Agenda
1
Approach
2
Approach (continued)
Saudi Standards,
Metrology and
Quality Organization Int. & local labs
• Working sessions with
the SASO Governor and • Workshop with all
Deputy Governor, as local & int. private
well as weekly input testing laboratories
from SASO ASHRAE / AHRI • Input on capacity
representatives building and best
• Input on standards, • Workshops with the American Society practices
label and governance of Heating, Refrigeration & Air-
Conditioning Engineers, and the Air-
conditioning, Heating & Refrigeration
Institute
• Input on best-practices
3
Saudi standard SASO 2663/2012:
Energy labeling and minimum energy performance requirements for air-conditioners
New SASO
Old Label New Label logo
Information
about the EER
Information
about annual
electricity
consumption
Legal mention
to mandate
presence of
energy
efficiency label
before selling
Source: Saudi Standards, Metrology and Quality Organization 6
Phased implementation of the modified Saudi standard
SASO 2663/2012
7
May June July August 1 January 1 January
September
2013 2013 2013 2013 2014 2015
2013
SASO 2663/2012 will be regularly updated in accordance with the American Society of
Heating, Refrigerating and Air-Conditioning Engineers standard, ASHRAE 90.1
7
Energy efficiency label licensing procedure for imported and
locally manufactured air-conditioners - SASO
Starting from 7/9/2013, SASO will not issue licenses to air-conditioners that do not
comply with phase 1 of the modified standard; and starting 1/1/2015 for phase 2
• The license issued by SASO to use the energy efficiency label gives its holder the
“right to use the label” and this does not imply the right to import the product
or trade it in the market
• The license is complementary to the surveillance work conducted by Saudi
Customs and the Ministry of Commerce and Industry
• The license design has been updated
License to
During the transition period from today until 7 September 2013:
use the • The license will be issued according to the new design while keeping the validity
energy period of 2 years
efficiency • Old licenses will be replaced with new ones and the recipients will be notified that
label their license is still valid for the remaining period without any extra charges
issued by • Old labels will be replaced with new ones
SASO • Recipients of licenses not compliant with the modified standard will be informed
that they will maintain the right to use the label but the modified standard will
prohibit them from selling their products in the market after the specified dates
for each phase
9
Agenda
• Modified Saudi standard SASO 2663/2012 and energy efficiency label licensing (for
imported and locally manufactured air-conditioners)
10
Ports of entry of air-conditioners
# of
3,129
shipments
# of imported
air-conditioner 2,668,013
units
• Samples are taken from shipments and only safety tests are conducted
• Accredited private testing labs conduct safety and energy efficiency tests
• Energy efficiency tests will be conducted in accordance with the modified
Tests
SASO standard
(Private labs) • The importer will bear the cost of the test as is the case for the safety
tests
• If the test results are positive, the shipment is allowed into the market
Test Results • If the test results are negative, the shipment is not allowed into the
market 12
Agenda
• Modified Saudi standard SASO 2663/2012 and energy efficiency label licensing (for
imported and locally manufactured air-conditioners)
13
Enforcement mechanism for locally manufactured air-
conditioners at production line – MoCI
MoCI will not allow locally manufactured air-conditioners not compliant with
the modified standard to be sold in the Saudi market
Phase 1: starting 7/9/2013
Phase 2: starting 1/1/2015
Production • Production line inspection to make sure of:
line - The presence of correct labels for energy efficiency and safety of the
Inspection product
(MoCI) - The presence of the product in the database of SASO
• Accredited private testing labs conduct safety and energy efficiency tests
• Energy efficiency tests will be conducted in accordance with the modified
Tests
SASO standard
(Private labs) • The local manufacturer will bear the cost of the test as is the case for
imported products and as is the process for safety tests
• If the test results are positive, the product is allowed into the market
Test Results
• If the test results are negative, the product is not allowed into the market
14
Enforcement mechanism for locally manufactured and
imported air-conditioners in-Kingdom – MoCI
MoCI will not allow the sale of air-conditioners not compliant with the
modified standard
Phase 1: starting 1/1/2014
Phase 2: starting 1/1/2015
Retailers & • Inspection of air-conditioners displayed at retailers and distributors to
make sure of:
distributors
- The existence of correct labels for energy efficiency and safety of the
Inspection product
(MoCI) - The presence of the product in the database of SASO
• Sampling of air-conditioners according to the sampling plan specified in
Sampling
the Kingdom
(MoCI) • Samples are sent to accredited private testing labs
• Accredited private testing labs conduct safety and energy efficiency tests
• Energy efficiency tests will be conducted in accordance with the modified
Tests SASO standard
(Private labs) • The manufacturer/importer will bear the cost of the test if the result is
negative
• The ministry will bear the cost of the test if the result is positive
• If the test results are positive, the product is allowed to be sold in the
market
Test Results
• If the test results are negative, the dealer or distributor will be punished
and the air-conditioner will be pulled from the market
15
Thank you
16