15 am
Contractor – Joongang co.
1
Dump truck overturned at Okke plant quarry
Title Descriptions
i) Incident Description
ii) Profile of Victim
iii) Immediate action
iv) RCA
- Team
- Chain of Event
- Sequence of Action
- Relevant Photos
- Root Cause Analysis (RCA)
- Main causes of the Incident
- System and Management Related Causes
2
Incident Description
Company :
3
Dump truck overturned at Okke plant quarry
Profile of Victim
Victim
Name : ************
Position : Dump Truck Operator
Age : 51 years old
Family Situation : Married and 2 children
Year of Experience at ******* : 10 Years
Driving License Category: 1st grade certificate for heavy truck
Work Location
Quarry 2 Centre
Work Activities
Transporting limestone to stock piles
Type of Injury
The injured worker had crack of 2 ribs after medical check up and
came back to his work now.
4
Immediate Actions by Plant Team
5
Dump truck overturned at Okke plant quarry
Root Cause Analysis
RCA Team
6
Dump truck overturned at Okke plant quarry
Chain of Event (Before the Incident)
Time Activity
7
Sequence of Action Before Accident - Sketch
B-0 Working Place
Accident Area
Point 1
Limestone was loaded
Level 1 Point 2
by excavator
Transporting limestone
Point 3
350 m
Dump truck was Overturned Along the Hauling Road B-0 Working place
8
Dump truck overturned at Okke plant quarry
Photos
Berming 10M
Safety berm
backward
9
Dump truck overturned at Okke plant quarry
Photos
10
Dump truck overturned at Okke plant quarry
Photos
11
Dump truck overturned at Okke plant quarry
Photos
12
Dump truck overturned at Okke plant quarry
Accident Figure at Limestone Stock Yard
Safety Berm
13
Dump truck overturned at Okke plant quarry
Root Cause Analysis
• The daily inspection of the dump truck was conducted by operator before
starting the work including breaking system and there was no defects found.
• The dump truck has safety facilities like rear camera, frontal mirror,
reversing alarm and seat belt.
14
Dump truck overturned at Okke plant quarry
Root Cause Analysis
W eak d um p ing C ause 1, p hysical co nd itio n
D um p truck M aterial taken at o f the sto ckp ile
C rest co llap se area and
o verturned the to e
unstab le slo p e
F ine m aterial
p iled o n the
up p er slid e
W et and untig ht
slo p e d ue to
p revio us rain
W eig ht o f d um p ap p ro x.
truck 52t
M isund ersto o d o f
D irect d um p ing
d um p ing m etho d C ause2 M istranslatio n
at the crest
in ad viso ry
Lack o f risk
aw areness ab o ut Insufficient
Im m o d erate
W itness chang e o f C ause3 training o f risk
b ackw ard
w o rking m anag em ent
enviro nm ent
Lack o f risk
The w eig ht Insufficient
O b servatio n/ Lack o f risk
turned to o ne W itness C ause4 training o f risk
A ssessm ent in assessm ent skill
sid e m anag em ent
real tim e
N o t fully
D um p truck Inad eq uate
D aily w o rk lo g C ause5 und erstand ing
failure SO P
o f A d viso ry
< S ystem &
M anag em ent < B ehavio r related cause>
related causes>
15
Dump truck overturned at Okke plant quarry
Root Cause Analysis
16
Dump truck overturned at Okke plant quarry
Root Cause Analysis
Lack of risk assessment : Risk assessment of dumping work did not make
complex working condition which clearly identifies all potential & practical
risks (for example, multiple visible inspection for stable repose angle from
the pile upside and downside)
Lack of real time inspection system : Real time inspection needs to check
the risks of working condition and unsafe behavior depending on the
working environment and weather condition
Inadequate SOP : SOP of dumping work is in place but there is inaccurate
application for dumping work due to misunderstanding of stock pile
advisory
Insufficient communication : Lack of communication between inspector
and dump truck operators about the risks observed by inspector
17
Dump truck overturned at Okke plant quarry
Root Cause Analysis
18
Dump truck overturned at Okke plant quarry
Root Cause Analysis
19
Dump truck overturned at Okke plant quarry
Other risks in Quarry
20
Dump truck overturned at Okke plant quarry
Corrective and Preventive Action
(Immediate)
No Corrective Action By Whom By When Status
1 Stop all stock piling work Plant Mgr. Immediate Done
2 Sharing accident information to all teams and Regional Industrial Immediate Done
H&S director and Relation director. Director
Inspection of stock pile condition (stopped 4 activities on
prohibited stock piling and changed 1 activity from Industrial Dir.
3 secondary methods to preferred stock piling). Plant Mgr. Immediate Done
According to the inspection of all berms for road side, WG Kim
condition was good.
Conference call with regional safety director & relation Immediate
4 Industrial Done
director. Technical support was coordinated by ATC geo- Director
mining manager.
5 Removed unstable steep slope of the accident stock pile. YongIn Woo 13-5-2010 Done
6 Training of the revised Stock Piling method was Contractors 13-5-2010 Done
conducted to all workers in quarry.
Safety inspection of all working areas in quarry and
immediate actions for improvement were taken until May
14th, such as ;
· Installation of buffer zone at Q2T WG Kim
7 14-5-2010 Done
Contractors
· Expanded entrance road at Q2T development area
· Removed floating rocks at Q2C
· Expanded transporting road at Q2C
21
Corrective and Preventive Action
(For Improvement)
22
Key Lessons Learned
23
Dump truck overturned at Okke plant quarry