Lacking Permits :
1.Business Permit
2.Sanitary Permit
3.Certificate of Annual Inspection
4.Permit to Operate
5.Discharge Permit
URC CEBU PLANT 1 - EHS UPDATES
1. Discharge Waiting for the Follow up EMB personnel time PCO – Dannel Jay Tormis October 31, 2019
Permit assessment from DENR to time for the renewal
– EMB 7
2. MCWD Done with the installation Conduct water test as per EHS – Yuri C. Cauba January 2020
Connection requirement QA Manager – R. Cabug
Waiting for the approval with Maintenance – S. Lopez
Head Office
3. Certificate of Expired – *Rainwater Collection Water EHS – Yuri C. Cauba December 29, 2019
Annual Inspection (since August 2017) System – Done
PERMITS / LICENSES STATUS ACTION PLAN Person in Charge (PIC) Date of Completion
4. Mechanical Permits – No permit Waiting for the creation of As- EHS – Yuri C. Cauba March 2019
Issuance of Permit to Operate Built Plan and Renewal of
(PTO) - DOLE compliance Certificate of Annual Inspection
*Boiler – 1 unit
*Generator Set – 1 unit
* Air Receiver – 5 units
* RO Vessel – 1 unit
* LPG Tank – 5 units
* Water Softener – 2 units
* Hoist Elevator – 5 units
* Steam Pipeline – 1 unit
* Compressed Airline – 1 unit
* LPG Pipeline – 1 unit
* Water Pipeline – 1 unit
Occupational Safety and Health
URC CEBU PLANT 1 - EHS UPDATES
Mandatory Eight (8) Hours Seminar Mandated by DOLE (R.A. 11058) - Section 16 :
Safety and Health Training “All workers shall have 8 hours Safety and Health Seminar”
Update as of February 3, 2020
Update :
MANDATORY EIGHT (8) HOURS SAFETY SEMINAR as MANDATED BY DOLE (RA 11058)
Date conducted : September 21, 2019 @ Training Room Time : 8:00-5:00 PM
2019 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec YTD
2020 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec YTD
LTIFR
AIFR
URC CEBU PLANT 1 - EHS UPDATES
3 / 29 / 2019 Lost Time Index Finger Caught Installation of cover for HMI display and EHS – Reynald Valerio Done
Injury In Between With the push button (previous EHS) /
Jaw Sealer of Coffe GT Premium Sticks Packaging – 5 pcs.
Packaging Machine GT White Twin Pack Packaging – 5 pcs
GT White Sachet Packaging – 5 pcs
5 / 7 / 2019 Medical Caught in Between Cascade of Incident / Installation of EHS – Reynald Valerio Done
Treatment The Shutter Valve Machine Interlock (previous EHS) /
Injury And Gate
Opener/Closer Holder
Bolt
11 / 12 / 2019 Medical Head Got Hit By Cascade of Incident / Fabrication of EHS – Yuri Cauba / Done
Treatment Coffee Scoop Coffee Scoop Storage
Injury
12 / 14 / 2019 Medical Left Hand Caught By Cascade of Incident to QA Department – EHS – Yuri Cauba / Done
Treatment The Roller Tracker of Machine Safety Guidelines
Injury Cracker Packaging
Machine
URC CEBU PLANT 1 - EHS UPDATES
0%
EHS Legal Risk Action Machine HAND SLIPPAGE Safety Safety Safety Personal
Leadership Compliance Assessment Required Safe Program Program Training Knives Signages Protective
(HIRA) Close out Guarding Equipment
EHS – Machine Guarding Compliance
As of January 18, 2020
Coffe Line - Packaging Area
Location : Packaging Machine - GT White Twin Pack
Update as of : January 16, 2020
GT White Twin
Pack – Packaging Production /
Area Missing Cover Maintenance
(Machine C)
GT White Twin
Pack – Packaging
Production /
Area Missing Cover Maintenance
(Machine D)
Sticks – Packaging
Area (Machine C)
Missing Handle Production /
Maintenance
Coffee Line – Packaging January 18, 2020
Sticks– Packaging
Area
(Machine F) Production /
Missing Cover Maintenance
Sticks – Packaging
Area
Production /
(Machine H) Missing Cover Maintenance
Ties – Packaging
Area (Machine C)
Missing Handle Production /
(Right Side) Maintenance
Coffee Line – Packaging January 18, 2020
Sticks– Packaging
Area
(Machine D) Production /
Missing screw Maintenance
Sticks – Packaging
Area
Production /
(Machine F) Missing Cover Maintenance
Cracker Line– Packaging January 18, 2020
Cracker –
Packaging Area Production /
(SIG 1) Missing Cover Maintenance
Cracker –
Packaging Area
Production /
(SIG 2) Missing Cover Maintenance
Note :
October 25, 2019 MHE operator not wearing Approach the personnel and Sardonyx Bubuli – January 2020 For
seatbelt while using the informed to fasten seatbelt at Supply Chain schedule
forklift unit. all times while using the
equipment / Refresh training in
forklift safety
November 21, 2019 Fabricator Maintenance Inform the personnel to use Alexander Perandos – February 2020 For PPE
Personnel did not wear face shield while grinding Production requisition
appropriate PPE while materials.
grinding a metal.
December 3, 2019 Employee not using Inform the employee to use Mildred Tambis – December 2020 Done
appropriate ladder while designated ladder QA
retrieving material @ QA
Acceptance
December 9, 2019 Not wearing appropriate Informed the 3P personnel to Jaime Soronio – Febuary 2020 For PPE
PPE while doing the Pallet wear appropriate PPE (boots) Third Party requisition
washing Coordinator / Safety
Officer
December 17, 2019 Not wearing body harness Issued work stoppage order by Jaime Soronio – December 2020 Done
while working at height the 3P and provide safety Third Party
harness Coordinator / Safety
Officer
URC CEBU PLANT 1 - EHS UPDATES
December 26, 2019 No lifeline while working at Issued work stoppage and Jaime Soronio / Third Dec. 26, 2019 Done
heights (wall patching provide safety harness & Party
cement) lifeline
January 7, 2020 Not wearing of PPE @ Inform the worker to use PPE Jaime Soronio / Third January 10, Done
Cracker Process Area while doing the job / Re-orient Party 2020
the importance of PPE during
toolbox meeting
Sustainability
SUSTAINABILITY
EUR & WUR – December 2019
Particulars CY2019
AU
KPI GOAL JAN FEB MAR APR MAY JUN JUL Sept. Oct. Nov. Dec. YTD (Actual vs. Goal)
G
SUSTAINABILITY
Energy Usage 3.4 3.07 3.2 2.89 3.0 3.69 3.65 3.19 4.11 2.7 3.17 2.4 3.7 2.9 HIT
Ratio
Water Usage 4.91 6.08 5.19 5.35 3.77 5.25 5.18 5.27 6.22 5.96 5.29 5.36 7.52 5.39 MISSED
Ratio
CY2019 Plans and Programs
3. Replace Lead-to-LED lights Project Maintenance – March 2020 Contacted the supplier for
S. Lopez clarifications / For
observation of existing
LED installed lights. For
installation of sticker (date
of installation for the next
replacement of LED lights
CY2019 Plans and Programs
5. Right cleaning during change over EHS - Y. Cauba March 2020 Already discussed the
(CIT- Projects) SOP for Pallet Washing
areas /
THANK YOU!