FCI in Andhra Pradesh,and A&N Islands
ANDHRA PRADESH
• TOTAL POPULATION : 49,386,799
• TOTAL AREA : 160,205 Sq. Km
• MAJOR CROPS: Rice is the major food crop. Other
important crops are Jowar ,Bajra and Maize.
• STATE BIRD : Rose Ringed Parakeet
• STATE FLOWER : Jasmine
• STATE TREE : Neem
• STATE ANIMAL : Black Buck
Organizational Structure of FCI in Andhra Pradesh
Regional Office, AMARAVATHI
Andhra Pradesh
District Offices:
1. SRIKAKULAM
2. VISHAKAPATNAM
3. KAKINADA
4. TADEPALLEGUDEM
5. VIJAYAWADA
6. GUNTUR
7. NELLORE
8. KURNOOL
9.PORTBLAIR
Depots(74)
Owned PEG/Hired
24 50
ANDHRA PRADESH REGION
FCI DISTRICT (9) REVENUE DISTRICT (13)
SRIKAKULAM SRIKAKULAM
VISAKHAPATNAM VIJAYANAGARAM
VISAKHAPATNAM
2017-18
2018-19 *
(Figures as
on
15.08.2019)
8
PULSES PROCUREMENT
9
Storage Capacity with FCI in ANDHRA PRADESH
(As on 15.08.2019)
(Figures in LMTs)
Sl. Type of No of
No. Depot Godowns
Capacity Util%
1 FCI
2 CWC
3 SWC
4 PEG
5 CSC
Total
STATUS OF PEG GODOWNS OF ANDHRA PRADESH (Capacity in MTs)
State FCI District Location Mode Capacity
Under Capacity
approved Capacity
Not taken over const- surre-
Taken over
ruction ndered
AP REGION
Total:-
Audit paras pending
Gist of Paras pending for the last three months-2019
14
Status of Zero PV report as on
15
Status of QPV as on 31.12.2018
Purchase of Polypallet Type A
• This office has placed an order in GeM portal for Purchase of
200 Nos Polypallet Type A as per IS 13664 specification.
• Single bidder Ojas Agro Pack Pvt ltd, has been awarded the
supply order cum contract with the reference No. GEMC-
51168779969584 on 30.10.2018.
• The firm has confimed that the consignment to be delivered
to DO Kakinada i.e, Lot No.01 Batch No 3690 MFG JAN-2019,
is ready for despatch & inspection at the factory.
• CA has agreed upon to depute AGM (QC), RO, Hyderabad for
inspection of Polypallets along with CIPET officials at M/s Ojas
Agro Pvt Ltd, Noida.
CWC Advances
S.No District Adjusted Pending
1. Kurnool
2. Kakinada
3. Warangal
4. Vijayawada
5. Nellore
6. Guntur
7. Tadepalligudem
8. Port Blair
9. Srikakulam
Total
Grand Total (Adjusted+Pending)
PDS LIFTING IN AP (RICE)
Figures in LMTs
TPDS
Year Other Welfare Schemes
(including Spl/Addl schemes)
% of
Alloc. Lifting % of Lifting Alloc. Lifting
Lifting
AP REGION
2018-19
2019-20 Upto
15.08.2019
PDS LIFTING IN AP (WHEAT)
Figures in LMTs
TPDS
Year Other Welfare Schemes
(including Spl/Addl schemes)
% of
Alloc. Lifting % of Lifting Alloc. Lifting
Lifting
AP REGION
2018-19
2019-
2020(UPTO
15.08.2019)
Stock position of Pulses (KMS 2018-19)
Storage
Procure gain/Sto Stock
Comm Auctioned Qty.
State d Qty. rage available
odity (in MT) loss
( in MT) (in MT)
(in MT)
Tur*
APREGION Urad**
Moon
g
OPEN SALE OF WHEAT
Quantity Sold(
Year
in MTs)
2018-19
2019-20 upto
15.8.19
Crop year wise issuable stock position of Rice/Wheat/Pulses as on 15.08.2019
Fig.in Mt
Raw Rice
Boiled Rice
Wheat
Tur
Urad
TOTAL
25
STOCK POSITION OF PULSES AS ON 15.08.2019
TUR (MTs)
S.No District Depot Crop Year Closing
Balance
1
2
Total
Grand Total
URAD (MTs)
Closing
S.No District Depot Crop Year
Balance
1
STOCK POSITION OF CHEMICALS AS ON 31.07.2019
Aluminium
1
Phosphide (Kgs)
2 Deltamethrin (Kgs)
3 Malathion (Lts)
4 D.D.V.P. (Lts)
BRL Stocks detected during
KMS 2018-19 in FCI depots
1 AP REGION Nil
Status of Damaged Food Grains as on
15.08.2019
2017-18 2018-19
% of
Damag Quantit
Total % of
Quantity e out y
REGION quantity Damage
Damaged Total quantity of total Damag
handled(off out of
(Rice & handled(offtake quantit ed (Rice
take total
Wheat) excluding DCP) y &
excluding quantity
handle Wheat)
DCP) handled
d
ANDHRA
PRADESH
30
Trend of Storage Loss for last
2 years
Commodity: Wheat+Rice Quantity in LMT/ Value in Crores
• Provisional Figures.
• (-) minus indicates gain
Trend of Transit Loss for last
2 years
Quantity in LMT/ Value in Crores
Sl.
Name of the Depot May-19(%) June-18(%) July-18(%)
No
1
2
3
4
5
34
Regularization of Storage Loss in AP region
Value in Crores
Occurrence during
Pendency as on Regularized Pendency
Region 2018-19(upto
31.03.2018 Upto 31.07.2019 as on 31.07.2019
31.07.19)
Andhra
Pradesh
Regularization of Transit Loss in AP region
Value in Crores
Andhra
Pradesh
DC TREND FOR THE LAST 4 YEARS IN SOUTH ZONE
AP
38
MOVEMENT OF FOOD GRAINS FROM ANDHRA PRADESH
QUANTITY MOVED
YEAR
BR RR
2017-18
2018-19
2019-20 up to 15.08.19
39
STATEMENT SHOWING THE RECEIPTS /
SETTLEMENT POSITION IN RESPECT OF
RAILWAY CLAIMS OF A.P.REGION.
2017-18
2018-19
2019-20
upto
15.08.19
DISTRICT-WISE OUTSTANDING RAILWAY CLAIMS IN RESPECT OF A.P.REGION AS ON 31.08.2019.
SL. NAME OF THE DISTRICT REFUND FREIGHT CLAIMS COMPENSATION CLAIMS MISSING WAGON CLAIMS
NO.
No.of Amount No.of cases Amount No.of Amount
cases Rs. cases
01 T.P.GUDEM
02 GUNTUR
03 NELLORE
04 VIJAYAWADA
05 KURNOOL
06 KAKINADA
07 VIZAG
08 SRIKAKULAM
TOTAL
Actual Pending(RFC) =
Actual Pending(Compensation claims) =
Missing Wagon Claims =
REVIEW OF MDM POSITION AS ON 15.08.2019
3
Review of Income Tax TDS Defaults for the
period from FY 2007-08 to 2018-19 (Dec’18)
as on 15.08.2019
Status of GST Remittance and GST Filing as on
15.08.2019:-
1 GST Remittance
2 GSTR-3B Filing
3 GSTR-1 Filing
5 GSTR-7 Filing
Brief on Internal Audit
• IA & PV: -
• C & AG: -
Review of pending CAG audit paras as on 15.08.2019
Pendency Paras pending for 1st reply
TOTAL NO. OF
Sl.NO NAME OF DISTT/UNIT OUTSTANDING Para Replied but Not Raised before Raised after
PENDING FOR 1st
PARAS Settled 01.04.2018 01.04.2018
REPLY
1 GUNTUR
2 KAKINADA
3 KURNOOL
4 NELLORE
5 PORT BLAIR
6 SRIKAKULAM
7 TADEPALLIGUDEM
8 VIJAYAWADA
9 VISAKHAPATNAM
TOTAL PARA
49
GIST OF CONTRACT DIVISION, FCI, RO,
AMARAVATHI
I) Appointment of HTC/ITC:
II) Appointment of Containerized
Movement Contractor:
CONTAINER MOVEMENT
Sl No From(Designated To(Designated Value Estimated Earnest Security
dispatching depot) receiving depot) calculated Contract value Money(Rs. Deposit and
in Rs./Mts as per MTF (In ) Bank
Rs.) guarantee
10
III) Appointment of MMTC for
Riverine movement:
Receipt / Disposal of Vigilance Cases, Categorization of cases, Nature
of Penalty imposed & Cases pending with whole time inquiry Officers
as on 15.08.2019(CB).
Sl.
Details / Particulars Major Minor
No.
Cases Initiated
2 during the period
(01.01.2019 to 15.08.2019)
Cases disposed
3 during the period
(01.01.2019 to 15.08.2019)
Closing Balance as on
4
15.08.2019
Details of Age-wise pendency of Disciplinary cases
as on 15.08.2019(CB)
Sl. Age wise
No pendency Disciplinary proceedings initiated against Pending
. morethan
2
Details of SCNs pending as on
15.08.19 (CB)
INITIATED
ISSUED ACTION
OPENING during the AGAINST
DROPPED THE SCN PENDING
BALANCE period
during the period during the as on
Category as on (01.01.2019
(01.01.2019 to period 15.08.19
01.01.2019 to 15.08.2019) (01.01.2019 (CB)
(OB) 15.08.2019) to
15.08.2019)
Cat.I
Cat.II
Cat.III
Cat.IV
Total
Labour Strength
(as on 31.07.2019)
Departmental
(Re-deployed as watch & - - - -
Ward
Total
STATUS OF DEPOT ONLINE SYSTEM IMPLEMENTATION
FCI has computerized the entire depot operations through Depot Online System (DOS). All the FCI depots under South
Zone have successfully implemented DOS. Now FCI is in the process of introducing the same in hired depots also by
effective hand holding
ANDHRA
PRADESH
63
STAFF POSITION IN FCI AP REGION AS ON on 31.07.2019
SL NO CATEGORY
SS MIP VACANT / EXCESS
1 CATEGORY - I
2 CATEGORY - II
3 CATEGORY - III
4 CATEGORY - IV
TOTAL
PROGRESS IN IMPLEMENTATION IN SIAS-2014
(AS ON 15.08.2019)
1) SUPREME COURT
2) HIGH COURT
3) LOWER COURTS
4) TOTAL
Review of contempt cases
Sl. District Cases No and Name of the Present status
No Year division to
which the
case pertains
1) Srikakulam CC No. 1666 of 2011 Industrial The Area Manager concerned has passed Orders
filed by G Gannemma Relations Division, as per the Judgment of Hon’ble Court in WP No.
against ED(S), GM(AP) FCI, RO, Hyd. 21696 / 2008 dt. 30.09.2008 rejecting the
and 2 others representation of the petitioner and hence
there is no contempt. The conducting counsel
has been updated accordingly and as and when
the matter comes up for hearing, FCI will argue
for dismissal of the case.
2) Kakinada CC No.359 / 2014 filed Estt. Court case As per Orders of Hon’ble Court, the terminal
by D Appa Rao against Cell, FCI, RO, Hyd. benefits were released to the petitioner and the
Surender Singh, ED(S) matter is pending for closure.
3) TP Gudem CC No. 384 / 2014 Estt. Court Case As per Orders of Hon’ble Court, the terminal
filed by D Surya Rao Cell, FCI, RO, Hyd. benefits were released to the petitioner and the
against AM, TPG matter is pending for closure.
4 to Khammam CCD 2267- DPS Division, FCI, Counter Affidavits in all the 20 cases have been
23) 2274/2015,CCD 2278- RO,Hyd. filed on 08-02-2017. Cases are pending for
2282/2015, CCD 2305- admission in the Hon’ble High Court.
2310/2015 filed by Ex-
Contract labourers.
24) DPS, RO HYD CCD 866/2018 filed by DPS Division, FCI, Counter Affidavit has been filed on 07/06/2018.
FCI Workers Union RO,Hyd. Case listed for admission on 31/08/2018 but did
not come up for hearing.
76
POSITION OF CASES WHERE MoCAF&PD IS A PARTY
1) TOAL NUMBER OF CASES WHERE
MoCAF&PD IS A PARTY
1)
2)
3
to
7)
8)
78
Review of cases where MoCA,F&PD is contesting party
SlN District / Name of the Cases No and Name of Subject Present status
o division to which the case Petitioner / Respondent
pertains
Review of Cases dismissed in default at Hon’ble High Court/Lower Courts and RLC
80
Review Cases under process in DLC/ RLC, which are in final stage of argument
81
E-litigation updation
82
Directions given to all DO’s/Internal Divisions at Area Manager’s Conference
• All Districts should ensure that complete information of pending Court cases in respect of
their Districts are feed and updated in all respects in e – Litigation Application. Even in
respect of disposed cases, judgement copies are required to be uploaded compulsorily.
Therefore, all District Offices are requested to upload the copies of Judgement in the
application wherever it has not been done so far.
• The proceedings entry in e – Litigation Application should be completed within the stipulated
period of 5 days of hearing in every case. But it is observed that many of the District offices
are not following the time limit prescribed for updating the information as a result
considerable embarrassment is caused to this office. This kind of situation should be avoided
by ensuring that the information is updated in time.
• All Area Managers are requested to review all pending court cases being handled by the
District Offices concerned with particular attention attached to filing of Counter on behalf of
FCI. It should be ensured that counter of FCI is filed in all pending court cases and furnish an
ATR to this office.
• All Area Managers are requested to furnish the performance report of all empaneled
Advocates in the prescribed proforma (which has been forwarded to all DOs) immediately to
this office.
SWACH BHARATH ABHIYAN
Under Swachh Bharat Abhiyan along with repair and maintenance works we have already
achieved the target of renovation of Toilet/labour rest shed/water supply under Swachh
Bharat Abhiyan during FY 2018-19 .Further any additional requirements will be attended
as and when required.
STATUS OF WORKS FOR FY 2018-19 IN RESPECT OF
ARMO/MCW/CC ROAD WORKS
ARMO WORKS Rs in Lakhs
S.No Program Region Section Budget Total No. No. of No. of Expenditure
wise allotted of Works Works works upto
completed under 20 Feb’19
progress
1. ARMO CIVIL
Works AP
ELEC
Total
SOUTH ZONE
MCW WORKS Rs in Lakhs
S.No Program Region Section Budget Total No. No. of No. of works Expenditure
wise allotted of Works Works under upto
complete progress 20 Feb’19
d
1. Minor CIVIL
Capital
AP
Works ELEC
SOUTH ZONE
CC ROAD WORKS Rs in Lakhs
S.No Program Region Budget Total No. No. of No. of works Expenditure
wise allotted of Works Works under upto
completed progress 20 Feb’19
1.
UPTO DATE EXPENDITURE UNDER ARMO/MCW/CC ROAD WORKS Rs in Lakhs
Expenditure
S.
Program Region wise Budget allotted upto
No
20 Feb’19
1.
2.
3.
Total
STATUS OF RO/DO BUILDING AT
AMARAVATHI (AP)
• 0.50 Acres of land has been allotted at Ananthavaram village in
Survey no.71 for Construction of FCI, RO/DO buildings.
• 0.60 Acres of land has been allotted at Velagapudi village in Survey
no.105&106 for construction of Residential Quarters for FCI Staff.
• Total extent of 1.10 Acres at the rate of Rs.4.00 Crores per Acre has
been allocated to FCI by APCRDA
• Total amount of Rs.4.40 Crores has been paid to APCRDA
• Accord of AA&ES for an amount of Rs. 22.50 Lakhs towards cost of
land registration is communicated to Area Manager for further
necessary action.
• Allotted land for RO/DO Building and Staff Quarters at Amaravathi is
under process of handing over and taking over along with approval of
agreement for sale deed incorporating changes in some Clauses and
deletion of some Clauses.
PENDING ISSUES WITH REGIONS- CIVIL
1.
PROVISION OF LED FITTINGS IN SOUTH ZONE AS ON
21.02.2019
% of LED fittings
Sl. No Name of the Region
provided
1. ANDHRA PRADESH
वार्षिक कार्िक्रम
• पत्राचार : लक्ष्य प्राप्त र्कर्ा जाता है र्ानी 55 से 58%
• र्िप्पण : लक्ष्य प्राप्त र्कर्ा जाता है र्ानी 30% से ज्यादा
• धारा 3(3) : लक्ष्य प्राप्त र्कर्ा जाता है र्ानी 100%
• उत्तर र्हिं दी में : लक्ष्य प्राप्त र्कर्ा जाता है र्ानी 100%
• राकास : लक्ष्य प्राप्त र्कर्ा जाता है ( हर र्तमाही में एक )
• प्रर्िक्षण : लक्ष्य प्राप्त हुआ
• पुस्तक िं की खरीद : लक्ष्य प्राप्त र्कर्ा जाता है र्ानी 50% से ज्यादा
• वेब साइि : र्िभाषी है
र्हिं दी प्रर्िक्षण
• आिं ध्र प्रदे ि क्षेत्र में दसवीिं कक्षा तक र्हिं दी ह ने की
वजह से क्षेत्र में प्रर्िक्षण सिंबिंधी लक्ष्य प्राप्त हुआ
तथा कार्ाि लर् अर्धसूर्चत र्कर्ा गर्ा।
• ििं कण के र्लए 5 र्दवसीर् किंप्यूिर कक्षाओिं के र्लए
नामािं कन र्कर्ा जाता है ।
कार्ििाला
• हर र्तमाही में एक कार्ििाला आर् र्जत की जाती
है ।
नकद पुरस्कार
• र्िप्पण व आलेखन र् जना के अिंतगित
• दसवीिं कक्षा/ इिं िर में 80% ज्यादा अिंक प्राप्त करने
वाले भा खा र्न के कमिचाररर् िं के बच् िं क
• र्हिं दी परीक्षाओिं में उत्तीणि कमिचाररर् िं क
र्नरीक्षण
सिंसदीर् राजभाषा सर्मर्त र्नरीक्षण सिंबिंधी पत्राचार
क्षेत्रीर् कार्ाि लर्, र्जला कार्ाि लर्, प िि ब्लेर्र, नेल्लूर
के र्नरीक्षण हुए तथा सभी कार्ाि लर् िं के आश्वासन पूणि
माने गए
नराकस / राकास
• राकास की बैठकें र्नर्र्मत रूप से आर् र्जत की
जाती है । लक्ष्य प्राप्त र्कर्ा जाता है ।
• नराकस की गर्तर्वर्धर् िं में र्नर्र्मत रूप से भाग
र्लर्ा जाता है ।
र्विेष उपलब्धिर्ााँ
• वषि 2017-18 के दौरान ‘ग’ क्षेत्र में ब्धथथत कार्ाि लर् िं में
भा.खा.र्न.,क्षेत्रीर् कार्ाि लर्,है दराबाद ने प्रभावी ढिं ग से
राजभाषा नीर्त क कार्ाि ब्धित करते हुए अब्धखल
राजभाषा िील् ड अर्जित की ।
• वषि 2017-18 के दौरान राजभाषा के उत्कृष्ठ
कार्ाि न्वर्न हे तु नराकास िारा भा.खा.र्न. क्षेत्रीर्
कार्ाि लर्,है दराबाद क राजभाषा िर ॉफी प्रदान की गई
।
1.) Security Inspections at all the 35 depots under FCI AP
Region.
Brief of Works: As per the instructions contained in the FCI Security
Manual, periodic inspections are to be carried out in all FCI Depots under the region,
once in every Six Months.
Accordingly, the security inspection plan is drawn each year for inspections
to be carried out in each half of the year by nominating Category –I officers from FCI
RO Hyderabad, and the security inspections are carried out at all the FCI Depots
under AP Region. The inspection reports for each half of the year are scrutinized,
consolidated and forwarded to FCI ZO(S) Chennai, in addition to advising district
offices to take necessary action on the observation noticed therein.
Apart from the above, as per the advice of ZO(S), Chennai, this office also
conducts Security Inspection on behalf of ZO(S), Chennai in respect of depots of
capacity more than 25000MTs.
.
2 ) Maintenance of CCTV Cameras installed at
various depots under FCI AP Region:
3 TP GUDEM
4 SRIKAKULAM
5 VIJAYAWADA
6 NELLORE
7 KAKINADA
8 TP GUDEM
9 PORT BLAIR
TOTAL
Installed by M/s Raxa ltd during the year 2014:
1
2
3
3.) Deployment of Home Guards.