INDONESIA
Method of Procedure
MOP
Clearances:
Roof
stay Roof 52(2.0)
52(2.0)
– Front:
• Door opening clearance:
2500 1940
770mm
(98.4)
1775
(76.4)
• Recommended minimum
Front
(70.0)
Front clearance: 900mm
– Back:
• Recommended minimum
00112392 clearance: 500mm
– Side:
Cabinet 1 Cabinet 2 Cabinet 3
• Door opening clearance: 75mm
– Above:
750
(29.5)
Minimum
75(3.0)
Front
• Recommended minimum
Door
swing
770 (30.3), minimum
width incl. Side Panels clearance: 600mm
770
(30.3)
MAIN CONTRACTOR
SUB CONTRACTOR
PROYEK
NAMA GAMBAR
SITE ID LOKASI
REVISI
SKALA
NO. TANGGAL PARAF
SKALA_1 1. 00/00/2004
SKALA_2 2. 00/00/2004
SKALA_3 3. 00/00/2004
NO. REGISTER
OUTDOOR BTS
Correct Position for Rectifier
Radio IU
DDF
OUTDOOR BTS
Cable Run into BTS
• Shaped the
cables with
CARE
• Black & white
cable ties are
needed
• Use 1 N/m
Torque Wrench
to tighten SMA
connectors
don’t over
tighten
BTS Internal Cabling
C
1
DC cable from
the Rectifier
2
BTS SECTOR 3
Grounding Main
4
EMP SECTOR 2
Grounding Div
5
SECTOR 2
Main
6
SECTOR 1
Div
7
External Alarm
OUTDOOR BTS FEEDER ENTRY
SECTOR 1
Cable to the Main
8
Rectifier
PCM Cable
OUTDOOR BTS
FEEDER AND CABLE ENTRY
Always use Heat Shrink at the end of Conduit for a good seal to stop water
getting into conduit and BTS
OUTDOOR BTS
External Alarm
Cable to the
DC Cable
DC Cable
Rectifier
You must always have a space between Power cables and Alarm cable
RECTIFIER OUTDOOR
CABLE ENTRY
• Grounding cable is
required for the combiner,
diplexer and triplexes and
have to be integrated with
the main grounding system
CABLE
Cables should run on the tray, not cut corners or under the tray.
Use WHITE Cable Ties for all Cabling inside room and shelter
STANDARD INDOOR DDF INSTALLATION
(1)
(2)
DC cable from
the Rectifier
BTS
Grounding
outside BTS
EMP
Grounding
Outside BTS
Outside BTS
External Alarm
Cable to the
Rectifier
PCM Cable
BTS Labeling
to the Rectifier
External Alarm Cable
Inside BTS
EMP
Grounding
BTS
from the
Rectifier
DC cables
Main Busbar
Grounding to
Other BTS Labeling
External Alarm
Cable from
Radio Link PCM Cable Rectifier and Main Busbar
BTS to DDF
Always use Heat Shrink Yellow Label Marker Last MCB always for FAN unit
4 Where the top
BTS Feeder Labeling
Jumper joins to the We need to have 4 points of Feeder Labeling so we don’t get
Antenna Crossed feeders
SECTOR 2
SECTOR 3
SECTOR 3
SECTOR 2
SECTOR 1
SECTOR 1
Main
Main
Main
Div
Div
Div
2 Where the Bottom
Jumper joins the Main
Feeder
Feeder Labeling Position
• Outdoor BTS
1
BTS
BTS JUMPER
ANTENNA 4
JUMPER
2 FEEDER 3
• Indoor BTS
BTS
JUMPER
1 ANTENNA
JUMPER
FEP 4
2 FEEDER 3
BTS
Remove excess materials from site.
Base stations are equipment rooms not store rooms.