Sie sind auf Seite 1von 4

VPLAZA - Transformer Relocation

MV TRANSFORMER MSB MSB


PANEL (3 SETS)

TECHNICAL FLOOR TECHNICAL FLOOR

DP DP
LEVEL 28 LEVEL 28

BUSWAY BUSWAY
DP DP
TYPICAL FLOOR TYPICAL FLOOR
RMU MV TRANSFORMER
RMU PANEL (3 SETS)
INCOMING MV CABLE INCOMING MV CABLE
DP DP

BASEMENT BASEMENT

OPTION 1: TRANSFORMER LOCATED AT TECH. FLOOR OPTION 2: TRANSFORMER LOCATED AT BASEMENT


VPLAZA - Transformer Relocation
3 XTRANSFORMERS 1600kVA MV PANEL 3 XTRANSFORMERS 1600kVA MV PANEL

TECHNICAL FLOOR

TECH RM. TECH RM.


77m2 77m2

MAIN SWITCH BOOARD ORIGINAL DESIGN MAIN SWITCH BOOARD

TECHNICAL FLOOR

MAIN SWITCH BOOARD ALTENATIVE DESIGN MAIN SWITCH BOOARD

2
VPLAZA - Transformer Relocation
RMU

BASEMENT FLOOR

ORIGINAL DESIGN

RMU 3 TRANS 1600kVA MV PANEL 3 TRANS 1600kVA MV PANEL

BASEMENT FLOOR

TECH RM. 77m2 TECH RM. 77m2

ALTERNATIVE DESIGN
3
Transformer Relocation

NO DESCRIPTION UNIT OPTION 1 OPTION 2 REMARK


TRANFORMER AND MV PANEL TRANFORMER AND MV PANEL
LOCATED ON TECHNICAL FLOOR LOCATED IN BASEMENT

1 DESCRIPTION

1.1 MV Panel MV Switchgear Panel MV Switchgear Panel


1.2 Transformer Transformer Station Transformer Station
2 TECHNICAL ISSUE

2.1 Space required m2 77 77


2.2 Riser (room) required m2 15 15
2.3 Busway m 0 525 m for 3 line (175m for one line of the
busway)
2.4 Cable m 175m 0
3 COMPARISION

3.1 Technical Advantage - Optimize the power system due to - Easy for maintenance and
reduce voltage loss by using medium replacement.
voltage. - Reduce structural load on top of the
- No commercial space (car park) lost, building.
no impact on NLA.
Disadvantage - Need the replacement method due to - Power transmission through low
put transformer on the roof top. voltage, the power cable so long so it
shall be lost energy.
- Lost the commercial area (77m2) in
basement (carpark). Impact to LNA.

3.2 Costing Investment - Low cost - Hight cost Please see the
- Equipment cost: VND7,237,275,243 - Equipment cost: VND25,572,171,603 attach files of
the BOQ

Operation - Easy for operation, save travel time - difficulties in the management since
from MV, TX, MSB for technician. the long distance from MV to LV side.

Maintenance and replacement method - Crane to lift and replace incase - Easy in the replacement device.
transformer failure.
- Mobile lift truck for equipment.

4 SYSTEM COMPATIBILITY Yes Yes


5 RECOMMENDATION Recommended Not recommended

Das könnte Ihnen auch gefallen