CONSTRUCTION QUALITY

MANAGEMENT
ASSIGNMENT
GROUP 2
Sampoong Department Store Collapse, Seoul

Fig 1. Before Failure Fig 2. After Failure Fig 3. Cracks in roof slab
INFORMATION:- Reasons of Failure:-
 Located in Seoul, South Korea  Pre Construction Stage - Faulty designs, Lesser Steel Reinforcements.
 Construction began in 1987 and  During Construction - 5th floor construction without prior planning, Thicker
the store was opened for public in
Slabs in 5th floor, Improper placement of reinforcement bars in slabs.
1990.
 Building collapsed on 29th June  Post Construction Stage - Movement of airconditioning units, Negligence
1995, killing 502 people and towards structural cracks near column and in roof slab.
injuring 937.

Reference:-https://en.wikipedia.org/wiki/Sampoong_Department_Store_collapse
2016 Kolkata flyover collapse
Date:  31 March 2016
Location: Kolkata
Project: Vivekananda Road
flyover
Structure: 150m steel span
Contractor: IVRCL Infrastructures
& Projects Ltd.
Casualties: 50+ people dead and
80+ injured
Cause: quality issues in
designing, construction, raw
materials (steel), supervision
(unapproved drawings)
Reference 1:
https://en.wikipedia.org/wiki/Kolkata_fl
yover_collapse
Reference 2 :
https://timesofindia.indiatimes.com/cit
y/kolkata/kmda-to-raze-damaged-parts-
of-vivekananda-road-flyover/articlesho
w/70135217.cms
Collapse of 2000 Commonwealth Avenue Boston
INTRODUCTION:
•C O L L A P S E O C C U R R E D O N J A N U A RY 2 5 , 1 9 7 1 .
•S I X T E E N S T O RY H I G H R I S E B U I L D I N G .
•F O U R W O R K E R S D I E D .
REASONS FOR COLLAPSE
•P U N C H I N G S H E A R FA I L U R E I N T H E M A I N R O O F
AT C O L U M N E 5 .
•D E S I G N F L AW S S U C H A S I N C O R R E C T P L A C E M E N T
OF BARS
•L A C K O F P R O P E R B U I L D I N G P E R M I T A N D
FIELD INSPECTION.
•P R E M AT U R E R E M O VA L O F F O R M W O R K .
•L A C K O F C O N S T R U C T I O N C O N T R O L .
•R E F E R E N C E :
H T T P S : / / E N G - R E S O U R C E S . U N C C . E D U / FA I L U R E C A S E S T U D I E S / B U I L D I N G - F
A I L U R E - C A S E S / 2 0 0 0 - C O M M O N W E A LT H - AV E N U E - B O S T O N /
MOULIVAKKAM TOWER COLLAPSE - CHENNAI
Prime Shristi Housing Pvt. Ltd --- Two Towers
Collapse of Belief Tower – 11 storey Building Demolition of Faith Tower
2BHK with 4 flats in each floor 3BHK with 4 flats in each floor
Collapse on June 28, 2014 – at 5.30p.m Demolition was carried out by implotion
61 workers were killed and many injured technique in 3 seconds on November 2, 2016.

REASON VIOLATION OF LAW


• Foundation design with raft and pile • CMDA approved plan was not used
was inadequate. for construction.
• Materials were not tested properly. • Architect was not registered with
• Owner removed columns in Council of Architects.
basement for more parking space.
Reference : http://www.ijrbsm.org/papers/v4-i1/5.pdf
THANK YOU
PRESENTED BY
AP 19588
AP 19589
AP 19590
AP 19593