25%+
Waste
Value
Defects/Construction Complete:
As high as 12 down to <1
Quality Breakthrough
1. Define what good looks like with our partners
2. Objectively look at same data
3. Mock-ups of what good looks like
Waste
Intel providing excessive
requirements &
documentation
Results # of pages
Intel went on a “Doc Diet” 40000
and so far have reduced 30000
44% pages and on our way
to achieve our 75% goal 20000
10000
0
Goal
Waiting
Waiting • Permits & materials
• Bids, procurement process
Standard Sequence
Design Construction
Waiting
8” Duct
Mfg $46.35
Arizona $73.49
US
Distributor Subcontractor GC/DB
MFG
Shipping/
Duty
$107
Ireland
Inventory
Inventory • Parts or tools in the warehouse
• Design packages
After
Before
10 days
23 days
Before After
17% 17% 11%
57% 11%
Value Add Breaks Value Add 32% NVA
NVA VA
VA 57% Breaks
72%
Breaks Testing
11% 0%
Rework
Discussio
Waiting 0%
nRetrievin
21%
2% g
Materials
Moving
Safety
0%
3%
1%
Set-up
Observati
1%
on
VA Cleaning
0%
57% 4%
Consult
Diagram
Measurin
g 0%
0%
Extra Processing
Extra Processing • Checkers checking checkers
• Request for Information
30.00
25.00
20.00
RFI per $M
15.00
10.00
5.00
-
Project Size $M