Weekly Report: Week 1

Agenda :
1: About Laminating Factory.
2: The Relationship Between Technicians And Departments
To Solve Problems.

Reporter: Duong Gia Bao


07.05.2019
TAPACK 1
1.About Laminating Factory
1.1 Organizational Structure
Manager

Duputy Manager

Production
Technician Shift Leader Preparation

Deputy Shift
Extrusion Dry Leader Raw
TPM Adhesive Planning
Coating Laminating Material
Machine Chief
Responsible for managing each shift:
Workers  1 Shift manager.
 1 Deputy shift manager.

TAPACK 2
1.About Laminating Factory
1.1 Organizational Structure
Laminators

Extrusion Dry
Coating Laminating

1 Lip 2 Lips 2 Lips Co-ex Solvent Free Solvent

T8 T9 T5 T4 T6 T7 T11
T3 T10 T14 Chief:
Chief: Chief: Chief: Chief: Chief: Chief:
Chief: T12 Chief: Chief: Mr. Tuan
Mr. Phuc Mr. Phuoc Mr. Mong Mr. Huan Mr. Phuc Mr. Tinh
Mr. Tue No Use Mr. Ngoc Mr. Quoc Mr. Tuan
Mr. Duy Mr. Quoc Mr. Phu Mr. Bang Mr. Khiem Mr.Phuong
Mr. Phuc Mr. An Mr.Thien Mr. Luc
Mr. Cang Mr.Dam Mr. Banh Mr. Hung Mr.Thi

TAPACK 3
1.About Laminating Factory
1.2 Laminating Factory Layout Drawing
T5 T8 T12
SLITTING
T9 AGING ROOM
ROOM 2

T3 4 INSPECTION
3 BORDER CUTTING MACHINES
MACHINES
T11 T7

SLITTING
ROOM 1 4 PRINTERS
T4 2
T6 PRINTERS
ADHESIVE
MIXING ZONE

1
PRINTER

SLITTING AND BAG MAKING


MANAGER ROOM ROOM
T10 T14 TAPACK 4
2.The relationship between technicians and departments to solve
problems.

R&D

LAB QA

KTV

Workers QC

TAPACK 5
2.The relationship between technicians and departments to solve
problems.

 Ensuring machine/equipment are safe to operate, reliability for


Technician

operation with highest efficiency.


Workers  Finding root cause of technical breakdown of machine/equipment.
 Proposing prevention action in order to avoid re-occurrence of the
breakdown and/or reduce the impact.
 Monitoring the parameter of the machines.

 Technician and R&D work  Conduct product evaluation

Technician
Technician

R&D

LAB
together to run the new meet the spec.
products.  Support measuring technical
standards of raw materials as
 Technology-related issues well as products.
TAPACK 6
2.The relationship between technicians and departments to solve
problems.

Technician

Technician
QA

QC
 When the raw material and finished - good  When appearing the noncomformity
appears defects. (NC) in the working shift .

 Finding out the root cause of trouble in


TAPACK 7
the production line.
The supporting works.
How to solve NC when the product can not out of the warehouse.

Step1: Determine if NC belong to laminating factory?


-Yes: Continue
-No: Reject

Step2: - Take some samples to test again.


- Wait the result from LAB room.

Step3: Recieve the result from LAB room.


- If achieve good result follow standards Accept.
- If No achieve Find reason.

TAPACK 8