Beruflich Dokumente
Kultur Dokumente
TEST REPORT
(BARACKS ALABA)
DATE: 29/10/2010
Drive Test summary
Drive Test was carried on Airtel Nigeria GSM network in Lgaos city with the
following details;
DT tools: 2 UEs ( TEMS inv. V 9.0), 1 GPS, 1 power inverter and 1 high capability
laptop
Test time: 4:00pm
City: Baracks Alaba Lagos
DT date: 29/10/2010
Resource: 1 DT engineer, 1 vehicle and 1 driver
DT engineer:
Analysis engineer: Abba Jude O.
Contents
Drive Test summary
Events Statistics
RAU Satistics
Optimization Tracker
Rx Level Plot(UE)
Rx Quality Plot(UE)
RLC Throughput_DL Plot
RLC Throughput_DL Plot
RLC Throughput_DL Plot
Area of PDP Context Activation Failure
Area of RAU Failure Event
PDP Context Activation Statistics
Poor_Cove PDP_Reque
Sector ServDis rage_Thre st_timer_T Latit Longit Occur
EventTime Name Cause PDP Failure RxlevIdleBCCHBSIC t shold hreshold Time ude ude ences
GPRS PDP
Context
20:59:42:3 T3380 Activation 283.934 6365 6.49 3.170
50 LG0459C Time-out Failure -60 114 67 891 -95 30000 0 687 87 26
GPRS PDP
Context
21:00:03:9 T3380 Activation 303.033 8528 6.49
80 LG0459C Time-out Failure -59 114 67 809 -95 30000 0 669 3.171 65
GPRS PDP
Context
21:00:34:0 T3380 Activation 527.525 1153 6.49 3.172
00 LG0459C Time-out Failure -84 114 67 45 -95 30000 00 477 33 19
RAU Statistics
Poor_Cov
EventTi Sector RAU RxlevI BSI erage_Thr Latit Longitud Occure
me Name Cause Failure dle BCCH C ServDist eshold Time ude e nces