Sie sind auf Seite 1von 10

ZTE NetMAX Application Case

Virtual Drive Test Analysis Report


Virtual Drive Test-based on AGPS MR
1 Route Definition 2 Data Extraction 3 VDT Data Presentation
Import DT data / electronic map of road Extract AGPS information from MR/CDT, Analyze raster data, display coverage and
information, used to generate route auxiliary fitting algorithm, matched to other network problem information.
grid. the route grid.
Route A

Route B

AGPS

Select
Select analysis
analysis
route
route Performance Implementation
V-DT auto analysis
Select analysis
analysis improvement plan and verification
Select
event
event

Select
Select analysis
analysis KPI
KPI Coverage
Call Drop
Import
Import CDT/MR
CDT/MR access Perfecting
V-DT data collection Discussion
report
report handover optimization scheme
© ZTE Corporation. All rights reserved
2
Pre-difine Route

User-defined route

route management

Import\Export
Delete\Preview

Multi formats

 CSV
 XLS
 TAB

© ZTE Corporation. All rights reserved


3
Set Analysis Task
11~14. UL Weak Coverage Setting:
1. NE setting when the MR number is more than 5
2. VDT road setting and the Txpower is lager than 15, the
3. Region Setting(optional) system set it as a UL weak coverge MR,
4. MR data source setting this kind of MR is more than 5 pieces
5. Frequence setting, analyze and more than 10% , the grid is UL
U900 and U2100 Coverage by weak coverage grid.
the frequency setting 15~17. DL Weak Coverage Setting:
6. MR type setting(AGPS) same with the DL, but set the rscp and
7. when the MR data number Ec/Io instead.
is lager than the threshold, the 18~20. Overshooting Setting:
grid will be analyze The MR, which far way from server cell
8. show the average value of more than 1000m, will be considered,
grid the RSCP lager than -85 and the Ec/Io
9. Grid size setting: 10/20/50m lager than -12 is overshooting MR,whe
10. Good value thresd setting: this kind of MR is more than 10% in
RSCP > - 100, Ec/Io > -14 grid, the grid is Overshooting coverage
Tx power > 0 grid.
© ZTE Corporation. All rights reserved
4
Present result of Coverage
By VDT, we can statistics the KPI, check the coverage distribution:

map

Grid statistics

Segmentation statistics
vdt report.xlsx

© ZTE Corporation. All rights reserved


5
Present result of coverage issues
To see where there is coverage problem, support link with the serving cell:

© ZTE Corporation. All rights reserved


6
Present result of Event
statistics the KPI, drill down the call
record:

© ZTE Corporation. All rights reserved


7
Analysis result of Event- call drop
Correlation analysis with weak coverage , it's obviously that the call drop
caused by poor coverage

© ZTE Corporation. All rights reserved


8
Summary
 No need to drive test we can get the information on the road.

 Support to statistics the coverage KPI and event KPI.

 Identify the coverage problem.

 Drill down the abnormal event and analysis.

 One key report, easy to check.

© ZTE Corporation. All rights reserved


9
Thank You !
Thank you

Das könnte Ihnen auch gefallen