Sie sind auf Seite 1von 31

PARTNER EXCELLENCE CENTER

INDONESIA

Method of Procedure
MOP

BTS Equipment Installation


MOP002-BEI
Structure of Nokia UltraSite Base Station
Power Supply Units Base Operations and
• DC (0-3) Interface Unit (1)
• AC (0-2)
Transmission Units (1-4)
TRX Baseband Units • FC E1/T1
• GSM (0-6) • FXC E1
• EDGE GSM (0-6) • FXC E1/T1
• FXC RRI
TRX RF Units
• GSM (0-12)
• EDGE GSM (0-12)
Combiners & Duplex Filters
Receiver • Dual Duplex Unit (0-6)
Multicoupler Units • Wide Band Combiner (0-9)
• 2-way (0-6) • Remote Tune Combiner (0-2)
• 6-way (0-2)
ULTRASITE BASE STATION
INDOOR CABINET
• Cabinet Dimension ; Height: 1800mm, Width: 600mm, Depth: 570mm
• Cabinet Maximum Weight ; 270kg (84kg without units)
• Operational Temperature ; -5…+50°C
• Ingress Protection Class: IP 20
• Maximum Power Consumption DC/AC:
– 1 TRX (TRX alone): 200 W (GSM900) and 220-230 W (GSM1800)
– 6 TRX: 1400W / 1600W
– 12 TRX: 2800W / 3200W
• Permitted Input Voltage Range:
– IBBU (AC): 166...276V (50...60Hz)
– PWSA (AC): 184...276V (45...60Hz)
– PWSB (DC): -36...-60V
• Fuse Rates:
– IBBU (AC): 3x10A / 1x30A
– PWSA (AC): 3x16A / 1x32A
– PWSB (DC): 140A
ULTRASITE BASE STATION
INDOOR CABINET
• Recommended Cabinet Clearances:
– Front:
• Door opening clearance: 600mm
• Recommended minimum clearance:
900mm
– Back:
• Recommended minimum clearance:
52mm
– Side:
• Door opening clearance: 100mm
– Above:
• Recommended minimum cable
clearance: 300mm
• Recommended minimum cable
clearance when Bias Tee or DU2A is
used: 500mm
ULTRASITE BASE STATION
OUTDOOR CABINET
• Cabinet Dimensions
– Height: 1940mm, Width: 770mm, Depth: 750mm
• Cabinet Maximum Weight:
– 340kg (150kg without units)
• Operational Temperature:
– -10…+50°C (-33°C with Heater)
• Maximum Power Consumption DC/AC:
– 1 TRX (TRX alone): 200 W (GSM900) and 220-230 W
(GSM1800)
– 6 TRX: 1450W / 1650W
– 12 TRX: 2900W / 3300W
• Permitted Input Voltage Range:
– IBBU (AC): 166...276V (50...60Hz)
– PWSA (AC): 184...276V (45...60Hz)
– PWSB (DC): -36...-60V
• Fuse Rates:
– IBBU (AC): 3x10A / 1x30A
– PWSA (AC): 3x16A / 1x32A
– PWSB (DC): 140A
ULTRASITE BASE STATION
OUTDOOR CABINET
Roof in open
position
NOTE: Dimensions mm (in.)
• Recommended Cabinet
Cable Entry Block
(In optional side position)

Clearances:
Roof
stay Roof 52(2.0)
52(2.0)

– Front:
• Door opening clearance:
2500 1940
770mm
(98.4)

1775
(76.4)
• Recommended minimum
Front
(70.0)
Front clearance: 900mm
– Back:
• Recommended minimum
00112392 clearance: 500mm
– Side:
Cabinet 1 Cabinet 2 Cabinet 3
• Door opening clearance: 75mm
– Above:
750
(29.5)
Minimum
75(3.0)

Front
• Recommended minimum
Door
swing
770 (30.3), minimum
width incl. Side Panels clearance: 600mm
770
(30.3)

NOTE: Dimensions: mm (in.) 00112389


Outdoor BTS Lay Out
BTS Rectifier
• Rectifier always put on the right,
• 1st BTS, close (site by site) with
Rectifier
• 2nd BTs, close (site by site) with 1st
BTS
• etc
• All feeder from BTS will use Cable
tray behind BTS
TYPICAL EQUIPMENT STANDARD
Room Layout
• BTS place in the same row PEMBERI TUGAS

• BTS location facing FEP CATATAN / KETERANGAN


CATATAN
CATATAN
CATATAN

DISETUJUI OLEH PT. TELKOMSEL

MAIN CONTRACTOR

SUB CONTRACTOR

DIGAMBAR DIPERIKSA DIKETAHUI

DIGAMBAR DIPERIKSA DIKETAHUI

PROYEK

NAMA GAMBAR

SITE ID LOKASI

REVISI
SKALA
NO. TANGGAL PARAF
SKALA_1 1. 00/00/2004
SKALA_2 2. 00/00/2004
SKALA_3 3. 00/00/2004
NO. REGISTER
OUTDOOR BTS
Correct Position for Rectifier

The BTS door opening should be to


the left away from the rectifier.

The Rectifier has been been


installed in the wrong place .
OUTDOOR RECTIFIER & BATTERY
• FIU Unit will be installed inside the rectifier, 2 units
only
• DDF have to installed Horizontal under indoor unit
10 row

Radio IU

DDF
OUTDOOR BTS
Cable Run into BTS

Feeder cable will be lying on the cable


tray behind the BTS, when bending cable
to the BTS take care you don’t over bend
and put clamps as close to the BTS as
possible for support Cables should look
striate and good to the eye.
BTS Internal Cabling

• Shaped the
cables with
CARE
• Black & white
cable ties are
needed
• Use 1 N/m
Torque Wrench
to tighten SMA
connectors
don’t over
tighten
BTS Internal Cabling

All cables with nice bending radius


BTS Internal Cabling

• Use cable ties for a neat


installation
BTS Door Grounding

All lugs should be sleeved with heat shrink.


B
A

C
1

DC cable from
the Rectifier
2

DC cable from SECTOR 3


the Rectifier Div
3

BTS SECTOR 3
Grounding Main
4

EMP SECTOR 2
Grounding Div
5

SECTOR 2
Main
6

SECTOR 1
Div
7

External Alarm
OUTDOOR BTS FEEDER ENTRY

SECTOR 1
Cable to the Main
8

Rectifier

PCM Cable
OUTDOOR BTS
FEEDER AND CABLE ENTRY

Always use Heat Shrink at the end of Conduit for a good seal to stop water
getting into conduit and BTS
OUTDOOR BTS

• Arrestor,s have to be installed inside


the BTS in Jakarta and Outside in
West Java with waterproof taping and
a cable box cover .
• Diplexer will be installed outside the
BTS but inside a waterproof box.
RECTIFIER OUTDOOR
CABLE ENTRY

External Alarm
Cable to the

DC Cable

DC Cable
Rectifier

You must always have a space between Power cables and Alarm cable
RECTIFIER OUTDOOR
CABLE ENTRY

External Alarm Cable DC Cable


to the Rectifier
Wrong Right
You must always have a space between Power cables and alarm cable
COMBINER

• Grounding cable is
required for the combiner,
diplexer and triplexes and
have to be integrated with
the main grounding system
CABLE

Cables should run on the tray, not cut corners or under the tray.
Use WHITE Cable Ties for all Cabling inside room and shelter
STANDARD INDOOR DDF INSTALLATION
(1)
(2)

• 1- All cables must be inserted inside this


cable cable ducting
• 2 - KRONE DDF box must be use in this
indoor TRS or Customer Alarm system (3)
interconnection.
• 3 - KRONE LSA plus DDF with 10 slots,and
cover label for better tracing of cables.
• 4 - PCM cable 2pair,0.4mm must fixed as (4)
neat as possible use cable 2.5”white cable
ties for better grooming of cables.And punch
it accordingly at the DDF and test it one by
one using ohmeter.Put the corresponding
label on each pair of cables.
• 5 - Alarm cable NOKIA supplied cable
accessories of intratalk and US cabinet use (5)
cable 2.5”white for better grooming.Put
Nokia label for maintenance purposes.And
test it one by one.
INDOOR INSTALLATION
DC cable from
the Rectifier

DC cable from
the Rectifier
BTS
Grounding
outside BTS

EMP
Grounding
Outside BTS
Outside BTS

External Alarm
Cable to the
Rectifier

PCM Cable
BTS Labeling

to the Rectifier
External Alarm Cable
Inside BTS

EMP
Grounding
BTS
from the
Rectifier
DC cables

Main Busbar
Grounding to
Other BTS Labeling

External Alarm
Cable from
Radio Link PCM Cable Rectifier and Main Busbar
BTS to DDF

All labeling numbers can be


found in this file
Inside Shelter Labeling

Always use Heat Shrink Yellow Label Marker Last MCB always for FAN unit
4 Where the top
BTS Feeder Labeling
Jumper joins to the We need to have 4 points of Feeder Labeling so we don’t get
Antenna Crossed feeders

3 Where the Feeder joins the top Jumper

1 Before the Feeder Enters the BTS

SECTOR 2
SECTOR 3

SECTOR 3

SECTOR 2

SECTOR 1

SECTOR 1
Main
Main

Main
Div

Div

Div
2 Where the Bottom
Jumper joins the Main
Feeder
Feeder Labeling Position
• Outdoor BTS
1
BTS
BTS JUMPER
ANTENNA 4
JUMPER

2 FEEDER 3

• Indoor BTS
BTS
JUMPER
1 ANTENNA
JUMPER
FEP 4
2 FEEDER 3
BTS
Remove excess materials from site.
Base stations are equipment rooms not store rooms.

Das könnte Ihnen auch gefallen