Beruflich Dokumente
Kultur Dokumente
TITLE PAGES
Objective 2
Theory 3
Apparatus 4-5
Procedure 6
Result 6-7
Discussion 8-9
Reference 10
1
CONCRETE LABORATORY
CIVIL ENGINEERING DEPARTMENT
POLITEKNIK TUANKU SULTANAH BAHIYAH
Objective:
To measure the workability of sample from batch of fresh concrete of a given mix ( as
recommended by BS 1881: PART 102: 1983)
2
Theory:
Concrete is tested during its fresh and harden state mainly to ensure that concrete mix satisfies the
specification of works. In its fresh state, concrete is tested for its consistency so as to achieve the
desired workability.
Workability is important property in concrete since a workable mix will produce concrete, which
can be well compacted, transported and placed without segregation. A well – compacted concrete
will produce a good strength concrete. unsupport concrete, when it is fresh, will flow to the site
and sinking in height will take place. This vertical settlement is known as slump. In this test fresh
concrete is filled into a mould of specified shape and the settlement or slump is measure when the
supporting mould is removed.
Slump increases as water cement ratio increases and for different work different slump values are
suitable.
No slump 0
Low 15-30
Medium 35-75
High 80-155
3
Apparatus:
4
7. cement 8. Fine Aggregates
Safety precautions :
1. Wear safety equipment
2. Practice safety habits
3. Comply to all instructions and regulations
5
Procedure:
SLUMP TEST
1. Place the cone on a smooth, flat and clean surface.
2. Fill the mould with three layers of concrete approximately of the same thickness each.
3. Compact each layer of concrete by tamping it 25 times with the standard steel rod.
4. Level the top surface of the concrete with a trowel..
5. Lift the cone slowly vertically to allow concrete to subside.
6. Measure the difference in level between the height of the mould and that of the highest of
the subsided concrete. This difference in height in mm is taken as slump of concrete.
Result:
1. Type and brand of cement = Ordinary Portland Cement
2. Ratio cement 1:2:4
3. Quantities of ingredients required for each sample slump:
cement = 1kg
standard sand = 2kg
coarse aggregate = 4kg
grade = 20 and 25
4. Water cement 0.88
2kg cement = 1.76 L
6
Proportion Slump
Grade 25
From the test that have done, collapse slump as shown in figure 1
Figure 1
7
Discussion:
1. Explain THREE( 3) factors affecting concrete workability
-consistency
-Mobility
-Compactability.
2. Explain the importance of slump test in concrete work
The impoertance of slump test in concrete work is to determine workability of fresh
concrete. Then its useful in detecting variation in mixes of given propeties.
3. Explain workabilit of the sample that we have done
Workability of the sample that we have done is collapse slump. The collapse slumpe
slump shows that the mix is too wet and produce low quality concrete because its contains
excessive amount of water.
4. Give the definition of segregation and bleeding in concrete mixture
The difinition of segregation is separation all the heavy materials and bleeding is
separation water from heavy material water comes out to the surface of concrete mix.
5. Sketch THREE (3) standard types of slump test.. Explain as it happens and suitability of the
concrete mix to be use
8
Type of slump True slump Shear slump Collapse slump
9
Conclusion:
The workability of given concrete sample is found ________ and __________.
Reference:
•Civil Engineering Studies Text Book form 4 / Yusop bin Paal, Werdah binti Abd Halim,
Sarifah binti Daud / Dewan Bahasa Dan Pustaka 2008.
•http://www.ahm531.com/lab-reports/concrete-lab/reports/2/Slump%20Test.pdf
•http://en.wikipedia.org/wiki/Concrete_slump_test
10