LECTURERS
TOILETS
ROOMS
LIMITATION
OF WORKS
HOSE REEL
LABS
ROOMS
ADMINISTRATION
SUG STORE
ROOM
SPACE ALLOCATION
TYPE OF SPACE
MEETING ROOM
2% OTHERS
12%
PRAYING ROOM
2% STUDIO
4%
LAB
2% LECTURER'S ROOM
49%
OFFICE
2%
TOILET
6%
STORE
2%
LECTURE CLASS
19%
LECTURER'S ROOM LECTURE CLASS STORE TOILET OFFICE PRAYING ROOM LAB STUDIO MEETING ROOM OTHERS
2. SPACE
OCCUPANCY
1. SPACE 3. SPACE
CAPACITY FREQUENCY
SPACE
AUDIT
ANALYSIS
5. SPACE 4. SPACE
CONDITION UTILIZATION
SPACE CAPACITY
Space capacity assessment is a process evaluation on actual size
layout with standard occupancy load, basically for Malaysia refer
to EPU Norms, to determine compliance optimum occupancy
space layout design.
40% safety area are based on parameter size fire access layout
with depend on types of space function and seat layout.
PERCENTAGE STATUS
>100 Not Comply
75-100 Comply
60-74 Partially Comply
0-59 Not Comply
SPACE OCCUPANCY
Space occupancy is the terms for measuring how well space as in
physical space such as rooms is being used of students compared
to the total room capacity in the building. Space availability, is
simply the length of time the space in question is available for use
during the time frame have selected. Next, space occupancy also a
measurement process for determine percentage of space usage rate
with the calculation of total student, room capacity and hour usage
of the space. The occupancy rate is one of the most important
indicators of success.
DESCRIPTION USAGE
PERCENTAGE
TYPE OF DEFECTS
SAGING
11%
STAIN MARK
22%
MALFUNCTION
23%
STAGNANT
11%
MOLD GROWTH
11%
CRACK
22%
SCHEDULE OF BUILDING DEFECT
AVAILABLE SPACE
350.00
300.00
250.00
200.00
150.00
100.00
50.00
0.00
26A 03 002/0/A 26A 03 003/0/A 26A 03 004/0/A 26A 02 002/0/A 26A 02 003/0/A 26A 02 013/0/A 26A 02 014/0/A 26A 01 002/0/A 26A 01 003/0/A 26A 01 004/0/A
CONCLUSION & RECOMMENDATION
Based on the inspection and assessment that have been done, we can conclude that not all spaces in
Annex 3 are fully utilized and few spaces are critically used.
These are the actions that can be taken by person in charge to avoid surplus and shortage of spaces from
happening:
• Balancing the timetable of classes.
• Provide an adequate tables and chairs for every class
• Follow the EPU norms that have been stated in Perancangan Bangunan 2015