HRY_LCL_207_SIRSA_ SITE COUNT
HRY_LCL_207_SIRSA_ COMPLAINTS_SUMMARY
Complaint Analysis:
• Dhanauda has total 49 Complaints
• Twin Beam Antenna required at DANO59
• TDD Upgradation Required at DNDA46
BHATTU MANDI
Complaint Analysis:
• Bhattu Mandi has total 81 Complaints
• BTKN69 antenna not moveable stacked by competitor
antenna.
• BTKN36 is 14 meter site.
• BTNK37 surrounded by very dense cluster. New site
required
KATH MANDI, SIRSA
Complaint Analysis:
• SRSA88 is 16 meter site
• SRSA97 TDD upgradation required
• Both high utilized sites
SRSA17 & SRSA42
Complaint Analysis:
• Twin Beam antenna required at SRSA17sector
A&C
• SRSA42 4TH Sector on-aired & optimized,
Complaints reduce from 18th May
TOHANA
Complaint Analysis:
• Tohana have total 157 complaints
• 2 new site TOHN48 & TOHN08 planned near
TOHN04 & TOHN19
• Twin beam antenna required at TOHN09B
ELLENABAD
Complaint Analysis:
• Ellenabad have total 79 complaints
• Twin beam antenna required at ELNA07B & C
• New site required in Ward no-2 near ELNA16
Complaint Analysis:
• Sirsa have total 482 complaints
• SRSA02,SRSA31 & SRSA54 high utilized
• SRSA02 4th sector TDD upgradation required
• TDD upgradation required at SRSA97
DHAMTAN SAHIB
Complaint Analysis:
• Dhamtan Sahib have total 29 complaints
• DNSB11 is high utilized
• 4th sector required at 100 degree
DABWALI
Complaint Analysis:
• Dabwali have total 141 complaints
• DBWL02 & DBWL01 is high utilized
• DBWL16 & DBWL15 is new site planned near DBWL02
& DBWL01 respectively.
NARWANA
Complaint Analysis:
• Narwana have 129 complaints
• NRWN01 & NRWN06 is high utilized
• Twin beam antenna required at NRWN01A & C
• NRWN48 is new site planned near NRWN06
• Total 3 new site planned in town
UJHANA
Complaint Analysis:
• Ujhana have 27 complaints
• As village is very large so single site can't cover
entire village.
• UJNA36 is new site planned
NATHUSARI CHOPTA
Complaint Analysis:
• Chopta have 24 complaints
• Two village Ludesar & Nathsari Kalan at the
distance of 2.8 & 2 Km from CPTA44
• Also inter site distance is very high
• New site required
KHAIRPUR COLONY SIRSA
Complaint Analysis:
• SRSA28 is high utilized
• SRSA81 TDD Upgradation required
• Twin beam required in SRSA28B
UKLANA
Complaint Analysis:
• Uklana have 42 complaints
• Twin beam planned at UKLN21C
• TDD Upgradation required at UKLN33 &
UKLN56
SAMAIN
Complaint Analysis:
• Samain have total 22 complaints
• 4th sector required at 350 degree to cover the
coverage gap
CHAUTALA
Complaint Analysis:
• Chautala have 24 complaints
• Complaints reduce after Pop shifting
• 4th sector TDD upgradation required
PANNIWALA MOTA
Complaint Analysis:
• Total 21 complaints
• Optimization required
FATEHABAD
Complaint Analysis:
• Total 132 complaints
• Very dense cluster, New site FTBD51 is
planned
KARIWALA
Complaint Analysis:
• Total 20 complaints & 11 complaints from the
single customer from Dhani sadan
wali(29.582215°/ 74.580678)
• New site required
• Physical optimization done.
FATEHPURIA
Complaint Analysis:
• Total 20 complaints
• Shekhupuria village is 1.5km away from FTNT22
• New site required
UCHANA
Complaint Analysis:
• Total 30 complaints
• UCNA06 is high utilized
• Twin beam required at UCNA06C