Sie sind auf Seite 1von 12

OFFSHOREENGINEERING.

VN
INFORMATION RECEIVED
BEFORE AFTER
PFD Drawing P&ID Drawing
INFORMATION RECEIVED
BEFORE AFTER
Piping Arrangement Piping Arrangement
3D MODELING
If you want to go fast, go alone. If you want to go far, go together
DRAWING ISSUE
P&ID Drawing Piping GA Drawing
DRAWING ISSUE
Isometric Drawing Pipe Support Drawing
NOZZLE
Drilling , bevel and made nozzle hole ready to fit-up
HEAD FIT UP
Fit-up the head of vessel and adjust dimension
SADDLE
Saddle and accessory are assembly
NDE
The nozzle joint shall be inspection before start install PAD
HYDROTEST
Prepare for hydrostatic test
Thank you

Das könnte Ihnen auch gefallen