In preparation for your project’s Design Reviews, model diagrams with examples of System Architecture, Technology Stack, Security
Design, Performance Design, Physical Design, and Multi Data Center Integration can be accessed from the following SharePoint site
pages. Since these example diagrams are located on an internal SharePoint site, if you would like to see the example diagrams but don’t
have access to the site, please request them from your CMS project manager/project lead.

PDF: https://share.cms.gov/office/ois/Services/TRB/TRB%20Samples/TRB%20Sample%20Architectural%20Diagrams.pdf
Visio: https://share.cms.gov/office/ois/Services/TRB/TRB%20Samples/TRB%20Sample%20Architectural%20Diagrams.vsd 1
Template Instructions

This document is a template for the Preliminary Design Review (PDR).

Sections should not be removed from the presentation. If a section is not


applicable, please indicate as such and provide an explanation.

Additional slides may be added to convey information that you feel is


important to share that is not addressed by this template.

Please ensure that your presentation is Section 508 compliant


by following the URL:
http://www.hhs.gov/web/policies/checklistppt.html

DELETE THIS SLIDE BEFORE FINALIZING


YOUR PRESENTATION

2
Template Revision History
Version Date Author Description of Changes

1.0 09/16/2009 K. Maenner, OIS/DITPPA Baseline Version


1. Removed planned tests from the
Test Plan page.
1.1 01/15/2010 K. Maenner, OIS/DITPPA
2. Added slides to discuss Project
Management.
Corrected Slide 8 (Design
1.3 06/11/2010 C. Shaunessy, OIS/DITG Considerations) to correspond to
Section 5 of SDD.

1.4 07/14/2011 C. Shaunessy, OIS/DITG Added cost/schedule slide

2.0 04/23/2012 C. Shaunessy, OIS/DITG Reformatted for XLC.


Replaced CMS logo; deleted slide
3.0 05/01/2014 C. Shaunessy, OIS/DITG background image. Incorporated
changes per CR 13-005 and 14-004.
Added/updated Performance
Measures slide per CR 14-010. Added
3.1 08/2014 C. Shaunessy, OIS/DITG Clarity ID to title slide. Added note
about new model system architecture
diagrams.
3.2 02/2015 S.Potu, OEI/DPPIG Updated CMS logo.

DELETE THIS SLIDE BEFORE FINALIZING YOUR PRESENTATION 3


Presenters

Presenter’s Name Role

See this slide’s notes pages for slide instructions.

4
High Level Business Concept

[Insert graphic providing a high-level overview of the business process from


Section 5 of the Business Case.]

5
Project Information

Business Need
[Insert condensed business need and drivers from the Business Case or from the
AR presentation]

Goals/Scope/Purpose
[Insert condensed goals/scope from the Business Case and the business and
functional purpose from the Requirements Document or from the AR
presentation]

Stakeholders
[Insert stakeholder information from the Business Case or from the AR
presentation]

Cloud Services
[Are you planning to use cloud services now or in the future?]

6
Proposed System

System Scope
[Insert condensed system scope from the High-Level Technical Design.]

High Level Functional Requirements


[Insert high level functional requirements from the High Level Technical
Design.]

Summary of Changes
[Insert condensed summary of changes of the current system from the High-
Level Technical Design (if applicable).]

7
AR Findings

[Identify any recommendations and/or findings from the AR and their


resolution.]

8
Records Management

[Describe where the system’s data will reside and identify any data exchanges that may
occur. Alternatively, you may attach Section 5.1.7 of the project’s Requirements
document.]
• Inputs: Identify all data (as well as the format of the data—paper, manual input,
electronic data) supplied to the system as well as who/what is supplying the data.
• Provide instructions on what happens to the manual/electronic inputs after they
are entered into the master file/database and are verified.
• Master Files – Provide a detailed description of the data maintained in the
system/database.
• Provide detailed instructions for the retention and disposition of this data (where
will the data be maintained, when will the data be deleted or destroyed).
• Outputs: List all reports, data sharing with other Agencies/CMS systems, etc.
• Provide instructions for how long the reports are needed for Agency business and
when they should be destroyed/deleted.
• Is this system replacing a paper-based records system or an existing electronic
system? If electronic, has the migration of the legacy data been addressed?
9
Design Considerations

[Summarize the design goals and guidelines, development methods and


contingencies, and architectural strategies as described in the System Design
Document.]

10
Design Considerations

508 Compliance
[If applicable, briefly describe what 508 testing will be done, from Sections
5.4 & 5.5 of the System Design Document?]
Performance
[If applicable, briefly describe what hardware and software performance
strategies will be implemented, from Sections 3, 4.2.2, & 4.3.2 of the
System Design Document?]
Security
[If applicable, briefly describe what security features are being implemented,
from Sections 3, 4.2.1 & 4.3.1 of the Systems Design Document?]
[If applicable, briefly describe how are any outstanding High or Moderate
findings and/or SEV1 or SEV 2 issues being addressed?]

11
Design Considerations

Technical Reference Architecture (TRA)


[If applicable, briefly describe from Section 3 & 4 of the System Design
Document, how the system is TRA compliant and address any non-
compliance issues, specifically:
– What application code is being reengineered to comply with the TRA?
– What business logic code is being separated from the data access
logic code?
– What business logic is being moved from the data tier to the
application tier?
– How will the system provide indirect access from the application to
the data tier since direct access is not allowed?]

12
Design Considerations
Shared Services
[If applicable, briefly describe from Section 3 & 4 of the System Design
Document…
What new shared services will be created?
How will any new shared services being developed be consumable by other
projects?
What existing shared services will be consumed?]

Non-shared Service Reusable Components


[If applicable, briefly describe from Section 3 & 4 of the System Design
Document…
What new reusable components will be developed?
How can any new reusable components being developed be reused by other
projects?
What existing reusable components will be implemented?] 13
Design Considerations

Software Architecture
[If applicable, briefly describe from Sections 3, & 4.3 of the System Design
Document…
What are the key software design decisions based on the mapping of the
requirements to the prioritized Quality Attributes (aka non-functional
requirements)? E.g. If Modifiability is more important than Performance,
then it is highly probable that a different solution will be designed.
What is being designed to enhance automation and to ensure that
parameters, URIs, URLs, port numbers, and other variables can be
changed without recompiling the code and/or restarting the application?
What industry standard software patterns are being implemented in the
software architecture to create a repeatable development processes?]

14
Design Considerations

Data Architecture
[If applicable, briefly describe from Section 3 & 4.4 of the System Design
Document…
What is being done to align with the Enterprise Data Models?
What is being done to reduce the amount of data being stored for non-
system of record data?
What is being done to use existing system of record data, e.g. Integrated
Data Repository (IDR) data, in a non-persistent or temporary manner?
What conformed data entities are being created to support new/existing
functionality?
What existing data entities are being conformed to support new/existing
functionality?]

15
Design Considerations

Business Intelligence
[If applicable, briefly describe from Section 3 & 4.4 of the System Design
Document…
What enterprise data models will be used to support both reports and
dashboards?
What methodology will be implemented to ensure no duplication of data or
logic is required to support both reports and dashboards?]

Portal Architecture
[If applicable, briefly describe from Section 3 & 4.3 of the System Design
Document…
What existing portlets will be consumed?
What new portlets will be reusable by other projects?]

16
System Architecture

[Insert the system architecture diagram depicting the overall,


integrated structure of the system in terms of presentation,
application and data regions including data storage and
manipulation, user and external interfaces from the System
Design Document.]

17
Performance Measurement Area Technology

Technology Measurement Measurement Benchmark (if


Target
Component Category/ Grouping Indicator applicable)
(See Notes) (See Notes) (See Notes) (See Notes) (See Notes)

18
Response Data

• Operational / System Environment


• System Interconnection / Information Sharing
• System Security Level
• E-Authentication Level:

See this slide’s notes pages for slide instructions.

19
Test Plan

[Insert the testing approach / strategy from Section 4 of the Test Plan.]

20
Release Plan

[Insert the release content and schedule from Sections 3.3 and 3.4 of the
Release Plan.]

21
Data Conversion

[Insert the data conversion scope from Section 5.1 of the Data Conversion
Plan.]

22
Project Management Update:
Status

[Provide an update on the status of the project.]

23
Project Management Update:
Risks & Issues

[Provide an update on the project risks and issues,


including the probability of occurrence and the
mitigation for each risk.]

24
Project Management Update:
Cost & Schedule

• Cost
• Schedule

See this slide’s notes pages for slide instructions.

25
Project Management Update:
Deliverables Status

[Provide an update on the status of the deliverables required


for the project as documented in the Project Process
Agreement. Also provide an update on the status of your
Information Security Certification & Authorization process.]

26
Centers for Medicare & Medicaid Services
eXpedited Life Cycle (XLC)

Conclusion of Preliminary Design Review


for [insert project name]

27

Das könnte Ihnen auch gefallen