DATA PEMBANGKIT
Hitunglah:
a) LOLE
b) LOEE
c) EIR
TABEL PROBABILITAS
Capacity
Total Keterangan:
Unit 1 Unit 2 Unit 3 Unit 4 out of Capacity Individual Cumulative
Time tk LOLP (%) 1=Pembangkit Bekerja
(50 MW) (50 MW) (60 MW) (60 MW) service in Service Probability Probability
(%)
(MW) 0=Pembangkit Mati
1 1 1 1 0 220 0.94128804 1 0 0
0 1 1 1 50 170 0.00950796 0.05871196 0 0
1 0 1 1 50 170 0.00950796 0.049204 0 0
1 1 0 1 60 160 0.01920996 0.03969604 9.433962 0.181226
1 1 1 0 60 160 0.01920996 0.02048608 9.433962 0.181226
0 0 1 1 100 120 0.00009604 0.00127612 47.16981 0.00453
0 1 0 1 110 110 0.00019404 0.00118008 56.60377 0.010983
1 0 0 1 110 110 0.00019404 0.00098604 56.60377 0.010983
0 1 1 0 110 110 0.00019404 0.000792 56.60377 0.010983
1 0 1 0 110 110 0.00019404 0.00059796 56.60377 0.010983
1 1 0 0 120 100 0.00039204 0.00040392 66.03774 0.025889
0 0 0 1 160 60 0.00000196 0.00001188 100 0.000196
0 0 1 0 160 60 0.00000196 0.00000992 100 0.000196
0 1 0 0 170 50 0.00000396 0.00000796 100 0.000396
1 0 0 0 170 50 0.00000396 0.000004 100 0.000396
0 0 0 0 220 0 0.00000004 0.00000004 100 0.000004
TABEL SEDERHANA
Capacity
out of Capacity Individual Total Time
LOLP (%)
service in Service Probability tk (%)
(MW)
0 220 0.94128804 0 0
50 170 0.00950796 0 0
60 160 0.01920996 9.433962 0.181226
100 120 0.00009604 47.16981 0.00453
110 110 0.00019404 56.60377 0.010983
120 100 0.00039204 66.03774 0.025889
160 60 0.00000196 100 0.000196
170 50 0.00000396 100 0.000396
220 0 0.00000004 100 0.000004
MENGHITUNG LOLE (LOSS OF LOADS
EXPECTATION)
• Total LOLP = 0.223225
365
• LOLE = 0.223225 x
100
= 0.814771 Hari/Tahun
KURVA DURASI BEBAN
LOAD DURATION CURVE • Keterangan:
Installed Capacity = 220 MW
220 • Ok = Capacity
O = 50 MW
O1 = 60 MW
210
Outage
200
O2 = 100 MW
190 • tk = Percent of Time
O3 = 110 MW
180
Load
O3 = 120 MW
170
160
150 t1 = 9.433962%
140
Capacity in service
130
t2 = 47.16981 %
120
110
t3 = 56.60377 %
100
t4 = 66.03774 %
90
y = -1.06x + 170
80
70
64
60
50
40
30
20
10
0
0 10 20 30 40 50 60 70 80 90 100
Time (%)
MENGHITUNG E K
(64+170)
E= 𝑥100 = 11700
2
MENGHITUNG EIR (ENERGY INDEX OF
RELIABILITY)
• EENS = EK.PK • LOEEPU =
𝐿𝑂𝐸𝐸
𝐸
(Expected Energy
not Supplied)