Location : Blk 14 Lot 1 & 2a Crescent Park West Fort Bonifacio Global City, Taguig City
Owner/Developer : Xcell Property Ventures, Inc.
Contractor : China State (Phils.) Contractor Engineering Construction
PROJECT PRESENTATION
Date : 05 February 2007
Time : 10:00A.M.
Venue : Edsa Shangrila
PROJECT PROPONENTS
Scope of Works: The works for the main Contract Package shall include,
among others, Civil and Structural, Architectural and
Builder’s works for MEPF (roughing-ins, pipe sleeves,
embeds, etc.).
PROJECT MILESTONE
PROJECT MILESTONE
DESCRIPTION MILESTONE DATES DURATION
RECIO+CASAS ARCHITECTS
SP CASTRO & ASSOCIATES INC., DAVIS LANGDON & SEAH (PHIL), INC
ARCHTECTS & LEAD DESIGN
PROJECT MANAGER QUANTITY SURVEYOR
CONSULTANT
CSCEC
PROJECT TEAM
ICON PROJECT
Functions Functions
Material purchasing Financial Support
Equipment Supply Coordination
Technical Support Service
Chinese Staff Mobilization
Site Organization Chart
The ICON Residences Project - CSPCEC
ZHANG JUN
Project Manager
CARMELITO VILLANUEVA
Technical Consultant
WANG YONG CAI LI MING VICTOR A. FRIAS EDWIN PIMENTEL CHEN ANCUN ZHI QIAN ZHU He PengXiang YANG ZHIGANG Wang Wei CHEN ANCUN
Construction Manager Construction Manager Safety Officer Engineering Manager Finance Officer Admin Officer Procurement Manager Labor Department Manager Contract Manager
Quality Control Manager
WANG GUOZHI
Asst Q.C. Manager
Asst. Engineering Manager
H.R. Officer
LI HUAIJUN
Accountant Purchase Officer
Equipment In-Charge Survey Head
Safety Engineers
Nurse
Timekeeper
Construction Group
Nominated Sub-Con
SUB-STRUCTURE
CONSTRUCTION
SITE LOCATION
MAKATI CITY
FORT BONIFACIO
GLOBAL CITY
MANILA AMERICAN
CEMETERY & MEMORIAL
SITE LAY-OUT
MATERIAL
UNLOADING
AREA
gate
guard house
12000 GENERATOR
v
rebar area
lay down area
SUBCONTRACTOR
temporary road
v
OFFICE
v
form area
TEMPORARY FENCE
rebar
v
shed
area
v
fabrication
X
v v v v
GEN-CON OFFICE
/WAREHOUSE
2 (Storey)
exit
PROJECT
MANAGEMENT storage
OFFICE
2 (Storey)
Unloading Area
TEMPORARY FENCE
SP & CSPCEC
Satellite office
e
ous
rd h
gua
GAT
E
TEMPORARY FENCE
AREA 2 AREA 3
08 FEB – 18 APR 07 02 – 30 MAR 07
AREA 1 AREA 4
30 JAN – 12 MAR 07 19 MAR – 22 APR 07
AREA 5
05 – 29 APR 07
AREA 7
AREA 6 14 MAY – 24 JUN 07
23 APR -22 MAY 07
BASEMENT SUSPENDED SLAB SEQUENCE
AREA 6
AREA 4 Edit dates
AREA 5
TOWER CONSTRUCTION
TEMPORARY FACILITIES
TEMFACIL LAY-OUT
1 - CSPCEC OFFICE
2 - PM OFFICE
2 3 – COMFORT ROOM
4 - CSPCEC WAREHOUSE
BASEMENT 1
1
TEMFACIL LAY-OUT
1 – NOMINATED SUBCON
2 – CSPCEC SUBCON
2 3 - CANTEEN
4 – GANG TOILET
3
BASEMENT 2
1
TOWER CRANE LOCATION
Construction Elevator
Construction Elevator
AREA2
TOWER 1
AREA 1
9 DAYS CYCLE TIME
AREA 1
TOWER 2
AREA2
SCHEDULES
1 st
POURING
SCHEDULE
FEBRUARY 23, 2007
SITE LAY-OUT
pumpcrete location
material
unloading AREA 3
area
AREA 2
AREA 4
AREA 1
Retaining Wall
Isolated Footing
AREA 5
AREA 7
AREA 6
TRAFFIC FLOW
ICON RESIDENCE
ACROSS MANILA
GOLF
27t
hS
t.
26t
hS
t.
OP
EN
SPA
CE
25 t
hS
t.
C.S.P.C.E.C
4t
h
Av
e.
TEMFACIL
IVE
e.
DR
Av
AL
h
5t
RIZ 25t
hS
t.
24 t
hS .
t. St
rio
i da
L ap
ROAD
McKINLEY
MOBILIZATION
SCHEDULE
90 DAYS MOBILIZATION SCHEDULE
2007
Item Date
Description Dur JAN FEBRUARY MARCH APRIL
#
Start Finish 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
GENERAL REQUIREMENTS
Mobilization 12-Jan-07 20-Feb-07 40
Temfacil 3-Feb-07 26-Feb-07 60
I FOUNDATION
1.0 AREA 1
A Retaining Wall 30-Jan-07 12-Mar-07 42
B Isolated Footing 28-Feb-07 9-Mar-07 10
C Column 1st lift 21-Feb-07 23-Feb-07 3
D Water Tank 11-Feb-07 24-Mar-07 42
2.0 AREA 2
A Retaining Wall 12-Feb-07 12-Mar-07 29
B Isolated Footing 17-Feb-07 12-Mar-07 24
C Column 1st lift 22-Feb-07 25-Feb-07
D Mat Foundation 19-Feb-07 11-Mar-07 21
Shear wall 19-Mar-07 18-Apr-07 31
3.0 AREA 3
A Retaining Wall 2-Mar-07 26-Mar-07 25
B Isolated Footing 3-Mar-07 28-Mar-07 26
C Column 1st lift 10-Mar-07 13-Mar-07 4
4.0 AREA IV
A Retaining Wall 19-Mar-07 9-Apr-07 22
B Isolated Footing 20-Mar-07 14-Apr-07 26
C Column 1st lift 27-Mar-07 30-Mar-07 4
5.0 AREA 5
A Retaining Wall 4-Apr-07 24-Apr-07 21
B Isolated Footing 5-Apr-07 29-Apr-07 25
C Column 1st lift 11-Apr-07 14-Apr-07 4
D Mat Foundation 7-Apr-07 28-Apr-07 22
II BASEMENT 5
1.0 AREA 1 Foundation :
Slab on Grade 26-Mar-07 3-Apr-07 9
2.0 AREA 2
Slab on Grade 4-Apr-07 12-Apr-07 9
- Area 1- 5
3.0 AREA 3
4.0
Slab on Grade
AREA 4
13-Apr-07 21-Apr-07 9 Basement 5 :
Slab on Grade 22-Apr-07 30-Apr-07 9
III BASEMENT 4 - Area 1- 4 Slab On Grade
1.0 AREA 1
Columns 4-Apr-07 9-Apr-07 6
Retaining Wall 5-Apr-07 9-Apr-07 5 Basement 4 :
Shearwall 5-Apr-07 13-Apr-07 9
Suspended Slab 7-Apr-07 14-Apr-07 8
- Area 1-3 Basement 5-4 vertical structures
2.0 AREA 2
Columns 15-Apr-07 20-Apr-07 6 and area 1 & 2 Suspended slab & beams.
Retaining Wall 16-Apr-07 20-Apr-07 5
Shearwall 16-Apr-07 22-Apr-07 7
Suspended Slab 16-Apr-07 25-Apr-07 10
3.0 AREA 3
Columns 25-Apr-07 30-Apr-07 6
Retaining Wall 26-Apr-07 30-Apr-07 5
Suspended Slab 26-Apr-07 3-May-07 8
I TEMFACIL
GEN-SET 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Service Pick up 1 1111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Service Truck 1 1111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
II EARTHWORKS
Excavation Equipment on Site
Backhoe/Excavator 2 2222222222 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2GENSET
2 2 2 2 2 2 2 2 2 2 -2 2 2 2 2 2 2 2 2 2 12 2 2 2 2
Dump Truck 2 2222222222 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Garbage Dumpster 2 2 2 2 2Service
2 2 2 2 Pick-up
2 2 2 2 2 2 -2 2 2 2 2 2 2 2 2 2 12 2 2 2 2
Tower lights 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Service
1 1 1 1 Truck
1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 11 1 1 1 1
Backfilling Works
Backhoe - 2
Tamping rammer 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
Skid loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Dump
1 1 1 Truck
1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 21 1 1 1 1
Plate compactor 1 1 1 1 1 1 1 1 1 1 1Tamping
1 1 1 1 1rammer
1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 61 1 1 1 1
Water Pump 1 1111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Skid loader - 1
III CONCRETE WORKS
Tower Crane 1 1 1 1 1Plate
1 1 1compactor
1 1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 11 1 1 1 1
Mobile Crane 1 1111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Pumpcrete 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Mobile
1 1 1 1 1Crane
1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 11 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Concrete bucket
Tower Crane - 12 2 2 2 2
Concrete vibrator 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Power Trowel 2 2 2 2 2 2 2 2 2 2 2Concrete
2 2 2 2 2 2 Vibrator-
2 2 2 2 2 2 2 2 2 2 2 2 2 2 32 2 2 2 2
Air Compressor 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Concrete buggy 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6Power
6 6 6 6 6Trowel
6 6 6 6 6 -6 6 6 6 6 6 6 6 6 6 26 6 6 6 6
Pressure washer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
IV FORMWORKS Pressure Washer- 1
Welding Machine 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Oxy/Ace with cutting torch 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Bar
1 1 1cutter/bender-
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Circular Saw 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1ea
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
V REBAR WORKS
Bar Bender 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Welding Mach. - 1
Bar cutter 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1Water
1 1 1 1 pump
1 1 1 1 1 1 -1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1
VII SURVEY WORKS
Total station & Accessories 1 1111111111 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 8 8 8 8 8 8 8 8 8 8 8 11 11 11 11 11 11 13 13 13 13 21 23 23 29 29 29 29 29 29 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 36 39 39 39 39 39 39 41 41 41 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42 42
90 DAYS MANPOWER SCHEDULE
160
140
120
100
80 145
60 130
83 92 97 105 110 120
40 78 78
42 60
20 38
0
1日
8日
1日
8日
5日
日
15
22
15
22
29
12
19
26
2月
2月
3月
3月
4月
2月
2月
3月
3月
3月
4月
4月
4月
年
年
年
年
07
07
07
07
07
07
07
07
07
07
07
07
07
20
20
20
20
20
20
20
20
20
20
20
20
20
WORK
INTERFACE
SCHEDULE
STRUCTURAL & MEPF ROUGHING IN SCHEDULE T1 & T2
2007 2008
Structural Tower 1 Structural Tower 2
LEVEL J F M A M J J A S O N D J F M A M J J A S O N D
Date Date 15 31 15 28 15 31 15 30 15 31 15 30 15 31 15 31 15 30 15 30 15 30 15 31 15 31 15 29 15 31 15 30 15 31 15 30 15 31 15 31 15 30 15 30 15 30 15 31
- MASONRY
- ARCHITECTURAL WORKS
Legend:
- Water proofing - Tile works
- Painting works
ARCHITECTURAL WORKS INTERFACE FOR
NOMINATED SUBCONTRACTOR TOWER 1 & 2
- MASONRY
- ALUMINUM WINDOWS
Legend:
WOODWORKS MEPF
DOOR INSTALLATION
ARCHITECTURAL WORKS INTERFACE FOR TOWER 2
2007 2008 2009
Water Proofing Works Tile Works Painting works (Interior)
LEVEL Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
Date Date Date 15 31 15 28 15 31 15 30 15 31 15 30 15 31 15 31 15 30 15 30 15 30 15 31 15 31 15 29 15 31 15 30 15 31 15 30 15 31 15 31 15 30 15 30 15 30 15 31 15 31 15 28 15 31 15 30 15 31 15 30 15 31 15 31
Legend:
- Water proofing - Tile works
- Painting works
MAJOR EQUIPMENT SCHEDULE
DESCRIPTION DATE ON SITE
*Pumpcrete requirement
PROGRESS OF WORK
PROGRESS OF WORK 1.52%
6
5
7
Area 1
4
2
3
PROGRESS OF WORK 5.23%
TOWER 1
1. On-going installation of rebar
&formworks for vertical structure of
Area 1 Ground – 2nd Floor.
PROGRESS OF WORK 10.22%
TOWER 1
Activity Level
Structural 4
BASEMENT
Activity Level
Architectural
masonry work B1
PROGRESS OF WORK 17.91%
Structural 11 Structural 5
Architectural
masonry work 3
aluminum windows 2
BASEMENT LEVEL
Activity Level
Architectural
masonry work
PROGRESS OF WORK 31.63%
Structural 22 Structural 6
Architectural Architectural
aluminum windows 8,9 aluminum windows 3,4
TOWER 1 TOWER 2
Activity Level Activity Level
Structural 32 Structural 25
Architectural Architectural
aluminum windows 20 aluminum windows 15
interior painting
interior painting
gypsum board
gypsum board
PROGRESS OF WORK 50.65%
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows 20
aluminum windows 15
masonry work 18 masonry work 4
exterior painting 4 exterior painting 4
interior painting 8 gypsum board 9, 10
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows 23 aluminum windows 17, 18
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows 30, 31 aluminum windows 25, 25
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows 32, 33 aluminum windows 27, 28
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows complete aluminum windows 30, 31
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows complete aluminum windows complete
TOWER 1 TOWER 2
Activity Level Activity Level
Architectural Architectural
aluminum windows complete aluminum windows complete
JUNE
JULY 12,
30,
FEBRUARY
MARCH
SEPTEMBER
JUNE
NOVEMBER
DECEMBER
MAY
AUGUST
10,
31,
30, 2007
2007
10,
2008
2009
10,
31,
2008
2007
10,
30,
10,
2008
10,2007
2009
2008
2007
2007
(CONCRETE
(GROUND
(CONCRETE TOWER– TOPPING
TOPPING
th FLOOROFF
82 – TOWER
COMPLETE)
OFF – TOWER
COMPLETE 1) 2)
TOWER 1 COMPLETE
(JACK DOWN OF CRANE 1)
AUGUST 31, 2009
WORKMANSHIP
QUALITY CONTROL
&ASSURANCE
BACK
Inspect
Project Manager
Recommend
Approve Inform
Inform
Advise Report Construction Third Party
Engineering Manager Inspector
Inform Inform
Inspect Inspect
CQC Inspect
Quotation/ (Contractor Work Item
Certification/ Source
In
Quality Control)
fo
Test Result
rm
ply
orm ll/Ap
Inf er, i nst a
Deliv
Quality Certificate/Test
Before Record Result/Product Data
Order
Procedures:
Deliver
1. Sourcing
Operation 2.Testing, if applicable
3.Scheduling/Planning
4.Order&Delivery
5.Installation/Application
6.Inspection
BACK
CERTIFICATE OF COMPLIANCE
QUALITY
RECORD TEST RESULT
APPROVED SAMPLE/BROCURE
SUBCONTRACTOR
PLANS
CSPCEC STANDARDS
SPECIFICATIONS
OPERATION
- QUOTATION EQUIPMENT
CONTROL PARAMETER MATERIALS
- SAMPLE / BROCHURE
SUBMIT METHODS
- PLANS
CSPCEC
- METHODS PROJECT MANAGEMENT
SAFETY
CQC
SPCAI
INSPECT
APPROVED
SOURCE EVALUATE/RECOMMEND APPROVE START WORK PRELIMINARY/FINAL COMPLETE
WORK
CQC
SPCAI
RECTIFY
PARTICULAR SUBCONTRACTOR
DEPARTMENT CONCERN
Working Platform
S.H.E.
Health Hygiene
Dust Control
Noise Control
Environmental
Solid Waste Control
1ST LAYER
2ND LAYER
CANOPY LAY-OUT
CANOPY ELEVATION
THE END
Thank You
谢 谢
CRANE LAYOUT
WORKMANSHIP
IDENTIFICATION
FORMWORKS
SAFETY
QA/QC
FORMWORKS
RETAINING WALL FORM
PLAN
NOTE:
ELEVATION
PLS. INDICATE LOCATIONS OF
ONE SIDED FORMS AND TWO
SIDED FORMS.
1.00M
0.35
0.60
2.55
2.40
0.60
COLUMN DETAIL
SUSPENDED SLAB & BEAM FORMS
SCAFFOLDS LAY-OUT
SUSPENDED SLAB & BEAM FORMS
3 4 DETAIL C
0.740
.122
0.288
3.15
2.55
0.20
Grnd. Floor Line
3.60M Adj. Steel Props (Permanent Shoring)
600MM Ht. Adj. U-Head
1.80M H- Frame
1.80M X-Brace
TYPICAL SECTION
SUSPENDED SLAB & BEAM FORMS
20 mm Thick Phenolic Plywood
122 Aluma Beam Horizontal Frame
20 mm dia. PVC Pipe Sleeve ( ordinary)
12mm dia. x 1.00M Length Tie Rod
0.10
0.14
0.17
0.16
0.14
DETAIL
TYPICAL C SECTION
BEAM
EXTERIOR WALL
EXTERIOR WALL FORM LAY-OUT
VERTICAL BUILDING
ALIGNMENT
SURVEY METHODOLOGY
ROAD CANOPY
WORKERS UNIFORM
SCHEME
With joint efforts of our Filipino and
Chinese employees, also with the
combination of local techniques and
Chinese construction experiences, we will
accomplish our goals and provide a unique
building to the Client.