Beruflich Dokumente
Kultur Dokumente
iSYSTEM
PROJECT PLAN
Ghifari
Vira Prameswa
Yolanda ri
53416019
57416563
Sayidat
i Farisha
Karima
56416883 Irwayu
Eka 52416676
Setianings
ih
52416278
3
iSYS
The understanding of the daily traffic pattern in Jakarta alone
TEM
is not enough for the system to generate the optimal solution
that has to be given for the users. We want to achieve the
system should be smart enough to predict which drivers are
taking every day to reach a certain destination, and also
understanding and knowing how to allocate and manage the
number of roads / routes.
4
IDENTIFICATION
iSYSTEM
1 Identifying
Requirement
$
$
$
IDENTIFICATION $
$
iSYSTEM $
2 Identifying
Cost
a. Informations b. Infrastructures
• Traffic Monitoring : Rp. 50.000.000 Range per person : Rp. 4.000.000 - Rp.10.000.000
• Network : Rp. 40.000.000
3 Identifying
Challenges
a. Accurancy
b. Security and Privacy Violations
6
ANALYSIS
iSYSTEM
Traffic Allocation
1 Management
To determine the maximum number
of vehicles that can go to certain
routes. Considering how many road
signs and stop signs in each route
can also help us to determine the
optimal solution or in this case, the
fastest route.
USER
iSYSTEM
1 Modularity
d. Delivering
Provide interface in mobile
application
10
Application in Software
Principle
iSYSTEM
2 Abstraction
The abstraction of our system design can be presented in four steps: Information Gathering, Control System,
Processing, and Delivering.
3 Incrementality