First Ever Pole site integration using F@H pole

RP-Dhaka
25-4-17
GP Was facing Lot of Challenges for Blackspot at Gulshan-1 for
2 years+

Long Pending Black Spot Micro cell Acquisition Challenges


near was planned stopped
SCB, Gulshan-1 For Solution Conventional Solution
deployment
As an alternative, a new Solution Modality of Street Pole with
AAU and Cloud BBU designed and worked out

Identify exact acquisition challenges


High Rent
Health Hazard

New Idea
Solution Deployment @ pole of Security Camera

Solution Portfolio
Cloud BBU(BBU with rectifier integrated)
AAU(Radio Unit with Integrated Antenna)

Workout Problematic location


Find out and get approval from F@H to use their pole near problematic spot
Solution On aired on 23th April,2017.
Space Requirement is very minimal.

Security Camera

April, 2017

Integrated Antenna & RRU • Radio Plan


19
• IP & Cell Parameter
20
• Site Installation
Blade BBU & Blade Rectifier 23
• On Air Declaration
24

Pole • Post DT
24

Pole site in front of SCB, Gulshan-1


3G network in front of SCB solved after solution deployment

Pre RSCP Post RSCP Pre Quality Post Quality


The Location Doesn’t have any 3G-2G toggling after Solution
Deployment

- No 3G-2G Toggling observed at that area.


- Customers under this area enjoying smooth 3G network
experience

Technology plot
0
5
10
15
20
25
30
2017-04-23 22:00
2017-04-23 23:00
2017-04-24 00:00
2017-04-24 01:00
2017-04-24 02:00
2017-04-24 03:00
2017-04-24 04:00
2017-04-24 05:00
2017-04-24 06:00
HSDPA User Num

2017-04-24 07:00
2017-04-24 08:00
2017-04-24 09:00
2017-04-24 10:00
2017-04-24 11:00
2017-04-24 12:00
2017-04-24 13:00
2017-04-24 14:00
2017-04-24 15:00
2017-04-24 16:00
2017-04-24 17:00
HSDPA User Throughput (kbps)

2017-04-24 18:00
2017-04-24 19:00
All the KPI is Very Good and Stable

0
100
200
300
400
500
600
700
800
900

0
5
10
15
20
25
30
35
40
45

2017-04-23 22:00
2017-04-23 23:00
2017-04-24 00:00
2017-04-24 01:00
2017-04-24 02:00
2017-04-24 03:00
2017-04-24 04:00
• Optimization is in progress to control overshooting

2017-04-24 05:00
2017-04-24 06:00
2017-04-24 07:00
2017-04-24 08:00
Voice TRAFFIC (Erlang)

2017-04-24 09:00
2017-04-24 10:00
2017-04-24 11:00
2017-04-24 12:00
2017-04-24 13:00
2017-04-24 14:00
2017-04-24 15:00
2017-04-24 16:00
HSDPA Data (GB)

2017-04-24 17:00
2017-04-24 18:00
2017-04-24 19:00
0
1
2
3
4

0.5
1.5
2.5
3.5
4.5
Executive Summary

 100% coverage found within good 3G coverage range( within 70 RSCP)in front of SCB building
 Ec\No improved almost 97% (within ~12)and 99%(within ~14) . Further optimization works ongoing
 No 3G-2G Toggling occurred during field test.