HRY_LCL_207_SIRSA

COMPLAINTS
HRY_LCL_207_SIRSA_ SITE COUNT

Technology 2G(1800) 3G(2100) FD(1800) TD(2300)


Site Count 454 367 454 235

HRY_LCL_207_SIRSA_ COMPLAINTS_SUMMARY

Cluster Name Jan Feb Mar Apr May Extrapol


HRY_LCL_207_Sirsa 8462 6740 9600 5924 5062
Daily 273 241 310 197 163
Voice Total 2092 1592 1698 1394 1104
Voice Daily 67 57 55 46 36
Data Total 6384 4535 7966 4378 4064
Data Daily 206 162 257 146 131
SUMMARY

Final Remarks Count


4th Sector Required 3
4th Sector TDD upgradation required 2
Dual Pole mount Required 1
New Site Planned 7
New Site Required 5
Physical optimization Required 2
Twin Beam Planned 5
Twin Beam Required 4
Under Observation 1
Grand Total 30
HRY_LCL_207_SIRSA_TOP_30
Site Dec Jan Feb March APR 16-May 17-May 18-May 19-May 20-May May Total Final Remarks Kitty Status Planned site
DANO59 67 150 61 149 52 3 5 2 4 5 40 Twin Beam Planned Deployment
BTKN69 89 112 46 75 25 0 3 2 2 0 39 Dual Pole mount Required Deployment
SRSA88 42 15 25 40 10 1 2 1 2 0 38 Physical optimization Required Quality
SRSA17 92 110 68 103 67 3 4 0 3 2 34 Twin Beam Required Planning RFAI Pending SRSA96
SRSA42 25 36 33 62 46 4 4 0 0 1 32 Under Observation Quality Closed
TOHN04 56 63 54 61 19 1 1 2 4 2 32 New Site Planned Deployment SO Pending , High Cost TOHN48
ELNA07 29 36 26 28 24 2 0 1 0 1 32 Twin Beam Planned Deployment
RTYA15 59 38 40 88 32 2 1 1 2 2 31 Twin Beam Required Planning
SRSA02 63 64 61 123 56 1 1 2 0 3 29 4th Sector TDD upgradation required Planning RFAI Pending SRSA07
DNSB11 46 41 19 60 27 2 0 2 4 0 29 4th Sector Required Planning
DBWL02 20 26 17 22 19 0 1 3 0 0 29 New Site Planned Deployment Sp Pending DBWL16
NRWN01 39 49 28 47 27 3 5 2 1 1 28 Twin Beam Required Planning RFAI Pending NRWN28
UJNA35 33 17 17 33 25 4 1 1 0 0 27 New Site Planned Deployment Disp on hold, being P2/P3 UJNA36
CPTA44 28 22 27 49 24 0 3 4 2 4 24 New Site Required Planning
TOHN19 27 26 18 11 20 1 1 0 3 1 24 New Site Planned Deployment SO Pending , High Cost TOHN48
SRSA28 62 82 45 83 37 2 1 1 1 2 23 Twin Beam Planned Deployment RFAI Pending SRSA96
BTNK37 34 35 15 20 17 1 2 4 9 2 22 New Site Required Planning
UKLN21 75 76 80 64 31 2 1 0 0 0 22 Twin Beam Planned Deployment
SMAN15 30 24 33 59 13 1 2 0 2 3 22 4th Sector Required Planning
NRWN06 31 52 17 48 23 1 1 1 1 1 22 New Site Planned Deployment RFAI WIP NRWN43
RTYA81 32 50 27 56 14 4 2 2 0 0 22 4th Sector Required Planning
CTLA37 69 78 48 73 54 0 0 0 0 0 21 4th Sector TDD upgradation required Planning
ELNA16 27 23 19 17 16 0 0 1 1 0 21 New Site Required Planning
PANI48 35 17 15 57 21 2 0 0 2 2 21 Physical optimization Required Quality
FTBD38 16 27 18 34 14 1 1 1 0 0 21 New Site Planned Deployment Installed FTBD51
DBWL01 44 53 35 144 39 2 1 2 3 4 20 New Site Planned Deployment Acquisition in WIP DBWL15
KRWL06 10 18 12 21 20 2 2 0 1 0 20 New Site Required Planning
FTNT22 18 28 19 53 23 2 1 0 2 0 20 New Site Required Planning
TOHN09 25 40 20 21 14 1 5 0 1 0 20 Twin Beam Required Planning SO Pending , High Cost TOHN48
UCNA06 79 79 31 43 22 0 4 1 1 0 19 Twin Beam Planned Deployment
DHANAUDA

Complaint Analysis:
• Dhanauda has total 49 Complaints
• Twin Beam Antenna required at DANO59
• TDD Upgradation Required at DNDA46
BHATTU MANDI

Complaint Analysis:
• Bhattu Mandi has total 81 Complaints
• BTKN69 antenna not moveable stacked by competitor
antenna.
• BTKN36 is 14 meter site.
• BTNK37 surrounded by very dense cluster. New site
required
KATH MANDI, SIRSA

Complaint Analysis:
• SRSA88 is 16 meter site
• SRSA97 TDD upgradation required
• Both high utilized sites
SRSA17 & SRSA42

Complaint Analysis:
• Twin Beam antenna required at SRSA17sector
A&C
• SRSA42 4TH Sector on-aired & optimized,
Complaints reduce from 18th May
TOHANA

Complaint Analysis:
• Tohana have total 157 complaints
• 2 new site TOHN48 & TOHN08 planned near
TOHN04 & TOHN19
• Twin beam antenna required at TOHN09B
ELLENABAD

Complaint Analysis:
• Ellenabad have total 79 complaints
• Twin beam antenna required at ELNA07B & C
• New site required in Ward no-2 near ELNA16

New site required


RATIYA
Complaint Analysis:
• Ratiya have total 100 complaints
• Twin beam antenna required at RTYA15A & B
• 4th Sector required at RTYA81 at 250 degree
SIRSA MAIN MARKET

Complaint Analysis:
• Sirsa have total 482 complaints
• SRSA02,SRSA31 & SRSA54 high utilized
• SRSA02 4th sector TDD upgradation required
• TDD upgradation required at SRSA97
DHAMTAN SAHIB

Complaint Analysis:
• Dhamtan Sahib have total 29 complaints
• DNSB11 is high utilized
• 4th sector required at 100 degree
DABWALI
Complaint Analysis:
• Dabwali have total 141 complaints
• DBWL02 & DBWL01 is high utilized
• DBWL16 & DBWL15 is new site planned near DBWL02
& DBWL01 respectively.
NARWANA
Complaint Analysis:
• Narwana have 129 complaints
• NRWN01 & NRWN06 is high utilized
• Twin beam antenna required at NRWN01A & C
• NRWN48 is new site planned near NRWN06
• Total 3 new site planned in town
UJHANA

Complaint Analysis:
• Ujhana have 27 complaints
• As village is very large so single site can't cover
entire village.
• UJNA36 is new site planned
NATHUSARI CHOPTA

Complaint Analysis:
• Chopta have 24 complaints
• Two village Ludesar & Nathsari Kalan at the
distance of 2.8 & 2 Km from CPTA44
• Also inter site distance is very high
• New site required
KHAIRPUR COLONY SIRSA

Complaint Analysis:
• SRSA28 is high utilized
• SRSA81 TDD Upgradation required
• Twin beam required in SRSA28B
UKLANA

Complaint Analysis:
• Uklana have 42 complaints
• Twin beam planned at UKLN21C
• TDD Upgradation required at UKLN33 &
UKLN56
SAMAIN

Complaint Analysis:
• Samain have total 22 complaints
• 4th sector required at 350 degree to cover the
coverage gap
CHAUTALA

Complaint Analysis:
• Chautala have 24 complaints
• Complaints reduce after Pop shifting
• 4th sector TDD upgradation required
PANNIWALA MOTA

Complaint Analysis:
• Total 21 complaints
• Optimization required
FATEHABAD

Complaint Analysis:
• Total 132 complaints
• Very dense cluster, New site FTBD51 is
planned
KARIWALA

Complaint Analysis:
• Total 20 complaints & 11 complaints from the
single customer from Dhani sadan
wali(29.582215°/ 74.580678)
• New site required
• Physical optimization done.
FATEHPURIA

Complaint Analysis:
• Total 20 complaints
• Shekhupuria village is 1.5km away from FTNT22
• New site required
UCHANA

Complaint Analysis:
• Total 30 complaints
• UCNA06 is high utilized
• Twin beam required at UCNA06C