MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY,

SHAHEED ZULFIQAR ALI BHUTTO CAMPUS KHAIRPUR


MIRs’
DEPARTMENT OF CIVIL ENGINEERING

Name: Aafaque Hussain


Roll No: KF16CE21
Subject: Construction Management and Planning (CE435)
Teacher: Engr. Touqeer Ali Rind
Date of exam: 22-07-2020

1
PBL presentation topic

Importance and Use of Network Analysis


and Project Scheduling

2
• Network Analysis is a technique for
planning, scheduling and controlling the
process of projects.
• N.A is tool of project management that aid in
carrying-out task against a time tangent.
Network • This is very useful for projects which are
Analysis complex in nature (i.e. where the activities
are subjected to a considerable degree of
uncertainty in performance time.
• A network is schematic representation of the
entire project, consisting of number of
activities.

3
•   Event: An event is a specific
accomplishment that occurs at a recognizable
point of time and does not call for either the
Technical need of time or resources. It is represented by
Terms used node( ).
•   Activities: An activity is the work required
in Network to complete a specific event. An activity
Analysis consumes both time and resources. It is
represented by Arrow( ).

4
• Powerful tool of planning, scheduling and
controlling.
Importance • It Minimize idle resources.
and Use of • It Minimize the total project duration.
• To minimize production delays, interruptions
Network and conflicts.
Analysis is •  Provides systematic approach in planning
because of: and scheduling.
•  It is a powerful tool for optimization of
resources by using the concept of slack.

5
• Project: “A collection of linked activities,
carried out in an organized manner, with a
Project clearly defined START POINT and END
Scheduling POINT to achieve some specific results
desired to satisfy the needs of the
organization at the current time.”

6
Project Schedule

SPLIT PROJECT INTO TASKS ORGANIZE TASKS MINIMIZE TASK


AND ESTIMATE TIME AND CONCURRENTLY TO MAKE DEPENDENCIES TO AVOID
RESOURCES REQUIRED TO OPTIMAL USE OF WORKFORCE DELAYS CAUSED BY ONE
COMPLETE EACH TASK TASK WAITING FOR
ANOTHER TO COMPLETE
Contd..
• Completing the project as early as possible
Objectives by determining the earliest start and finish
of each activity.
Of Project • Calculating the likelihood a project will be
Scheduling completed within a certain time period.
• Finding the minimum cost schedule needed
to complete the project by a certain date.
• Effective time management
Objectives • Optimizes sequence of events
Of Project • Define necessary resources
• Monitor project progress
Scheduling