CPWD
Report On
MEP services
for Phase 1C
IIT Jammu
Team of Chief Engineer cum Executive Director,
CPWD for Electrical Works for Phase 1-C is as
under :
(1) Mr. M P Singh, CE cum ED, CPWD
(2) Mr. Sundar Maddali, EE cum SM (Elect.), CPWD
(3) Mr. Kuldeep Sharma, AE (E) , CPWD
(4) Mr. Saurabh Sharma, AE (E) , CPWD
(5) Mr. Yaduveer Singh, AE (E) , CPWD
The following services will be provided in Phas1C :-
1. Internal and external Electrical installations and fans
2. Vertical Transportation ( Lifts and Dumb waiter in Kitchen)
3. CCTV security surveillance system
4. LAN, WiFi and DATA networking
5. Uninterrupted power supply system (UPS)
6. Audio- Video system
7. Building management system (BMS)
8. Supervisory control and data acquisition (SCADA) system
9. Fire Fighting and sprinkler system
10. Fire detection and alarm system
11. 11/0.44 KV Electrical Sub-Stations
12. Street Lighting, Garden and Facade lighting
13. Hydro-pneumatic Water supply pumping system
14. Sewage treatment plant (STP), ETP and WTP system
15. DG set system
16. Heating ventilation and air conditioning (HVAC) system
17. Solar Water heating system
18. HVLS Fans
The following services are not in the scope of work in Phas1C :-
1. IP PBX and IP Telephone hand set
2. Solar PV generation system
1. Internal and external Electrical installations and fans
i) Lifts
ii) Fire fighting system
iii) Fire alarm system
iv) HVAC
v) CCTV
vi) Sub-Station
vii) Water Pumping system
8. Supervisory control and data acquisition (SCADA) system