SYSTEMS
OF
POWER PLANTS
AND
INDUTRIAL
PLANTS
COVERAGE
TYPICAL SCHEMES
COMPARISION OF SCHEMES
SELECTION OF VOLTAGES
AUXILIARY LOAD DATA
SELECTION OF GENERATOR TRANSFORMER
SELECTION OF MOTORS FOR VARIOUS DRIVES
DISTRIBUTION OF AUXILIARIES
SELECTION OF NUMBER AND RATING OF UNIT
TRANSFORMERS
DESIGN OF AUXILIARY SYSTEM FOR
THERMAL POWER LPLANT
HV LOADS
ID FAN - 0.60
FD FAN - 0.70
OTHER HV LOADS - 0.8
LV LOADS
CONTINUOUS LOADS - 0.80
INTERMITTANT LOADS - 0.20
STARTING CURRENT OF MOTORS AND
VOLTAGE DIPS
STARTING CURRENT
LV MOTORS - 6 times + 20% positive tolerance
HV MOTORS UPTO 1500 kW - 6 times inclusive of tolerance
HV MOTORS above 1500 kW - 4.50 times
LOAD ESTIMATION
REQUIREMENTS OF ELECTRICAL
SYSTEM
FAILURE OF TRANSFORMER
3.3<Un<=6.6 200
6.6<Un<=11 1000
INCOMING SUPPLY VOLTAGE
Vs
CONTRACT DEMAND
(As Per APTRANCO GAZETTE)
2 1501 - 5000 33