Sie sind auf Seite 1von 32

SUMMER INTERNSHIP


TRAFFIC SURVEY
AT
PARICHOWK
INTRODUCTION

 Traffic survey : Traffic survey is undertaken to determine the
volume of Traffic in the particular routes …
 Types of traffic survey :
 Volume Surveys (traffic count)
 Speed Surveys
 Classification Counts
 Gap Studies
 Turning Movement
 Multi-lane Classification
 Pedestrian Surveys
 License Plate Surveys
Traffic Survey Done By Us ?

 Volume Survey (Traffic Count) : It’s a survey where
vehicle’s count by automatically and manually
process.
 Pedestrian survey : It’s a survey where pedestrian
counted by manually or automatically..
Traffic Volume Count

 Prepare
 Set location
 Complete study
 Document work
IMAGE OF LOCATION

Data of all roots

 NOIDA TO PARICHOWK
 Total number of vehicle = 3241

Time LCV & 3 Buses & Two Wheelers Cars Total


Wheelers Trucks
09-09:30AM 160 85 270 480 995
09:30-10:00 125 75 255 420 875
10:00-10:30 97 55 245 495 892
10:30-11:00 75 34 105 265 479
Piechart

Sales

14.10 %

Cars 2 wheelers
7.68%

truck & busses lcv &3 wheeler


51.21%

26.99%
Percentage & PCU

 PCU/Lane/Hour for LCV and 3  Percentage Of Vehicles
Wheelers
 PCU = (457×2÷3)×(60÷120) =  LCV & 3 Wheelers =
152.33 457÷3241×100 =14.10%
 PCU for Trucks and Buses
 Trucks and Buses =
 PCU = (249×3.7÷3)×(60÷120) =
153.55 249÷3241×100 =7.68%
 PCU for 2 Wheelers  2 Wheelers =
 PCU = (875×0.75÷3)×(60÷120) =
875÷3241×100 =26.99%
109.37
 PCU for Cars  Cars = 1660÷3241 ×100
 PCU = (1660×1÷3)×(60÷120) = = 51.21%
276.6
Parichowk to Jagat farm
Time

LCV & 3
Wheelers
Buses &
Trucks
Two
Wheelers
Cars Total
Sales

30%
09-09:30AM 653 150 536 752 2091
38%

09:30-10:00 727 100 522 808 2157

5%
10:00-10:30 573 98 625 965 2261

27%
10:30-11:00 647 100 647 839 2233 Lcv & 3 wheelers
Truck and busses
2 wheelers
Cars

TotalNo.ofVehicles = 8742
PCU & Percentage

 PCU/Lane/Hour for LCV and 3  Percentage Of Vehicles
Wheelers
 PCU = (2600×2÷3)×(60÷120) =
 LCV & 3 Wheelers =
866.66 2600÷8742×100 = 29.74%
 PCU for Trucks and Buses  Trucks and Buses =
 PCU = (448×3.7÷3)×(60÷120) = 448÷8742×100 = 5.12%
276.26
 PCU for 2 Wheelers  2 Wheelers =
 PCU = (2330×0.75÷3)×(60÷120) = 2330÷8742×100 = 26.65%
291.25  Cars = 3364÷8742×100 =
 PCU for Cars
38.48%
 PCU = (3364×1÷3)×(60÷120) =
560.66
Jagat to Parichowk

Time LCV&3 Buses& TwoWheelers Cars Total
Wheelers Trucks
09-09:30AM 322 95 689 952 2058 28%
33%

09:30-10:00 344 98 487 897 1826


10:00-10:30 244 81 422 822 1569 4%

10:30-11:00 102 63 311 624 1100 Lcv & 3 wheeler


34% truck and busses
2 wheeler
cars
Total No. of Vehicles = 6553
PCU & Percentage


PCU/Lane/Hour for LCV and 3
Wheelers Percentage Of


PCU = (1012×2÷3)×(60÷120) = 337.33
PCU for Trucks and Buses
Vehicles
 PCU = (337×3.7÷3)×(60÷120) = 207.81  LCV & 3 Wheelers =
 PCU for 2 Wheelers (1012÷6553)×100 = 15.44%
 PCU = (1909×0.75÷3)×(60÷120) = 238.62
 PCU for Cars  Trucks and Buses
 PCU = (3322×1÷3)×(60÷120) = 587 =( 337÷6553)×100 = 5.14%
 2 Wheelers =
(1909÷6553)×100 = 29.13%
 Cars = (3522÷6553)×100 =
49.67%
Parichowk to kasna

Sales Time LCV&3 Buses& Two Wheelers Cars Total
16%

Wheelers Trucks
5%
09-09:30AM 265 40 290 317 912
50%
09:30-10:00 175 55 365 314 909
29% 10:00-10:30 418 36 350 330 1134
Lcv & 3 wheeler

truck and busses


10:30-11:00 220 39 310 311 880
2 wheeler

cars Total No. of Vehicles = 3835


PCU & Percentage

 PCU/Lane/Hour for LCV and 3  Percentage Of Vehicles
Wheelers
 PCU = (1078×2÷3)×(60÷120) =
 LCV & 3 Wheelers =
359.33 ( 1078÷3835)×100 =
 PCU for Trucks and Buses 28.10%
 PCU = (170×3.7÷3)×(60÷120) =  Trucks and Buses =
104.83
(170÷3835)×100 = 4.432%
 PCU for 2 Wheelers
 PCU = (1315×0.75÷3)×(60÷120) =
 2 Wheelers =
164.37 (1315÷3835)×100 = 34.28%
 PCU for Cars  Cars = (1272÷3835)×100 =
 PCU = (1272×1÷3)×(60÷120) = 212 33.16%
Kasna to Parichowk

Time LCV&3 Buses& Two Wheelers Cars Total Sales
Wheelers Trucks 23%

09-09:30AM 265 40 290 317 912 45%


4%

09:30-10:00 175 55 365 314 909


10:00-10:30 418 36 350 330 1134 27%

Lcv and 3 wheeler

10:30-11:00 220 39 310 311 880 truck and busses


2 wheelers
cars

Total No. of Vehicles = 3589


PCU & Percentage

 PCU/Lane/Hour for LCV and  Percentage Of Vehicles
3 Wheelers  LCV & 3 Wheelers =
 PCU = (986×2÷3)×(60÷120) = (986÷3589)×100 = 27.47%
328.66  Trucks and Buses =
 PCU for Trucks and Buses (184÷3589)×100 = 5.12%
 PCU = (184×3.7÷3)×(60÷120) =  2 Wheelers = (1151÷3589)×100 =
340.4 32.07%
 PCU for 2 Wheelers  Cars = (1268÷3589)×100 =
 PCU = (1151×0.75÷3)×(60÷120) 35.33%
= 143.87
 PCU for Cars
 PCU = (×1÷3)×(60÷120) = 211.33
Parichowk to Noida

Time LCV & 3 Buses & Two Cars Total
Wheelers Trucks Wheelers
11%

09- 58 70 310 425 863


09:30AM
09:30- 18 65 167 747 1013
10:00
26%
10:00- 28 81 97 620 826
10:30
63%
10:30- 14 73 122 411 620
11:00

Total No. of Vehicles = 3322

Lcv and 3 wheeler


truck and busses
2 wheeler
cars
PCU & Percentage

 PCU/Lane/Hour for LCV  Percentage Of Vehicles
and 3 Wheelers  LCV & 3 Wheelers =
 PCU = (118×2÷3)×(60÷120) (118÷3322)×100 = 3.55%
= 39.33
 Trucks and Buses =
 PCU for Trucks and Buses
(289÷3322)×100 = 8.69 %
 PCU =
 2 Wheelers =
(289×3.7÷3)×(60÷120) =
178.21 (696÷3322)×100 =20.95 %
 PCU for 2 Wheelers  Cars = (2203÷3322)×100 =
 PCU = 66.31 %
(696×0.75÷3)×(60÷120) = 87
Finding

 Capacity
 Pcu
Reason for Choking

 Detailed survey of Pari Chowk carried out. Existing
three lanes provided have adequate capacity even if
traffic flows at 30 Kmph at the circle.
 Blocking of the road by autos.
 Improper halting of busses in the second and at times in
the third lane.
 No bypass for heavy vehicles.
 Restricted area available for busses, autos, personal and
commercial vehicles. Larger area can avoid congestion.
 Pedestrian crossing on the main expressway
solution 1


 Shifting of bus stop at Pari Chowk to Alpha Commercial Metro
Station. Thus providing adequate area for busses, autos, private
car parking and commercial vehicles.
 Separate bus lanes (55 busses can be parked simultaneously).
 Separate auto lanes (More than 100 autos can be parked).
 Adequate car (180) and two wheeler / Cycle (350) parking.
 Multimode transit facility.
 No blocking of road and wrong side driving.
 Pedestrians can use metro bridge to cross roadway.
 NIL cost alternative. Relaying / strengthening of existing roads
may be required.
Existing 4.8 m wide Road to be used for Busses


Existing 9.0 m wide Road to be used for Car
Parking


Bus lane for other side

Solution 2

solution 2

 In case shifting Pari Chowk bus stand to Alpha
Commercial not feasible.
 Shifting of bus stop to under the Pari Chowk metro station.
 An opening from the expressway to the service road to be
provided. Busses to stop under the metro station and join
the expressway at Tugalpur junction.
 Hard standing for auto stand to be made in the empty area
near Pari Chowk.
 Autos to use service road in front of Ansal Plaza to come to
Metro Station.
Parking Area For Autos,Uber,Ola

DRIVE WAY FOR AUTOS,UBER & OLA


BUS LANE

OTHER SIDE BUS STAND



THANK YOU