Sie sind auf Seite 1von 21

INDUSTRIAL TRAINING REPORT

PRENT (M) SDN BHD

Nur Atiqah binti Mat Fauzi


57211114305
Bachelor in Quality Engineering
01-Nov-2017
Table of Content

No Items Page
1 Abstract 3
2 Introduction 4
3 Objective 5
4 Company Details 6
5 Product, Customers, Services 8
6 Job task and Assignment Project 9

1. Supplier Measuring Tool Correlation Study 10


2. Process Validation: PQ 14
3. Medical Tray Test 16
4. Statistical Analysis 18
7 Conclusion 20

1/30/2020 www.prent.com 2
1. ABSTRACT

This report is divided into two sections; the economic section and technical section.

•The economic section contains the company profile of Prent (M) Sdn Bhd.

Company Vision and


Product Customer Services
Details Mission

•The technical section contains the project during industrial training. The project
that was done by trainee include supplier measurement tool correlation study,
assist in product Qualification (PQ) report, medical tray test protocol using
compression tester, statistical analysis; to create new control limits for Intel, and
measurement system analysis; GR&R.

•With those project given, trainee has gained valuable working experience such as
know how to control the limits within each month, know about process validation
and its requirement, the use of compression tester for testing medical tray and
GR&R.

1/30/2020 www.prent.com 3
2. INTRODUCTION

 Industrial training (INTRA) is a compulsory requirement of


graduation for the UniKL students either in Diploma or Degree
Programmes.

 Students need to undergo the training at the chosen company for


16 weeks which started from 31st July 2017 until 20th November
2017.

 INTRA is a concept to introduce UniKL students to industrial


culture and working environment in order to enhance and
increase the students’ employability.

 During the internship, students will be monitored by a company


supervisor that had been selected to assist them in completing
the given task or projects.

1/30/2020 www.prent.com 4
3. OBJECTIVE

To expose students in real industrial and working environment


besides providing vast experiences.

To enhance student knowledge and abilities

Make a good relation for both UniKL and the practical


companies involved as they shared the social obligation
together.

Internship is one of the medium for UniKL to identify industries


current needs, hence improving any weakness discovered.

To strengthen UniKL’s curriculum and produce the proactive


graduates that required by the industry.

1/30/2020 www.prent.com 5
4. COMPANY DETAILS

Company Name : Prent (M) Sdn Bhd

Company Address : PTD 102587, Jalan Cyber 14, Kawasan


Perindustrian Senai IV, 81400 Senai, Johor

Telephone No : 07 – 599 7661/ 7662

Website : http://www.prent.com

1/30/2020 www.prent.com 6
4. COMPANY DETAILS

VISION

To be the clear leader in developing and supplying


reliable cost-effective Thin Gauge Thermoforming
Solutions for quality driven companies

MISSION

To be the leading and preferred provider or reliable thin


gauge thermoforming solutions with a view to a long term
relationship by creating consistent maximum added value for
our customers

MOTTO

Quality – Efficiency – People

1/30/2020 www.prent.com 7
5. PRODUCT, CUSTOMERS, SERVICES

PRODUCT CUSTOMERS SERVICES

•Prent (M) is a •Resmed Asia •Medical packaging


company that
supplies plastic Operations PTY
•Electronics
packaging. •Medtronic Singapore packaging

•Therefore, Prent (M) Operations


•Consumer
does not have own •Intel Corporation packaging
product and provide
plastic thermoforming •Sensata
manufacturing •Micron
services only.
Semiconductor Asia

1/30/2020 www.prent.com 8
6. JOB TASK AND ASSIGNMENT PROJECT

 During the 16 weeks of internship, trainee was assigned to Quality Assurance


Department at Prent (M) Sdn Bhd.

 The first two weeks, trainee has to do on job training as an expose to what QA mainly
job scope

 After finished with on job training, trainee was given these job task:

1. Supplier Measuring Tool Correlation


2. Process Validation: PQ
Study

3. Medical Tray Test 4. Statistical Analysis

1/30/2020 www.prent.com 9
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY

Objective
• To qualify supplier measurement system
• Quantifying data accuracy and offset
value between Prent and supplier
measurement system
• Mitigate the risk of non-conformities being
shipped to Prent Magna Mike equipment use to
measure the thickness at Prent
Task

• Study the result of measuring tools


between Prent and supplier; Copag,
Danapac, Macro and Shinkong
• Use 10 different range of thickness as
samples and measure the samples using
magna mike (Prent side).
• Identify the Correlation and Matching
Different range of thickness
results using JMP software
samples

1/30/2020 www.prent.com 10
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY

Conversion Equation
No Slope Prob > Matching Outcome and Conversion Equation between two
SE │t│ Type of Measurement variables/ metrology tools
contain (≥ 0.05) data conversion
1

1   Linear in accuracy and no Variable # 1 = Variable # 2


significant difference ->

Matched, thus no conversion


required

2  X Linear in accuracy but has Variable # 1 = Variable # 2 + Bias


significant difference -> offset
Fixed/ bias offset is applied

3 X X Not Linear in accuracy and Variable # 1 = Slope* Variable # 2 +


has significant difference -> Bias offset
Linear conversion with slope
factor and bias offset are
applied

1/30/2020 www.prent.com 11
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY

Results
Supplier Correlation Matching Model

Copag Yes Yes Prent ≈ Copag

Prent tools ≈ 1.0034111*Danapac tools –


Danapac Yes No
0.004

Prent tools ≈ 1.0067974* Macro tools –


Macro Yes No
0.0073

Shinkong Yes Yes Prent ≈ Shinkong

1/30/2020 www.prent.com 12
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY

Lesson Learn

• Based on the correlation and matched pairs analysis, trainee had learned the
criteria that need to fulfill to ensure the variable is correlate and matched. If one
of the matching criteria is not meet, then a conversion equation will be applied.

• Able to identify and validate thickness equipment from supplier and Prent

• Identify the bias offset value between Prent and supplier

• Know how to practically use JMP software

1/30/2020 www.prent.com 13
6.2 PRODUCT QUALIFICATION (PQ)

Objective
• To ensure consistently produces a Production Part Approval Process
products that meets all requirement under (PPAP) or IQ, OQ, and PQ helps
anticipated condition manufacturers and customer
communicate and approve
• As part of documentation to get approvals production design, tooling, and
from customer regarding the product before process of before, during and after
HVM manufacturing.

Task

• Create Attribute and Visual inspection PQ report was focus on the


form that consist of customer requirement product to ensure the
product produced meets
and specification based on customer customer requirement and
workmanship specification.
• Use of Minitab software to identify the Cpk
for each critical dimension for PCS Report

1/30/2020 www.prent.com 14
6.2 PRODUCT QUALIFICATION (PQ)

Cpk results using Minitab

Lesson Learn
•For Product Qualification, company need to ensure the critical dimension of
product is meets customer requirement
•The documentation that need to be include in the report are; GR&R Analysis,
PMP, Attribute and Visual Inspection form and PCS report
•If the Cpk is not meet Prent requirement then the product approval will not be
passed until Cpk is higher than 1.33

1/30/2020 www.prent.com 15
6.3 MEDICAL TRAY TEST PROTOCOL

Objective

•To determine the maximum compressive force which medical tray can
sustain.

•To understand the medical tray behavior under compression.

Task

• Helps with medical tray protocol and procedure on how to use the
compression tester towards medical packaging

•The procedure is needed as it will guide through testing such what


force, speed and load should be use and set, how to set up the tray on
compression tester, how to read and save the data result, and data
analysis.

1/30/2020 www.prent.com 16
6.3 MEDICAL TRAY TEST PROTOCOL

Compression Medical tray


Tester machine being tested

Lesson Learn
• Based on the correlation and matched pairs analysis, trainee had learned the
criteria that need to fulfill to ensure the variable is correlate and matched. If one
of the matching criteria is not meet, then a conversion equation will be applied.
• Able to identify and validate thickness equipment from supplier and Prent
• Identify the bias offset value between Prent and supplier
• Know how to practically use JMP software

1/30/2020 www.prent.com 17
6.4 STATISTICAL ANALYSIS

Objective

• To create Control Limits based on CMM Result


• To compare the new control limits with previous lot
• To analyze a process
• Determine if a process is stable or unstable
• Take actions to achieve and maintain a stable process

Task

•Use of JMP Software to create new control limits based on critical


dimension
• Identify that all Cpk for each dimension is pass 1.33 (Prent
requirement)

1/30/2020 www.prent.com 18
Results

Lesson Learn

• Know how to create new control limits


1/30/2020 www.prent.com 19
7. CONCLUSION

• TheOn-Job Training that given to trainee during the first


two weeks has helped the trainee to adapt and gain more
knowledge on QA job scope.

• The projects or any assignment that trainee had done


during this internship have expand the knowledge and

1/30/2020 www.prent.com 20
Thank You !