LeeBoy India
Construction Equipment Pvt. Ltd.
Bengaluru
By,
Mohan BK
(R17MDD02)
Objectives of Internship
• Crawler mounted
Drill-Rigs
• Backhoe Loaders
- 699
• Patcher – RA 400
Job Profile
Assigned in:
Manufacturing and Operation Department
Internship Period:
26th June 2018 to 27th July 2018
Activities Performed
Sub
Assemblies
Turn Table
Engine + Rear axle + Sub-
Transmission Base Sub-
Tandem Assembly Assembly
Drive + Hub
• Rear axle, tandem drive subassembly and engine-transmission
Stage 1 assembly are mounted on chassis.
• Ease of operating
fuel line for different
storage locations in
shop floor
2. SOP for Motor Grader
985’s Boom Hose
Connection
• To prevent mismatch of
hose connections during
assembly
• Easy understanding of
Hose assembly even for
layman
• Time saving while
assembling the hoses.
3. SOP for Motor Grader
785’s Boom Hose
Connection.
4. SOP for Motor Grader
985’s Control Valve
Hose Connection.
5. SOP for Motor Grader
785’s Control Valve
Hose Connection.
6. SOP for Motor Grader
985’s Boom Front
Hose Connection.
7. SOP for Motor Grader
785’s Boom Front
Hose Connection.
Intern's Key Observation
Employees are very cooperative to each other.
Employees are always ready to do what they are asked to do.
All staffs are positive to the interns and they are ready to make us
learn about the operation of the organization.
Proper Communication between the employees and top level
management.
Good Production and operation management.
Key Skills Learnt