LAYOUT
AND
PIPING
1
FDC Piping
Major Activities by FDC piping
OVERALL PLOT PLAN STUDIES
2
FDC Piping
Major Activities by FDC piping
PIPE STRESS ANALYSIS & SUPPORT SKETCHES
PREPARATION OF ISOMETRICS
3
FDC Piping
Unit Plot Plan
Unit plot plan is prepared for each process unit. Basic Engg Contractor /
Licensor provides guide line document based on which the unit plot plan
is developed.
For Offsites & Utilities overall site plan is developed by the Department
intergrating with the overall site plan.
4
FDC Piping
Piping Materials
Material take-off preliminary is issued for bulk loading to PMMS
Updating & control of material quantities with design by periodic
transfer\download of 3D models
Monitoring of material requisitions.
Data sheets for all special items are prepared
Automatic transfer \control of material between construction, stores and
Engineering is achieved
Project Stock Code Index generated Piping Material Class wise is issued as a
project specification.
Changes in piping specifications are controlled automatically between material
group and piping design group
Proper control of material by means of revisions are taken care in different systems
such as PDS, Pipeworks, PTS, PMMS etc.
Transmit a summary of all Instruments (Instrument MTO) to Instrument Group
for requisitioning.
5
FDC Piping
Material Control
Initial material take off from :
– Completed preliminary line routings in the CAD model
– Manual take off from P&IDs
Total forecast material requirements including working surplus and
contingency form the basis of the Bulk Material Requisitions.
Frequency & timing of material extractions from CAD model &
manual MTO ensure that bulk material status is concurrent with
design.
Field material control is possible as the data within the piping material
control programme is downloaded to Procurement Tracking System.
Material requisitions issued to procurement for enquiry/ purchase.
MR quantities issued for purchase (initial & at each revision) are
downloaded to Procurement Tracking System.
6
FDC Piping
Piping & Equipment Modelling
FDC has a capacity of 40 PDS stations and all modelling activities are
done from here.
All civil pipe supports are modelled by piping for civil group to do
their detailed design
Reports on various activities like insulation painting etc are created
and transferred to the concerned groups for their detailing
Instrumentation XYZ locations are transferred in the form of reports as
well as drawings to instrumentation for their detailing
Nozzle orientation sketches are created and given to Equipment group
Sleeper schedule is a deliverable issued to civil and construction from
Piping
Procedure for doing stress analysis with direct transfer of neutral files
from PDS to Caesor is being set up.
Material control thru model transfer
7
FDC Piping
Piping Layout Preparation
Piping arrangement drawings produced in two stages:
8
FDC Piping
Piping Layout Preparation
GA Using 3D CAD Model
– G.A. drawings are extracted from 3D CAD model if required by
construction
– OR model is downloaded to DRV sessions at construction site.
Non-CAD GAs
– Additional Pipe support GA’s issued for construction to reflect pipe
support requirements only (upon construction demand)
Piping stringing Drawings
– For pipe racks and sleeper runs stringing drawings are prepared for
ease of construction
9
FDC Piping
Pipe Stress Analysis
To ensure that piping is routed and supported so that no damage occurs to
either the pipe or associated equipment due to the effects of thermal
expansion or contraction, or loads resulting from weight, pressure, wind
earthquake, pulsation, shock, foundation settlement, etc.
Ensuring compliance to all Code, Client and Inspection Authority
requirements pertaining to Piping Stress Analysis.
Establishing all operating functions including start-up, shutdown, steam-
out, various combinations of equipment working and idle, bypasses in
and out of use, de-coking, etc., for lines to be analyzed.
Stress Critical Line List Review.
Nozzle loads calculations and transfer of the same to Equipment group
for their review/action
Special support sketches, if any, are made and transferred to civil for
their further action
10
FDC Piping
Pipe Stress Analysis
Anchor loads on structures and/or foundations are transferred to civil
Review of vendor drawings for equipment nozzle loading.
11
FDC Piping
Piping Isometrics
Isometrics using 3D CAD Model
– Isometrics, the final deliverable of Piping group are extracted from 3D CAD
model
– Material is downloaded from model.
– Engineering Isometrics to be downloaded for piping spool drawings and
erection isometrics are prepared.
Non-CAD Isometrics
– Manually prepared on Isometric Sheet viz steam tracing
– Material to be manually entered.
12
FDC Piping
Misc Detail Engg Deliverables
Plot Plan
General Arrangement Drawing
Rack Stringing Drawing
Nozzle Orientation Sketches
Sleeper Schedule
CPS Schedule
Fire Water GA Drawings
Engineering Isometrics
Spool Isometrics
IFC (Erection) Isometrics
Various Misc Inputs for other Departments in Report format
13
FDC Piping
Statutory Requirements
All required approvals of the statutory bodies come in the responsibility of
FDC piping such as;
Indian Boiler Regulations (IBR)
– Materials and fabrication associated with steam and boiler feed
systems.
Chief Controller of Explosives. (CCOE)
– All Plot Plans for approval together with safety radii from various
sources. (Hazardous Area Drawings).
Tariff Advisory Committee (TAC)
– Fire protection system & material selection
14
FDC Piping
Design Packages
CEASAR
PLANT DESIGN SYSTEM
MICROSTATION
AUTOCAD 2000
DESIGN REVIEW
PIPE WORKS
PTS / PMMS
SPOOLGEN
Other in House Developed Softwares
15
FDC Piping
Volume Handled
Engineering Deliverables
CPS Quantity : 6000
Engineering Isometrics : 28000 (Big bore & Small bore)
Spool Sheets : 140000
Erection Isometrics : 60000
ISO Indices : 60
16
FDC Piping - Capability