Sie sind auf Seite 1von 8

‫تقرير زيارة التفتيش الميداني‬

Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Wooden staircase are damaged need modification properly all
gap must be covered properly to avoid any hazards

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Working platform of erected scaffolding mid-rail not available
any risk can be occurs need to provide mid-rail immediately to
avoid unwanted hazards

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Near the opening edge of the concrete platform need to provide
hard barricading system to avoid falling hazards.

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Unsafe ladder this “ A’’ type ladder not allowed to use in
scaffolding immediately replace and provide “ H ‘’ type ladder
to fixed properly it will easy & safe for use.

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahalal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Live cable laid on the floor need to hanging system and safe
from unwanted risk from electrocution & other risk.

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Unsafe platform of the erected scaffolding there is too much
gapping between in proper walkway platform there is serious
incident/accident can occurs immediately covered the gap make
proper platform

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
Unsafe temporary wooden access need to provide step type
condition it will be easy to walkway

After
‫تقرير زيارة التفتيش الميداني‬
Inspection Report

Contractor : Nesma Electric Name: Engr. S M Belal Rizvi


Before
Site: Al Shahlal Position: Consultant Safety
110/13.8KV Engineer
Date:23/11/2017 Dept: Civil and Electro
Mechanical
Comments:
There is no warning sign available on the DB. Nee to provide

After

Das könnte Ihnen auch gefallen