Installation part
Hairf Network Power Beijing Co ., Ltd
Up air supply/ Front displacement Up air supply/ Down displacement Down air supply/ Up displacement
Hairf Network Power Beijing Co ., Ltd
saving.
Hairf Network Power Beijing Co ., Ltd
Air conditioner installation location should be away from severe corrosive gas, flammable
gas or pipeline. Avoid places prone to noise and vibration. Try to shorten the length
between indoor and outdoor unit and choose place where is easy to do maintenance ,
ventilation and installation. Indoor air condition unit installation should take full account
of interior space and layout and make reasonable air distribution, flow. The outdoor unit
should not occupy hallways, stairs, exits and other public places and fire exits in the
building, should also consider environmental protection, the relevant provisions of the
installation wall is hollow brick material, should use longer lead screw
that appropriate space should be left between the floor and the
unit and the bracket. Down-flow model requires floor height of not
dirt area which may Clog the coils. In addition, condenser should not
be placed near steam, hot air or flue gas discharge source so as not to
rope buffer.
Hairf Network Power Beijing Co ., Ltd
material.
Hairf Network Power Beijing Co ., Ltd
All pipe connections must be copper. Laying should be smooth vertical and horizontal.
Copper pipe and pipe fittings inside and outside should be kept clean and dry. Bend
radius should be greater than five times the radius of the corner. When pipe pass
through the wall or floor in the installation, casing should be added and tilt outward to
prevent water intrusion. welding joint should not be left in the casing and should be
brackets or hangers. The max gap for pipeline of less than 25mm should be 1m; max
gap for pipeline of less than 40mm should be 1.5m and should consider the expansion
Indoor unit to outdoor unit (10m)室 Indoor unit to outdoor unit (20m)室 Indoor unit to outdoor unit (40m)室
内机至室外机 10米 内机至室外机 20米 内机至室外机 40米
Model 型号
Gas pipe Liquid pipe Gas pipe Liquid pipe Gas pipe Liquid pipe
diameter气管直 diameter液管直 diameter气管直 diameter液管直 diameter气管直 diameter液管直
径(mm2) 径(mm2) 径(mm2) 径(mm2) 径(mm2) 径(mm2)
HADC/HAUC 16 12 19 12 19 16
0061-0131
HADC/HAUC 16 12 19 16 22 16
0161-0191
HADR/HAUR 22 16 22 19 25 19
0201-0301
HADR/HAUR 22 19 25 19 28 22
0401
HADR/HAUR 16 12 19 16 22 16
0272-0362
HADR/HAUR 22 16 22 16 25 19
0422-0512
HADR/HAUR 22 16 22 19 25 19
0552-0602
HADR/HAUR 22 19 28 19 28 22
0692-0912
HADR/HAUR 28 19 28 19 28 22
1022
Hairf Network Power Beijing Co ., Ltd
Intubate the abutting pipes well and copper pipe unilateral gap is
0.05mm-0.15mm.
Correct muff-coupling a. Assembly b. Muff-coupling c. Caulking d. Too much gap e. Gap too small
tilt length too short uneven
Hairf Network Power Beijing Co ., Ltd
Welding of pipelines:
The copper pipe muff-coupling depth should be 15-20mm. Adjust the welding
temperature to 780 ℃ -860 ℃ neutral flame. Flame cast along the pipe to
ensure uniform heating within the cup-shaped mouth and near the 10mm
range. When the pipe and the cup is heated to welding temperature showing
dark red color, add solder from the other side of the flame. When the solder
is fully melted, slightly move the flame away to 40 mm-60mm range; add
solder to the other side, and so after the solder melts sufficiently, move
pressure maintained 0.05MPa; when welding, should wrap the welding parts
Pipe dirt blowing should be conducted before welding of indoor and outdoor unit. Mount
the pressure regulating valve on the nitrogen cylinder, respectively blow from the high
point of the place for gas pipe and liquid pipe. Open nitrogen regulation valve gradually
pressurized to 0.6MPa, armed with suitable sealing material against the copper pipe
mouth; When the pressure is increased until your hand can not press against any more,
suddenly release the nozzle (complete dirt blowing for first time; Repeat the above steps
repeatedly until no visual dirt exists. Repeat the above steps repeatedly blowing dirt, no
visual dirt qualified. After completion of dirt blowing should immediately do welding to
After the completion of the pipeline welding ,should hold pressure test. R22
drop, then it means it is qualified. (Because the gas pressure varies with
≤100℃.
0.8MPa, joint 25mm faucet, length of 1.5m, the front end must be
Pressure
Usually there are two kinds of emptying methods: self emptying and
gauge
pressure gauge connected to AC high pressure side. Open all the valves
completion of the emptying, close pressure gauge valve first, close the
Refrigerant charge:
When the refrigeration pipeline installation distance exceeds the standard length, should
add refrigerant and refrigeration oil in order to make the system run normally.
制冷剂添加量=延长液管长度X单位长度添加量
Refrigerant gas adding amount= liquid pipe exceeded length X adding amount per length
Adding amount
Controller operation
Hairf Network Power Beijing Co ., Ltd
Input / output board connection
Hairf Network Power Beijing Co ., Ltd
Optional accessories connection
Hairf Network Power Beijing Co ., Ltd
On-duty-turns control circuit diagram
Hairf Network Power Beijing Co ., Ltd
Humidification control
Hairf Network Power Beijing Co ., Ltd
Daily check
Important warning:
1. In the operation of the humidifier, must cut off the power supply in
advance;
2. The humidifier is likely to be hot, let it cool or wear protective gloves
before touch.