Sie sind auf Seite 1von 18

m 


STUDY OF INDUSTRIAL
PLANT LAYOUT

Presented by:
Falak Dua(10)
Isha Garg(12)
Ê any
RIÊA GLOBAL
EXPORTS, NOIDA
Êmm 

m  





 Ê

    Ê
 m     

Fabric St re 5500
Êutting Deartent 6000
Ware  use 1500
Ê uter Ebr idery 2100
Washing 2500
Finishing 14500
Office 9500
Stitching 26000
Êanteen 4000
Others 8400

T tal lant area = 80,000 Sq. Ft.


 Fraed structure with r fing
 T tal nuber f illars = 91
 Distance between illars = 5.3
eter.
 The illars are arranged 7 in a r w
with 13 c luns.
 FAR = 60:40
 There are in t tal 3 fl r.
 Why Fraed Structure:
 Its a ulti- st rey building
s requires illars.
 Large c ered area
 Ê 
 Frnt = 18 feet
 Back = 20 feet
 Êar Parking side =18 feet
 Other side = 15 feet

 
 Gr und Fl r ² flat RÊÊ r fing at a
height f 15 feet.
 First Fl r ² flat RÊÊ r fing at a height f
15 feet.
 Sec nd Fl r ² flat RÊÊ r fing
 Third Fl r ² asbest s shed in the canteen
area.
 Êar Parking ² Steel structure, Fibre shed
 Adantages f RÊÊ r fing:
r Durability & l ng life
r It d esn·t burn s less daage
t fact ry in case any fire
breaks ut.
r Ec n ical
r Resistant t weather effects.
r L w aintenance
requireents.
r Resistance t r tting and
deteri rati n.

 Adantages f flat r fing:


r It r ides better light,
entilati n and architectural
aearance.
ÿ Êanteen area
 Èing  st truss
 Asbest s sheet
 Adantages f AÊÊ
sheet:
 It is ec n ical.
 It c ers  re sace with
less interediate
su rts.
 It reains c l as it
bseres less heat.

ÿ Êar Parking
ÈING POST TRUSS
 Èing  st truss
 Fibre sheet
 Adantages f Fibre
sheet:
 Great strength
 Resistance t def rities.

 
È ta st ne fl ring
 Adantages:
å T ugh
å N n- water abs rbent
å N n-sli
å N n- r us
å Aff rdable rices
ï   
 The entilati n is required f r fl w f air t
reduce heat, and bring freshness in
w rking at shere.
 There were ar iately 26 wind ws n
each fl r.
 
 Thelightening f the fl rs was d ne with
resect t the j b being handled. If the
j b required greater lights etra lights
were r ided.

Fr insecti n, the lighting required is


aiu.

 There were 60 tube lights in cutting r 


f r r iding better illuinati n f r cutting
efficiency.

m 
Raw Material Raw Material Issued t
Pr cureent Insecti n Êutting Det.

Ebr idery/ Êut Parts Issued


Finishing Printing (if t Sewing Det.
any)

Alterati ns (if
Packaging E- fact ry
any)

Das könnte Ihnen auch gefallen