Beruflich Dokumente
Kultur Dokumente
No Items Page
1 Abstract 3
2 Introduction 4
3 Objective 5
4 Company Details 6
5 Product, Customers, Services 8
6 Job task and Assignment Project 9
1/30/2020 www.prent.com 2
1. ABSTRACT
This report is divided into two sections; the economic section and technical section.
•The economic section contains the company profile of Prent (M) Sdn Bhd.
•The technical section contains the project during industrial training. The project
that was done by trainee include supplier measurement tool correlation study,
assist in product Qualification (PQ) report, medical tray test protocol using
compression tester, statistical analysis; to create new control limits for Intel, and
measurement system analysis; GR&R.
•With those project given, trainee has gained valuable working experience such as
know how to control the limits within each month, know about process validation
and its requirement, the use of compression tester for testing medical tray and
GR&R.
1/30/2020 www.prent.com 3
2. INTRODUCTION
1/30/2020 www.prent.com 4
3. OBJECTIVE
1/30/2020 www.prent.com 5
4. COMPANY DETAILS
Website : http://www.prent.com
1/30/2020 www.prent.com 6
4. COMPANY DETAILS
VISION
MISSION
MOTTO
1/30/2020 www.prent.com 7
5. PRODUCT, CUSTOMERS, SERVICES
1/30/2020 www.prent.com 8
6. JOB TASK AND ASSIGNMENT PROJECT
The first two weeks, trainee has to do on job training as an expose to what QA mainly
job scope
After finished with on job training, trainee was given these job task:
1/30/2020 www.prent.com 9
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY
Objective
• To qualify supplier measurement system
• Quantifying data accuracy and offset
value between Prent and supplier
measurement system
• Mitigate the risk of non-conformities being
shipped to Prent Magna Mike equipment use to
measure the thickness at Prent
Task
1/30/2020 www.prent.com 10
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY
Conversion Equation
No Slope Prob > Matching Outcome and Conversion Equation between two
SE │t│ Type of Measurement variables/ metrology tools
contain (≥ 0.05) data conversion
1
1/30/2020 www.prent.com 11
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY
Results
Supplier Correlation Matching Model
1/30/2020 www.prent.com 12
6.1 SUPPLIER MEASURING TOOL: CORRELATION STUDY
Lesson Learn
• Based on the correlation and matched pairs analysis, trainee had learned the
criteria that need to fulfill to ensure the variable is correlate and matched. If one
of the matching criteria is not meet, then a conversion equation will be applied.
• Able to identify and validate thickness equipment from supplier and Prent
1/30/2020 www.prent.com 13
6.2 PRODUCT QUALIFICATION (PQ)
Objective
• To ensure consistently produces a Production Part Approval Process
products that meets all requirement under (PPAP) or IQ, OQ, and PQ helps
anticipated condition manufacturers and customer
communicate and approve
• As part of documentation to get approvals production design, tooling, and
from customer regarding the product before process of before, during and after
HVM manufacturing.
Task
1/30/2020 www.prent.com 14
6.2 PRODUCT QUALIFICATION (PQ)
Lesson Learn
•For Product Qualification, company need to ensure the critical dimension of
product is meets customer requirement
•The documentation that need to be include in the report are; GR&R Analysis,
PMP, Attribute and Visual Inspection form and PCS report
•If the Cpk is not meet Prent requirement then the product approval will not be
passed until Cpk is higher than 1.33
1/30/2020 www.prent.com 15
6.3 MEDICAL TRAY TEST PROTOCOL
Objective
•To determine the maximum compressive force which medical tray can
sustain.
Task
• Helps with medical tray protocol and procedure on how to use the
compression tester towards medical packaging
1/30/2020 www.prent.com 16
6.3 MEDICAL TRAY TEST PROTOCOL
Lesson Learn
• Based on the correlation and matched pairs analysis, trainee had learned the
criteria that need to fulfill to ensure the variable is correlate and matched. If one
of the matching criteria is not meet, then a conversion equation will be applied.
• Able to identify and validate thickness equipment from supplier and Prent
• Identify the bias offset value between Prent and supplier
• Know how to practically use JMP software
1/30/2020 www.prent.com 17
6.4 STATISTICAL ANALYSIS
Objective
Task
1/30/2020 www.prent.com 18
Results
Lesson Learn
1/30/2020 www.prent.com 19
7. CONCLUSION
1/30/2020 www.prent.com 20
Thank You !
1/30/2020 www.prent.com 21