Sie sind auf Seite 1von 22

PRESENTATION ON INDUSTRIAL TRAINING AT

JR TOOLS

 SUBMITTED TO :

 Prof. P. A. MANE
TABLE OF CONTENT

1. INTRODUCTION
2. MACHINE SHOP LAYOUT
3. MACHINES
4. CASE STUDY
5. INSPECTION
6. LEARNING OUTCOMES
7. CONCLUSION
INTRODUCTION
 JR Tools is founded in 1998 at J10, Gokul Shirgaon MIDC
 Area 6 acres
 Established for Manufacture of equipment and spares for Tractors
and other parts as per market requirement.
Certificates
Machine shop layout
Foundry
Machining Inspection Dispatch
product
Machine shop

DRILLING
Drilling is a cutting process that uses
a drill bit to cut or enlarge a hole of
circular cross-section in solid
materials. The drill bit is a rotary
cutting tool, often multipoint. The bit
is pressed against the workpiece and
rotated at rates from hundreds to
thousands
of revolutions per minute. This
forces the cutting edge against the
workpiece , cutting off chips from
the hole as it is drilled.
Comet radial
drilling machine
LATHE

 10" Chuck Plate


 Used For Threading
 Mfg.-
Akshar Machine Tools
Honest Company
HONEST A 1(RAJKOT)
CNC Machine
 A numerical control system in which the data handling,
control sequences, and response to input is determined
by an on-board computer system at the machine tool.
 A CNC machine consist of following 6 major elements:
a. Input Device b. Machine Control Unit
c.Machine Tool d. Driving System e. Feedback
Devices f. Display Unit
 Controlled by G and M codes.
 These are number values and co-ordinates
 Function: Milling, Drilling, Taping, Boring, Grooving, Facing
Vertical Machining Centres
(VMC)
 • Operations : Milling, Facing, Drilling, Boring,
Grooving,
 Taping, Broaching, Turn Cut out and many more.
 • Axis: 3 Axis, x, y and z Axis.
 • 2 Plate for non-stop working.
 • 18 Tool Holder.
Codes
 G code
 M code
VMC at industry

Lokesh VML 800 series BMV 51 (Vayu)


TOOL MAGAZINE
Case study

1ST setup on Drilling Machine

 Operations: Drilling
 Cycle Time: 5 minutes
 Drilling to make 4 holes
2ND Setup on 1st VMC

Operations: Milling
Cycle Time: 20 minutes
 3rd Setup on VMC (Vertical Machining
Centre)

 Operations: Drilling,
 Cycle Time: 8 minutes.
 Drilling to make 2 holes
of diameter 20mm
 on 1st face (top face)
4. Inspection

 Destructive
 Non destructive
• flatness
• depth
• Radius

Inspection table
Dispatch
LEARNING OUTCOMES

1. Learned about environment inside foundry shop


2. Scope of improvement
3. Labor consideration
4. Handling of machines
5. Safety needs and regulation
CONCLUSION

 The JR Tools is a well know industry manufacturing equipment of


different industries.
 The industry is utilizing its waste resources for the development of
the industry and taking care of the safety and environment.
 Very high technology is introduced and is a industry for producing
a variety of products. The profit of an organization entirely
depends on the way the top chairs manage the resources the
organization has. Whatever the other aspects may be, it was seen
that managing human resource was extremely difficult. The
stability or the sustainability of the organization mostly depends on
this factor.
 In most cases it could be seen that there exists easier or better
ways to do something. Adopting new methods provide efficient
use of resources and can enhance the effectiveness of the work

Das könnte Ihnen auch gefallen