Network Operations-BSS

AP Kurnool Cluster – 4th Aug-10

For internal use


1 © Nokia Siemens Networks Presentation / AP BSS O&M / Feb 2009
KURNOOL CLUSTER N/w SNAPSHOT
BSC Commissioned TRX Handling capacity

BSC 3i High cap Served by BTRP04BTRP02,BTRP03,BTRP01,BTRP05 1000


HYD BSC3 & HYDBSC4

Total 4(BTRP01,02, 03,04,05,HYDBSC03,04) 7000

     

BTS Installed Base Installed TRX's

Flexi BTS 388 3100

Total 388 3100

     

Transmission Equip Type Installed Base

PDH Link PDH(1+0) 35

PDH(1+1) 123

SDH Link SDH(1+0) 179

SDH(1+1) 2

Total   339

     

ALCATEL LUCENT MUX AS PER SDH NODES 181

For internal use


2 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Total Outage trend from Mar’10 to Aug’10

Outage trend from Mar’10 to Aug’10

  Mar- Apr-10 May- Jun-10 Jul-10 Aug-


10 10 10
Outag 54201 51697 48213 60219 27460 37574
e

Reasons for shortfall


 On 5st July, due to DG problem at MKTG001 499 Mins outage occurred.
Action Plan
 On 8th July, due to Neighbors stopped the DG to run & 575 Mins outage
occured..

 Dg & AC problems informed to WTTL &
On 8th July, 560 Mins outage occurred due to Mw Misaligned at KDRG002 &
delay due to Monkeys on the tower. Indus to clear on top priority
 On 11th July, due to shelter leakage at CCHG001 rain water entered into IDU &  Regarding TTSL OFC cuts informed to TTSL
1205 Mins
team.
 On 11st July due to CDMA MW fading total 657 Mins outage occurred.
 On 16th july due to PIM Card Problem at SSBC002 462 Mins utage occurred.  MW realignment has done b/w Rpt
 And on 18th July,1402 Mins outage occurred due to dual fiber cut b/w Kolar to Pothulakunta to Lingareddypalli HOP
Chintamani & Tadetad to Ananthapur.
 For the HOPs were supporting rod is not
 On 22th July , 2181 Mins outage was due to TTSL fiber cuts b/w Hitech city to
MSC_3 Mux available were discussed with the team.
 On 22th June, 832 Mins outage was due to IF Cable damaged by Monkeys.  Antenna was changed b/w GTKC001 to
 On 26th July, due to MW Fading b/w Rpt Pothulakunta to Lingareddy palli total MKTG001 & avoid the outage.
269 Mins outage occurred.
 On 27th July, due to Railtel Fibercut b/w Guntakal to Bellary & Hubli to Gadag
600 Mins outage occurred.
 ForOn 29th use
internal July, 328 Mins outage was due to SMPS Problem. Total Outage trend
3 ©
 On 31 July,
st Nokia SMPS
Siemens Networksat KURG033
Problem Presentation
& Total /AP
300Circle
MinsBSS O&M/ 2-Jun-09
Outage occurred. 6 Months
Total NSN Outage trend from Mar’10 to Aug’10
Total NSN Outage trend from Mar’10 to Aug’10
Category Mar'10 Apr'10 May'10 Jun'10 Jul'10 Aug'10
BSC 0 0 0 0 0 40
ALU 1320 836 285 0 0 0
BTS 0 0 24 0 58 0
Misc 150 54 452 232 600 2690
MW 0 374 943 1770 2439 1912
NEC / 0 62 1193 1061 120 718
Ceragon
Grand Total 1470 1326 2898 3063 3217 5360

Reasons for shortfall


Action Plan
 On 11th July ,due MW Fading b/w DHRG003 to
MMLG001 ,10 sites were down & total 334 Mins
outage occurred.  MW Realignment done b/w GTYC001 to GTYG002
 MW Fading b/w GTKC001 to MKTG001 due to  Realignment b/w GTKC001 to MKTG001.

Heavy wind & rain ,16 sites were down due that  MW Realighnment done b/w Rpt Pothulakunta to Linga
total 253 Mins outage occurred. reddy palli.
 Due to Heavy Wind & Rain MW Fading was  At ALLG002 site PCM Cable was changed & Flexi pipe
occurred b/w Rpt Pothulakunta to Lingareddy palli was used .
,3 sites were down 269 Mins outage occurred.  Shared with Support team..
 Due to PCM Cable problem b/w CDMA Site to  After getting Krone tool we will plan to rekrone all
ALLG002 total 207 Mins outage occurred. E1s in some of the sites

For internal use


4 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Total NSN & Non NSN Outage trend from Mar’10 to Aug’10
Total NSN & Non NSN 6 Months Trend

  Mar- Apr-10 May- Jun-10 Jul-10 Aug-


10 10 10
NSN 1470 1327 2898 3063 3226 5360
Outage
Non NSN 42246 24988 21392 34527 10299 25820
Outage
Grand Total 43717 26315 24290 37590 13526 31180

Reasons for shortfall


Action Plan
 On 5st July, due to DG problem at MKTG001 499 Mins outage occurred.
 On 8th July, due to Neighbours stopped the DG to run & 575 Mins outag
eoccured..  MW Realignment done b/w GTYC001 to GTYG002
 On 8 July, 560 Mins outage occurred due to Mw Misalighned at KDRG002 &
th

delay due to Monkeys on the tower.
Realignment b/w GTKC001 to MKTG001.
 On 11th July, due to shelter leakage at CCHG001 rain water entered into IDU &  MW Realighnment done b/w Rpt Pothulakunta to Linga
1205 Mins reddy palli.
 On 11th July due to DG fails to start at ANAG009 495 Mins occurred.  At ALLG002 site PCM Cable was changed & Flexi pipe
 On 12th July due to DG fails to start PYAC001 222 Mins ouatge occurred. was used .
 On 16th july due to PIM Card Problem at SSBC002 462 Mins utage occurred.  Shared with Support team..
 On 22th June, 832 Mins outage was due to IF Cable damaged by Monkeys.
 After getting Krone tool we will plan to rekrone all
 On 21st July, 494 Mins outage due to DG fails to start at ALLG002
E1s in some of the sites
 On 26th July, due to MW Fading b/w Rpt Pothulakunta to Lingareddy palli total
269 Mins outage occurred.  Dg & AC problems informed to WTTL &
 On 29th July due to SMPS Problem at ALLG002 total 328 Mins outage occurred. Indus to clear on top priority
 On 31st July,SMPS Problem at KURG034 & 300 Mins outage occurred.
For internal use
5 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Snapshot on Cluster Planned Activities for July’10

Activities Planned Completed

BTS Preventive Maintenance 75 75

TRX Addition

ATP ( BTS, MUX & NEC ) 22 22

ALU Patch Loading 148 148

RSL Improvement 15 15

NEC NMS 14 13

BTS Alarm Clearance (BL TRX & RSSI) 132 132

PM tracker
A lca te l P a tch ATP Details RSL NEC NMS Ring Info TRX Additions
lo a d in g

Alarms
For internal use
6 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Cluster Infra Issues for July’10

S.NO Problems Total No of sites-


Escalated
1 DG Problems 59
2 AC Problems 35
3 Battery bank problems 7
4 Access issues 26
Indus Infra Issues
5 Door open sites 30
6 Frequently sites are going down 6
7 Inside the shelter/Shed & lights 6
problem
8 Site Cleaning required 23
9 Power socket problems at Sites 10
10 Monkies at sites….(Difficult to 15
manage)
11 Tower issues 6
12 Water leakage Shelter/Shed 14
13 Non DG sites 1
14 SMPS PROBLEM 4

For internal use


7 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Total NSN Outage trend from Feb’10 to Jul’10
Total NSN Outage trend for Augl’10

Category Mar'10 Apr'10 May'10 Jun'10 Jul'10 Aug'10


Reasons for shortfall
 On 11th July ,due MW Fading b/w DHRG003 to MMLG001 ,10
BSC 0 0 0 0 0 40 sites were down & total 334 Mins outage occurred.
 MW Fading b/w GTKC001 to MKTG001 due to Heavy wind &
ALU 1320 836 285 0 0 0 rain ,16 sites were down due that total 253 Mins outage
occurred.
BTS 0 0 24 0 58 0  Due to Heavy Wind & Rain MW Fading was occurred b/w Rpt
Pothulakunta to Lingareddy palli ,3 sites were down 269 Mins
Misc 150 54 452 232 600 2690 outage occurred.
 Due to PCM Cable problem b/w CDMA Site to ALLG002 total
MW 0 374 943 1770 2439 1912 207 Mins outage occurred.
Action Plan
 MW Realignment done b/w GTYC001 to GTYG002
NEC / 0 62 1193 1061 120 718
 Realignment b/w GTKC001 to MKTG001.
Ceragon
 MW Realighnment done b/w Rpt Pothulakunta to Linga reddy palli.
Grand Total 1470 1326 2898 3063 3217 5360  At ALLG002 site PCM Cable was changed & Flexi pipe was used .
 Shared with Support team..
For internal use  After getting Krone tool we will plan to rekrone all E1s in some of the
8 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
sites
Entire Network with Reason wise trend from Feb’10 to Jul’10

Reasons for shortfall


Category Feb-10 Mar- Apr-10 May- Jun-10 Jul-10
 Entire Reasonwise
On 5st July, due to DG problem at MKTG001 499 Mins outage occurred.
10 10 trend
 On 8 July, due to
th
Neighbours stopped the DG to run & 575 Mins outag eoccured..
ALU 754 1320 836 285 0 0
 On 8th July, 560 Mins outage occurred due to Mw Misalighned at KDRG002 & delay due to
BTS 12 0 0 24 0 58 Monkeys on the tower.
 On 11th July, due to shelter leakage at CCHG001 rain water entered into IDU & 1205 Mins
Infra - WTTIL 3711 3606 4756 7391 3062 5231
Infra -Non WTTIL 5396 4928 8350 7153 9792 5662  On 11st July due to CDMA MW fading total 657 Mins outage occurred.
(Shared)  On 16th july due to PIM Card Problem at SSBC002 462 Mins utage occurred.
 And on 18th July,1402 Mins outage occurred due to dual fiber cut b/w Kolar to Chintamani
Infra- Others 2854 1951 3655 5093 2732 3008 & Tadetad to Ananthapur.
(shared)  On 22th July , 2181 Mins outage was due to TTSL fiber cuts b/w Hitech city to MSC_3 Mux
LL 1581 1217 4312 223 88 2239  On 22th June, 832 Mins outage was due to IF Cable damaged by Monkeys.
Misc 1300 150 8737 5811 8336 730  On 26th July, due to MW Fading b/w Rpt Pothulakunta to Lingareddy palli total 269 Mins
outage occurred.
MW 0 0 374 943 1770 2439  Action Plan
On 27 July,
th
due to Railtel Fibercut b/w Guntakal to Bellary & Hubli to Gadag 600 Mins
outage occurred.
TTSL Media 10891 41029 20677 21169 34439 8061  Dg & AC problems informed to WTTL & Indus to clear on top NSN
priority
& NON NSN
Grand Total 26499 54201 51697 48213 60220 27428  Regarding TTSL OFC cuts informed to TTSL team. Trend
 MW realignment has done b/w Rpt Pothulakunta to Lingareddypalli HOP
For internal use  For the HOPs were supporting rod is not available were discussed with the
9 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09 team.
MW Fading Outage trend for Jun’10 & Jul’10
MW Fading Outage trend for Jun’10 & Jul’10

Reasons for shortfall


Action Plan
 On 11 July ,due MW Fading b/w DHRG003 to
th MWFading Outage
MMLG001 ,10 sites were down & total 334 Mins trend
outage occurred.  MW Realignment was done for the HOP GTKC001 to MKTG001
 And GTYC001 to GTYG002 Hop Re-alignment was done.
 MW Fading b/w GTKC001 to MKTG001 due to
 MW realignment has done b/w Rpt Pothulakunta to
Heavy wind & rain ,16 sites were down due that
Lingareddypalli HOP
total 253 Mins outage occurred.
 As the SDNC001 to BAlLG001 Hop was fading ,new HOP
 Due to Heavy Wind & Rain MW Fading was RGAG001 to RJAG001 HOP was implemented .
occurred b/w Rpt Pothulakunta to Lingareddy palli  Antenna was changed b/w GTKC001 to MKTG001 & avoid the
,3 sites were down 269 Mins outage occurred. outage.
 Due to PCM Cable problem b/w CDMA Site to  MW Realignment was done for the HOP DHRG003 to MMLG001
ALLG002 total 207 Mins outage occurred.

For internal use


10 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Work Order Report trend for Jul’10
Work order Report for July month Work order Report for July month

WO Status
Close Request 2
Closed 655
Dispatched 1
Grand Total 658

For internal use


11 © Nokia Siemens Networks Presentation /AP Circle BSS O&M/ 2-Jun-09
Thank you