DESIGN OF AN ELECTRICAL TRAIN

FOR THE VALLE DEL MANTARO


SECTION (HUAYUCACHI – CIUDAD
UNIVERSITARIA)
Issue:
Vehicle congestion in the city of Huancayo has increased by 3%
percent according to the Ministry of Transportation and
Communications in recent years, where daily 16 thousand 473
vehicles transit in the city Huancayo generating chaos this is
due to the increase in vehicles due to population growth.

Huayucachi - Huancan
Mercado Modelo Mayorista
Solution:

• Implement a new system of mass public transport (electric


train) to reduce the time and cost of transport for the benefit
of users.

Jr. Ica y ferrocarril


Elevated rail design:

Diameter of column: 1.40 m


Raiwaly Width: 4.50 m
Distance between columns: 15 m
Right of way

Tracks

Columns

estate
JUSTIFICATIÓN

 Technological
Alstom Metropolis 9000
The electric train that will be used is the Alstom
Metropolis 9000 model, this train is manufactured in
Spain.

• It has 6 articulated wagons.

• Capacity for 1200 passengers.

• It reaches a maximum speed of 80 km / h.


Electrical power supply
Catenaries Pantograph

The power supply that this train will have will be through catenaries that are
overhead cables that transmit electric power. The electrical energy reaches
the train through the catenaries through pantographs.
SOCIAL
The project will benefit five
districts a total of three hundred
eighty-eight thousand people.
Huayucachi with eight thousand
people.
huancan with twenty thousand
people.
chilca with eighty thousand
people. Huancayo with one
hundred and twenty thousand
people and tambo with one
hundred and sixty thousand
people.
The project consists of five stations
starting from Huayucachi, Huancan,
Chilca, Huancayo and Tambo.
ECONOMIC

• The passenger will spend less


on private transportation (taxi)
to travel to places near the
train section; It will increase the
economic activities (business)
neighboring the stations and in
the area of ​influence due to the
greater accessibility.
• In addition, it will generate jobs during the
execution and subsequent operation of the
project for skilled, semi-skilled and
professional labor; the lands along the
road will be positively revalued by
improving the quality of the environment,
accessibility and quantity of green areas.
• This project will cost 45 million per
kilometer of construction of the railway,
which gives a total of $ 855 million of total
expenditure.
environmental
environme
ntal
assessmen
An t
in order to predict the
environment possible impacts that
al impact It includes can be generated and
establish mitigation
study will be measures.
carried out
Project
activitie
s
• air quality monitoring will be carried out at
the construction stage, because there will

AIR be machinery working therefore would


generate pollutants

• excavations are occasionally


carried out the removal of trees

SOIL and loss of soil that are around


the railroad tracks, to reduce
damage small species of trees
will be planted

NOIS • in the construction and operation


stage there will be noise which will
be carried out monitoring verifying
the environmental quality

E standards for noise avoiding noise


pollution.
conclusions

1. it is concluded that the electric 2. This project will cost 45


train will benefit a total of three
hundred and eighty-eight
million per kilometer of
people in the Huayucahi and construction of the railway
Ciudad Universitaria.