Assessment AD at SRI

Prepared by © IT Infrastructure Indopoly Swakarsa Industry Tbk

Prepared by © Netmarks Indonesia


background

• Before running project migration AD at Sumi Rubber


Indonesia (SRI), Netmarks Indonesia (NMID) will be
conduct assessment AD environment at SRI.
• For finding tombstone problem for AD/DC in the SRI
• Assessment AD environment use scanning by health
check test DCDIAG.exe, repadmin /replsum,
repadmin /showrepl, repadmin /syncall and
ADTD.net for AD/DC SRI
• Checking AD/DC at SRI does is works optimally or
not, when replication for DNS, GPO and other
feature before running project migration AD

1 Copyright(C) 2019 PT. Netmarks Indonesia


Objective Goals

1. No tombstones at AD SRI Environment.


2. Process synchronization and replication between AD
SRI CKP and SRI JKT running well.
3. Cleanliness forest the domain can be maintained
4. All notification use AD for email, login user and
other running well

2 Copyright(C) 2019 PT. Netmarks Indonesia


Action Plan Assessment Activity

No Activity Duration Impact PIC

1 From CLI/CMD : repadmin /showrepl 3 Minutes No NMID

2 Capture 2 Minutes No NMID

3 From CLI/CMD : repadmin /replsum 3 Minutes No NMID

4 Capture 2 Minutes No NMID

5 From CLI/CMD : Dcdiag.exe 3 Minutes No NMID

6 Capture 2 Minutes No NMID

7 From CLI/CMD: repadmin /rodcpwdcall 3 Minutes No NMID

8 Capture 2 Minutes No NMID

9 Download ADTD.net from Technet Microsoft 10 Minutes No NMID

10 Install ADTD.net 5 Minutes No NMID

11 Running ADTD.net 11 Minutes No NMID

12 Insert user name and password Administrator 2 Minutes No SRI


to ADTD
13 Record result scanning by ADTD.net 10 Minutes No NMID

3 Copyright(C) 2019 PT. Netmarks Indonesia


Engineer Resources

1. Resources; one engineer only for this assessment


2. Engineer will be action Tuesday. Dec 10, 2019.
02:00 PM

4 Copyright(C) 2019 PT. Netmarks Indonesia


Summary and Reporting Plan

1. Engineer will be capture result when assessment


activity
2. Engineer will be reporting and discussion base on
result assessment with engineer lead to give
conclusion for SRI
3. If result assessment, apparently there are
tombstone. NMID will be suggestion to SRI before
Project Migration AD. SRI must do metadata clean
up

5 Copyright(C) 2019 PT. Netmarks Indonesia


Q&A

6 Copyright(C) 2019 PT. Netmarks Indonesia


Network & Security Design

Implementation

Maintenance

Support

PT NETMARKS Indonesia


Ph: 021-8379 3009
Menara Bidakara, 2nd Floor
Jl. Gatot Subroto Jakarta

info@netmarks.co.id
www.netmarks.co.id

Das könnte Ihnen auch gefallen