Limited
Established in 1991
A subsidiary of Taurus Group
Headquartered in Bangalore, India
Leading developer of Test & Measurement Instruments for Power Sector
Leadership position in Fault Locating & Analyzing Systems
ISO 9001:2008 Certified Company
Geographic Focus: India, Middle East Asia, Africa, Japan and APAC
HVDC Line
R & D Trails Fault Analyzer MAX-3 EHF
1991 2001 2013
EHT Line
Fault Locator MAX- 2 Fault INVOLT
1992 2002 Analyzer 2014
ACCUMAX- 3
Earth Tester Fault Analyzer
1998 2009
Insulator
Z-CHECK
Tester
2000 2011
Partial Customer List
Taurus First…..
Corona
Hotline Tools
Automated data capturing and Analysis
11
30
16
Power Transmission
Institutions 31
19
76 46
49
Power Distribution 56 80
178
91 40 103
88 78
Railways
23
446
254
Power Generation 54
610
4 132
Power Distribution
Industry
120
Institutions (30)
Power Transmission 72
Taurus – Value Proposition
Preventive Maintenance
Uptime Deployment
Risk assessment
Disaster
Safety Fault Location
Man Recovery Fault correction.
Machine. Faster Deployment
Material.
Taurus Differentiator - Lines
Sl.No Activity Description
Health at top of the tower
1 Signature Analysis Capturing the Line Signature of EHV lines. Comparing
Health at bottom of the tower with earlier signature (if available) and analysing the
Health along the line condition of the line
Data Capture 2 Tower Leakage Measuring the Leakage current of Tower body
Data Storage current measurement
Data Analysis
3 Ultrasound Scanning Checking Insulators for possible deterioration
Health Forecasting 4 Hot Spot Detection Detecting Hot Spots on jumper joints & tower
components
5 Corona Detection Detecting Corona on Insulator Strings on each tower
6 Tower Impedance Checking Resistance & Impedance of Tower footing as
per IEEE guidelines.
7 Transmission Line - Inspecting various objects/ components on tower and
Inspection the line such as Tower Stub Condition. Earthing. Missing
nut bolts. Step Bolts. Anti-Climbing guard. Tower
members. Danger Board, Phase plate, Number plate.
Condition of Armouring, Vibration Damper, Arcing horn,
Spacer, Bird Guard, Split pin. Insulator – Broken,
Contaminated, Flash over, polluted. Condition of
Conductor H/w and Earthwire H/w.
8 GPS Mapping Capturing Geo location and creating map with photos
Taurus Differentiator – Sub Stations
Description
Sl.No Activity
Loss Data
Measurement
Leakage Analytics
Aerial Patrolling
Addressable Market
Strengths Weakness
•Cautious in adoption in new technologies
• Strong Technology adoptability •Manpower cost in India is very low
• High business potential •Un-organized market place
• High volume transmission network •Customer does not differentiate between 90% - 100%
( 25000 ckt KM of 765 kV network) •Data analysis in the power O&M segment has not gathered
momentum
OT
Opportunities
Threats
• Very big market place (Including rural area)
• Many players with lot of variants • High growth potential
• Lower entry barrier & driven on pricing • Data analytics and decision making gaining momentum
• Need to grow faster than the market and competition • Compulsions increasing on service providers to be efficient
• Customer does not differentiate between 90% and 100% • Safety , disaster management are becoming important
• Longer sales cycle for total/larger projects • Compliance becoming important
• Authenticity of the data captured through manual processes
Our Observations – market place
765 kV Network - Cant be covered from the ground. Aerial scanning requirement is justified.
India has around 90 Nos, 765 kV lines with around 25 – 30k Ckt Kms
One time, Measurement of Sag and ground clearance during installation is a must ( Lidar) along
with Line Signature Analysis.
Is a hygiene which justifies the expenditure
Very cumbersome for the whole line to do manually
Time is a constraint to do manual exercise.
Line cross over analysis
Compliance
Vegetation processing
Authenticity of data
No of lines Tripped during AMJ 2017 - JAS 2018
Quarter
Apr-June 2017
July-Sep 2017
Oct -Dec 2017
Jan -Mar 2018
Apr -Jun 2018
Jul -Sep 2018
Source CEA Qtrly
PGCIL is leading. The large network Txn Cos will follow Viz – UPPTCL
80 – 765 kV lines @ 22000 ckt KM
ESSEL Infra – Another lower hanging . Intends to outsource all activities for a cost
Maharashtra ( MSETCL)
8 GPS Mapping Capturing Geo location and creating map with photos
Taurus Differentiator - Aerial
Signature Analysis
Corona Detection
Maintaining uptime
Signature Analysis
Scope of work Capturing the Line Signature, Analysing it and submitting a report.
Shutdown is required for about 2 Hrs to carry out this task.
Object Checked Complete Transmission Line
Test Equipment Taurus Max3 – Fault Analyser
CIRCUIT-I
Suspected Short Category In-Homogeneity.
These points to be inspected
39KM
43.5KM
47KM
51KM
71.6KM
Tower Footing Impedence Measurement
GPS Location
Scope of work Capturing the Exact GPS location and reporting
Object Checked Tower
Test Equipment GPS Tracker
Sample Report for Ultrasound Scanning & Tower Leakage Current of Transmission Line
Line : 400 kV Double Ckt Line
String Ultra Ultrasound Leakage
Date Tower Ckt Phase Side No Sound Audio File Current Ω
12-09-2014 1 I R Dhule 2 Low 6009.wav 0.009
12-09-2014 7 II B Bhopal 1 Low 6010.wav 0.007
12-09-2014 8 I B Bhopal 1 Low 6011.wav 0.008
13-09-2014 23 I R Bhopal 2 High 6025.wav
13-09-2014 23 I Y Dhule 2 High 6025.wav 2.5
13-09-2014 23 II R Dhule Pilot Medium 6025.wav
13-09-2014 26 II R Dhule 1 Medium 6026.wav 0.9
14-09-2014 27 I Y Bhopal 1 Low 7001wav 0.004
19-09-2014 72 I B Bhopal 1 Low 7004.wav 0.007
19-09-2014 72 I B Dhule 2 Low 7005.wav 0.029
22-09-2014 105 I B Bhopal 2 Low 7077.wav 0.050
25-09-2014 126 I R Dhule 1 Low 7078.wav 0.006
27-09-2014 145 II R Bhopal 2 Low 7079.wav 0.007
27-09-2014 146 II Y Bhopal 1 High 7080.wav 1.2
27-09-2014 147 II B Bhopal 1 Medium 7081.wav 0.5
Hot Spot Detection
Thermovision Scanning
Scope of work To inspect, Identify Hot Spots on Hardware joints and to submit the report
Object Checked Tension Hardware, Repair Sleeve, Mid Span Joint
Test Equipment Thermovision Camera
Corona Detection
1. Line & Tower inspection Flying 2. Operating the device to capture data
3. Data analysis
Aerial Patrolling Operations…
SWEDEN
Why Collaboration ?
Recently, PGCIL stated “They have not got the desired benefits out of the Aerial experiment”
Pricing
a. The customer needs help
b. Require a story and a formulae
What next ?
a. Secure the next 15,000 KM Aerial Tender (PGCIL)
b. Create new opportunities
Modus Operandi …..