Define Measure Analyze Improve Control
Wave No: <xx>
Review Date: <xx/xx/xxxx>
LEAN
SIX SIGMA
Program Name
Lean Six Sigma
LEAN
SIX SIGMA
Control
“Descriptive Project Title”
Process Capability Analysis for Average Spee
Customer Profile – 28,000 Retail Business Process Capability – Before
LSL
USL
Process Data
Results/Benefits CP U
CP L
0.51
1.46
After the 3 month project, the customer saved US$150K,
Cpk
Cpm
or 0.51
*
30%, as a result of reduced end user downtime. 0 10 20 30 40
Overall (LT ) Capability Obs erved P erform anc e E xpec ted S T P erform anc e E xpec ted LT P erform an
Pp 0.72 P P M < LS L 0.00 P P M < LS L 6.29 P P M < LS L 67
PPU 0.38 P P M > US L 130177.51 P P M > US L 62109.19 P P M > US L 12967
Bonacorsi Consulting 3
Control
Project “Storyboard” – Example
Define 1.2 Day
Project Charter CTQ Gap Sigma
Performanc
BUS CASE: Be #2 Fin Service Provider e Level of
1.3
GOAL: Reduce Loan/Lease CT from
9.2 to 8.0 days by July 1
Measure
FIN IMPACT: $2.7M per year Analyze
Control
Improve
Pilot Plan
Loan or
Lease
Screen
Entry
Color
Printouts
Rewards
& Recog
Work & Turnover, Waiting, & Automation
Affect CT; Job Aids affect Variation in CT Flex
Time
Bonacorsi Consulting 4
Program Name
Lean Six Sigma
LEAN
SIX SIGMA
Project Charter Control
Bonacorsi Consulting 6
Control
Measure Overview
Process Capability Graphical Analysis
I-MR Chart of Delivery Time
CTQ: ? 40
U C L=37.70
Unit (d) or Mean (c): ?
Individual Value
35
DPMO (d): ? 25
20 LC L=20.56
1 28 55 82 109 136 163 190 217 244
Moving Range
7.5
5.0
MSA Results: show the percentage result of the 2.5
__
M R=3.22
Bonacorsi Consulting 7
Control
Analyze Overview
Hypothesis Tests Value-Add Analysis
Hypothesis Test Factor (x) Value Add Analysis - Current State
(ANOVA, 1 or 2 sample t - test, Chi Squared, p Value Observations/Conclusion
Regression, Test of Equal Variance, etc) Tested Takt Tim e = 55
Significant factor - 1 hour driving time from DC 80
Bonacorsi Consulting 8
Improve Summary
Control
Type 2: Describe the chain of causality that shows how you determined the Type 2 savings. (tell the story
with cause–effect relationships, on how the proposed change should create the desired financial result
(savings) in your project )
Describe the Type 3 Business Impact(s) areas and how these were measured
Assumption #1 (i.e. project is driven by the Business strategy?)
Assumption #2 (i.e. Customer service rating, employee moral, etc…)
Other Questions
Stakeholders agree on the project’s impact and how it will be measured in financial terms?
What steps were taken to ensure the integrity & accuracy of the data?
Has the project tracking worksheet been updated?
1. ?
2. ?
3. ?
4. ?
5. ?
6. ?
7. ?
8. ?
9. ?
10.?
Bonacorsi Consulting 13
Sign Off
Control
Once the project is complete and has been reviewed by the Green Belt/Black Belt or other Quality
mentor, the project should be reviewed with Deployment Champion, Project Sponsor, Process
Owner, Master Black Belt and other project or process stakeholders. In addition, financial benefits
of the project (or the method used to estimate financial benefits) should be confirmed by your
Process Owner and/or finance representative.
• Policies & Procedures for the Improve and Control phases were documented and communicated on
MM/DD/YY
• I understand the New Policies and Procedures
• I understand and take responsibility for monitoring the Defect Measurements as delineated in the
Control Plan
• I will report the progress on this subprocess on a regular basis to the customer (internal or external)
• I have reviewed this project’s financial benefits with the Deployment Champion, Sponsor and Finance
• I understand the corrective action procedure and am responsible for ensuring that action items are
completed to hold the gains and capture the financial benefits
Enter Name Here Enter Name Here Enter Name Here Enter Name Here
Sponsor / Process Owner Executive Director Financial Representative Green Belt/Black Belt
Enter Name Here Enter Name Here Enter Name Here Enter Name Here
Deployment Champion “Other” Key Stakeholder “Other” Key Stakeholder Master Black Belt
Bonacorsi Consulting 14
Control
Project Contributors
Steering Team Support Team
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>: <Contribution>
<Name>
Has Successfully Participated In The
“Project Name”
Your Commitment to the Program Name is Recognized as the
Driving Force Behind the Future Success of Your Organization, Incorporated.
Month XX, XXXX to Month XX, XXXX
Bonacorsi Consulting 16
Bonacorsi Consulting
This Training Manual and all materials, procedures and systems herein contained or depicted (the
"Manual"), are the sole and exclusive property of Bonacorsi Consulting, L.L.C.
The contents hereof contain proprietary trade secrets that are the private and confidential property
of Bonacorsi Consulting. Unauthorized use, disclosure, or reproduction of any kind of any material
contained in this Manual is expressly prohibited. The contents hereof are to be returned
immediately upon termination of any relationship or agreement giving user authorization to possess
or use such information or materials. Any unauthorized or illegal use shall subject the user to all
remedies, both legal and equitable, available to Bonacorsi Consulting. This Manual may be altered,
amended or supplemented by Bonacorsi Consulting from time to time. In the event of any
inconsistency or conflict between a provision in this Manual and any federal, provincial, state or local
statute, regulation, order or other law, such law will supersede the conflicting or inconsistent
provision(s) of this Manual in all properties subject to that law.
Bonacorsi Consulting 17