core filling with dredged material (up to aprox +1.2 m MSL)
Maintenance free
Better seismic performance. Sand in the core is propertly compacted. Gabion stones
are not liquefactable
Once it is protected and confined by the armour rock the mesh is not strictly required
Filter criteria should be met between the gabion stones and the armour rocks
Filter cloth needs to be placed between the dredged sand and the gabions
Polimer and PVC based coating of wire mesh is available. Expectency life is up to 120
years depending the product and the environment (refer to EN-10223-3 Hexagonal
Steel wire mesh products for civil engineering purposes)
CONFIDENTIAL
Cebu - Cordova Link Expressway
3. Gabion Alternative. Durability
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of
dredged material
STAGE 1:
Shallow sampling along Mactan Channel
Purpose is to identify potential sources of adecuate material to carry out more
detailed investigation (stage 2)
Field identification + Lab testing
STAGE 2:
To Determine accurately volumen of suitable material
Grid of Boreholes 5 m Deep + Bathymetry
Continuos sampling along the depth (1 spt every half a meter)
Lab testing including chemical analysis
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 1
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 1
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 1
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 1
B1 x x x x x x x x
C1 x x x x x x x x
C2 x x x x x x x x
C3 x x x x x x x x
SANDY
D1 x x x x x x x x
SOILS
D2 x x x x x x x x
D4 x x x x x x x x
D6 x x x x x x x x
D7 x x x x x x x x
B2 x x x
B3 x x x
D3 x x x
D5 x x x
CLAYEY DBH1 x x x
SOILS GS1 x x x
GS7 x x x
GS16 x x x
GS20 x x x
A8 x x x
A12 x x x
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 1
TOXICITY TESTS:
CONFIDENTIAL
Cebu - Cordova Link Expressway
4. Investigation of Dredged Material. Stage 2
CONFIDENTIAL
Cebu - Cordova Link Expressway
5. Embankment
protection design
A) DESIGN REQUIREMENTS:
• Durability
• Gabions act as a containment system of the dredged core backfill. Stone sizes between 10 and
20 cm are recommended inside the gabions in order to minimize the motion of individual
stones within and avoid possible deformation of the basket and the abrasion of the mesh-wires.
• It is recommended to move the gabions towards the core in order to install a filter material
between gabions and main armour layer. This should guarantee a uniform slope for the
installation of the rubble-mound protection.
• The solution is to place heavy armor stone as the primary defense to dissipate a large
proportion of the wave energy. However, armor stones are recommended to be less than two
tones because of availability limitations in local quarries.
• Permeablity is an important parameter to determine the design of the armor stones. More
permeability gives more stability and less run-up and overtopping.
• In order to assess the permeability of the structure 2D physical model test should be performed
• WHY TESTING?
• Core permeability drives the design of the main armor and run-up values
• Formulations depend on notional permeability (P) which can only be well defined with 2D
physical model tests
• Despite this solution will have higher permeability than a geotube based solution
(impervious core), it is complex to define the permeability of the core and its effects on the
main armor stability.
• A sensitivity analysis of the impact of permeability in the armor layer weight is shown in Fig.
2. For the tender design inputs Hs= 1.58 m and Tm-1=4.76 s, main armor layer weight (Wn50)
is in the range of 2.1 t to 0.9 t for permeability values ranging from 0.1 up to 0.5.
• In order to well define the notional permeability P of our sections, 2D tests should be run.
• Gabion boxes act solely as retaining structures of the dredged material inside the core and
they are not considered in the marine design protection against waves.
• A filter layer should be included in the wave exposed area (south side) between gabions
and armor layer.
• Three different sections are proposed depending on the depth range in order to guarantee
a minimum top elevation of gabions of +1.2 m MSL. Dredging material top elevation is also
+1.2 m MSL.
• Objectives:
Wave heights shall progressively increase 0.5 m steps with a total of six wave height
steps to be tested. Three periods will be considered ranging from 3.5 till 6.5 s
Finally, after physical model test conclusions, additional tests of a second cross section could
also be proposed. This new cross section would include geometry modifications and
improvements based on the results obtained.
CONFIDENTIAL
Cebu - Cordova Link Expressway
6. Global Stability. Detailed design stage causeway
design – Slide model
CONFIDENTIAL
Cebu - Cordova Link Expressway
6. Global Stability. Comparison between Tender and
Detailed Design
CONFIDENTIAL
Cebu - Cordova Link Expressway
6. Global Stability. Comparison between Tender and
Detailed Design
CONFIDENTIAL
Cebu - Cordova Link Expressway
6. Global Stability. Geotechnical Parameters
Filters 20 0 42 NAVFAC
Gravelly limestone 22 5 38 RocLab
(foundation)
Limestone (Bedrock) 22 60 45 RocLab
Consideration for Tidal lag Water table to be +1.10m MSL (MHHW) on causeway,
falling to 0m MSL outside the causeway
Results of Analyses (c=0 kPa, 2.5 kPa, and 5 kPa Dredged bottom)
Cohesion of
Internal Global
Cases wet dredged
FSBishop FSBishop
material
1a 0 kPa Seismic (Level 2) 1.11 1.11
1b 0 kPa Normal 1.46 1.48
2a 2.5 kPa Seismic (Level 2) 1.17 1.15
2b 2.5 kPa Normal 1.53 1.55
3a 5 kPa Seismic (Level 2) 1.11 1.14
3b 5 kPa Normal 1.50 1.50
Key considerations
CONFIDENTIAL
Cebu - Cordova Link Expressway
8. Compaction
Dredged material up to MHW (+0.5 MSL will require compaction by dynamic roller (that can
improve 2-3m to very dense to avoid liquefaction risk). This material shall be evaluated for
compaction and settlements.
CONFIDENTIAL
Cebu - Cordova Link Expressway
8. Compaction
Graph showing depth of influence of dynamic roller = 3.85m
*ISSMGE 0 TC 211 International Symposium on Ground Improvement (31 May and June 2012)
https://www.broons.com/images/uploads/tech_papers/Quantifying-the-Zone-of-Influence-
of-the-Impact-Roller.pdf
CONFIDENTIAL
Cebu - Cordova Link Expressway
8. Compaction
CONFIDENTIAL
Cebu - Cordova Link Expressway
8. Compaction
No of passes 10 – 40
Video
CONFIDENTIAL
Cebu - Cordova Link Expressway
9. Geosyntetics,
Surface preparation
4 2.5m
0.6m
+1.1 m MSL Gabion
Geotextile Separator
between filters
and dredged
material
Geocomposite Drainage/
Tensile
reinforcement/
Separator
CONFIDENTIAL
Cebu - Cordova Link Expressway
9. Geosyntetics and surface preparation
CONFIDENTIAL
Cebu - Cordova Link Expressway
10. Constructability
1. Installation of geotextile
2. Positioning of Gabions
3. Gabions will be covered with geotextile
4. Placing of dredged materials
5. Compaction of embankment with dredged material
6. Installation of Geogrid Layer
7. Installation of Armour Rocks (First Phase)
8. Backfilling materials above water level in dry condition
9. Installation of Armour Rocks (Second Phase) .
Installation of geotextile
- a layer of geotextile will be laid and hold with the weight of the gabions.
DFL 1.48m
MSL 0.00m
-0.50m
One layer of
geotextile
DFL 1.48m
MSL 0.00m
-0.50m
Gabions
Geotextile will cover the inner part of the gabion line to prevent the seepage of the dredged
materials into the gabions.
Geotextile covering
the gabions
DFL 1.48m
MSL 0.00m
-0.50m
DFL 1.48m
MSL 0.00m
-0.50m
Dredged Materials
A geogrid layer will be installed so other materials can be used for backfilling while improving the
conditions of the embankment.
DFL 1.48m
MSL 0.00m
-0.50m
Geogrid Layer
Armour rocks are placed for the additional protection of the filling materials.
DFL 1.48m
MSL 0.00m
-0.50m
Armour Rocks
Backfilling materials will be poured above the compacted layer and after which, the armour rocks
on the 2nd phase will be dumped.
DFL 1.48m
MSL 0.00m
-0.50m
Backfilling in Dry
Condition
Transportation of
Loading of Gabions and Gabions to the
Hauling to the jetty specific location
Marine Transportation
of Gabions to Cordova
Wharf
*Flowchart may vary change once the causeway platform is already available
Rate:
2 Gabions/man per day
Flat Barges
To be used in transporting from the compound to the jetty and marine
transportation from the jetty to the Cordova Wharf
Floating Platform
To be used in transporting the gabions and geocomposites to their
specific locations
Amphibious Excavator
To be used in picking up the gabions from the platform to its
assigned place.
Floating Platforms
Amphibious Excavator
Bathymetry