Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
Plant & Process
Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
All dehydration plant were spared after successful completion of Performance Test of Nashpa LPG
Plant. As per current forecast provided by RMD dehydration plant will be required to process additional
As already informed Well # 4, 6 & 9 has been taken into service @ 500 psig w.e.f. 20-11-19 (well # 4 &
9) and 10-12-19 (Well # 6) through stand by MP OFF GAS COMPRESSOR, By injecting well # 4, 6 &
9 @ 500 psig sales gas flow has been increased by 4 to 5 MMSCFD and oil approx. 4500 bbl. Stand
by MP OFF GAS COMPRESSOR will remained in service till commissioning of Nashpa Front End
Compression (FEC).
After commissioning of Front End Compression (FEC) gas flow of Well # 01 & 08 having WHFP 1700-
2200 psig is planned to inject in LPG plant through HP separators while remaining wells shall flow via
After the Commissioning of Nashpa FEC, it is required to hookup MELA Trunk Line at down stream of
Nashpa FEC as MELA FEC will trips at Low Low Final Discharge Pressure PALL-2509 A/B/C @ 1125
Nashpa
psig (NewJV:
Hookup4Q-2019
PFD is TCM
attached).
December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
HP Wells Hookup Plan
Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
MELA TRUNK LINE HOOKUP AFTER NASHPA
FEC COMMISSIONING
Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
7
There is a requirement to install new heat exchanger at the inlet of MP separator as currently
crude oil inlet temperatures are in the range of 90 ~ 95 F during winter and 105~110 F in
As Nashpa wells temperature are decreasing, with the passage of time inlet temperatures will fall
further. So it would be difficult to control the RVP of crude due to expected low feed inlet
temperatures and in order to control the RVP of crude in future, a Heat Exchanger is necessary
to install.
Currently, OGDCL though in-house arrangement installed and commissioned MP Separator Inlet
Crude Exchanger E-2001 (Interim Arrangement) which has resulted in improvement at MP/Flash
Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
8
Daily rental of MP Separator inlet crude exchanger E-2001 is proposed @ US $ 250/Day from 23-01-2020
but after procurement and commissioning of JV owned equipment, rent of above MP separator inlet crude
Nashpa LPG plant has 01 no OVHD compressor package (LP+MP compressor), having no complete
The stabilizer OVHD compressor requires schedule inspection and major maintenance job after regular
intervals.
The compressor will be required to stop for few days to execute the planned jobs and at that time LP
compressor may be more beneficial. So, there is a genuine need for standby LP compressor.
Nashpa JV: 4Q-2019 TCM December 11, 2019 OGDCL : Geared to Grow-Eyeing a Brighter Tomorrow…
9
sent to Nashpa Gas Processing Plant for processing. The composition of raw gas coming
In order to remove H2S from the raw gas, H2S scavenging chemicals are injected using the