O = Overall
E = Equipment
E = Effectiveness
Overall Equipment Effectiveness is
a total measure of how
effective installations are working
SETUP & ADJUSTMENT
MAJOR LOSSES
2. Material hard
3. Machine vibrating
4. Voltage down
30 X 24 = 720 Hrs
Planned Production Time
OEE = 0.61
Six Big Losses Target
Breakdown Zero
Availability
Setup & Minimize
Adjustment
Reduced Zero
Overall Speed
Equipment Performance
rate Idling &
Effectiveness
Minor Zero
Stoppages
120 MINS
STAGE I
80 MINS
TOTAL SET UP TIME
Segregate
40 MINS
Internal
External Convert some
Elements Internal STAGE III
Elements or
parts of those
to External Reduce times of 7 MINS
Elements residual Internal
Elements
Benefits From OEE
• Integrated platform and simultaneously focusing on three
factors namely Availability, Performance & Quality
Core equipment :
Generates final output for the shop & shortfall
may affect the subsequent operation/shop
Capital cost is considerably high and adding
additional capacity is not feasible
Critical equipment
Directly affecting performance of the core
equipment
Total Planned Down Time (PDT)
(Annual)
Planned Production
Planned Time (PPT)
Planned
Annual Shut Breaks (24*365 - Total Planned
Preventive Holidays Total Planned
down (Tea & Lunch Down Time)
Maintt. (Hours / Down Time
(Hours / Breaks)
(Hours / Annum) (Hrs / Annum)
Annum) (Hours /
Annum)
Annum)
a b c d e = ( a+b+c+d) f = ( 24*365 - e )
Core and Critical Equipment Selection for OEE
g h I = f - (g+h) j k
Speed Losses (SL)
Net Operating
Time (NOT) =
Idling / (GOT - SL)
Reduced
minor
Speed
stoppages (Hours / Annum)
(Hours /
(Hours /
Annum)
Annum)
m n L = I - (m+n)
Current Quality Rating
Quality Losses (QL)
in %
Valuable Operating
Time (VOT) = (NOT
Defects / - QL)
Start up
Rework /
losses Variation
Rejections (Hours / Annum) Average
(Hours / (Range)
(Hours /
Annum)
Annum)
o p q = L - (o+p) r s
Assumptions
Performance
• In some shops budgeted rate is considered as reference,
however potential to produce at higher rate is possible
– it is to be ascertained
Capacity
• Present capacity of the equipment is considered as
reference, however it further requires need for
revisiting to establish scope for revision