Beruflich Dokumente
Kultur Dokumente
Enhancement
Groups
Schlumberger Oilfield Services
PEG Con: 1
Production Enhancement Concepts
PEG Con: 2
Int.
Mission Statement
PEG Con: 3
Synergy
Client
PEG
Wireline &
Dowell Testing
PEG Con: 4
Objectives of Production
Enhancement
• Identify Wells with a Production Gap.
• Improve Communication.
PEG Con: 5
Production Enhancement
- Well Evaluation
-Data Acquisition
- Log Evaluation
- Well Tests & Surveys
- Production History - Payback
- Nodal Analysis - ROR, ROI, NPV
- Recommend Services to - Happy Client!
- Evaluate
enhance production
post-treatment
- Execute services
performance
PEG Con: 6
Production Gap
RESERVOIR COMPLETION FLOW CONDUIT ARTIFICIAL LIFT
PERFORMANCE PERFORMANCE PERFORMANCE PERFORMANCE
12 spf
Actual
Potential
Potential Potential
PEG Con: 7
The Production Gap
8% 2%
25%
Classification:
Res ervoir
65% Completion
Flow Conduit
Artificial Lift
PEG Con: 8
Project Loop
Presentation / Meeting
Data Collected
Project Execution
PEG Con: 9
Analysis Process
Catalog Multiwell Info
• Transient Analysis
Move to next zone
• Nodal Analysis
Aquire needed data (TDT,BU) • Perforation Analysis
• NPV Economics
PEG Con: 10
Data Requirements
• Open hole logs
• Existing completions / workover history
• Transient analysis data, pressure surveys
• Production history / Decline curves
• PVT analysis, core test data
• Field maps, structure maps, sand plays etc.
• Stratigraphic correlations
PEG Con: 11
Reservoir Monitoring & PEG
• Single well simulation
• History matching / Decline curve analysis
• Reserves estimates / Remaining reserves
• Production Gap - Candidate Recognition
• Well Production & Intervention Services
• Economic analysis
• Full Field Simulation (with other Schlumberger
companies
PEG Con: 12
Hydrocarbon Index
HYDROCARBON INDEX
Potential NOT PERFORATED N
60
50
40
30
Index
Cum Prod. MCF
20 40+
35 to 40
31 to 35
10 26 to 31
22 to 26
17 to 22
10 20 30 40 50 60 13 to 17
0
8 to 13
4 to 8
0 to 4
PEG Con: 13
Acid Job Case history
WELL:
DOWELL SCHLUMBERGER Location:
System Analysis Model Sate: TX
3000
2250
1500
a
750 Pr 2200 psi
H 40 ft.
K 1 md.
1 2 3
0 Skin 3
0 1500 2000
500 1000
1 skin = 3.0
a=base
Initial Production 750 mscf/day
2 skin = 1.0
Production (Mscfd)
3 Pws Curve Potential Production From Sam Analysis 1270 mscf/day
Actual Production after FoamMat Treatment 1400 mscf/day
PEG Con: 14
Reperforation Cased History
WELL:
DOWELL SCHLUMBERGER Lcoation:
System Analysis Model Sate: TX
10000
7500
5000
IPR After Reperforating
Pr 8500 psi
a
H 20 ft.
2500 K 1.6 md.
Damaged Zone Radius 6 in.
Damaged Zone K .85 md.
3
Production after Perforating with XXX Casing Gun 55 BOPD
1 2
0
Production after Perforating with 1 11/16 EEJ 148 BOPD
0 1000
250 500 Predicted Potential Production 270 BOPD
1 Lperf= 8 in a=base
2 Lperf= 22in Production (Bbls/d) Actual Production after Reperforating with Pivot Gun 277 BOPD
3 Pws Curve
PEG Con: 15
Frac Job Cased History
WELL:
DOWELL SCHLUMBERGER Lcoation:
System Analysis Model Sate: TX
3000
PEG Con: 16
BHP\Z
Depletion?
PEG Con: 17
Exponential Decline
Economic Limit
PEG Con: 18
Return On Investment
Added Value
0
Payout 2
Reduced Cost
Payout 1
0 365
Time (days)
PEG Con: 19