PROCEDURE
© SSIPL 2009
PRECAUTION
PLANT SHOULD BE IN OFF CONDITION
CHARGING HOPPER IN BOTTOM POSITION
04/03/19
© SCHWING Stetter (India) Private Limited
TOOLS REQUIRMENT
10-11 RING DOUBLE END SPANNER
16-17 RING DOUBLE END SPANNER
18-19 RING DOUBLE END SPANNER
21-23 RING DOUBLE END SPANNER
SCREW DRIVER
HAMMER
CUTTING PLIER
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the ‘U’ clamp using 16-17 spanne
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the hose clip using 16-17 spanner
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the sheet
04/03/19
© SCHWING Stetter (India) Private Limited
Unwind the skip
drum and remove
rope, wedge
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the ‘U’ Clamp using 21-
23 spanner
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the pin using cutting plier
04/03/19
© SCHWING Stetter (India) Private Limited
Remove the Sealing sheet fixing
bolt using 16-17 spanner
04/03/19
© SCHWING Stetter (India) Private Limited
Bind end of the both ropes and
insert to rope pulley
New Rope
Old Rope
04/03/19
© SCHWING Stetter (India) Private Limited
Insert the lower side of rope to drum
and put ‘U’ clamp
04/03/19
© SCHWING Stetter (India) Private Limited
Insert the rope as shown in fig.
Wedge
Skip rope
04/03/19
© SCHWING Stetter (India) Private Limited
Wind the rope in the drum 3 rounds
after releasing the break
04/03/19
© SCHWING Stetter (India) Private Limited
Fix the sheet and hose clip
04/03/19
© SCHWING Stetter (India) Private Limited
Insert the upper side rope to Axle
and put ‘U’ clamp, pin
04/03/19
© SCHWING Stetter (India) Private Limited
SKIP ROPE ALLIGNMENT
Rope slack should be
positioned as shown in
picture
04/03/19
© SCHWING Stetter (India) Private Limited
THANK YOU
BY
SSIPL-KOCHI
04/03/19
© SCHWING Stetter (India) Private Limited