1
Housekeeping / Admin
2
SAFETY MOMENT
.
3
Induction Objective & Target Audiences
4
Project Information & Scope
Client Duqm Refineries and Petrochemical • Crude Import & Storage
Industries LLC (DRPIC) – JV of Oman Oil • LPG Storage and Associated Facilities
Company(OOC) and Kuwait Petroleum
International (KPI) – 50/50 shareholding • Sulphur Storage, Pelletisation and
Project EPC2 – Utilities and Offsites Loading
FEED&PMC / Amec Foster Wheeler / Allen & Overy
• Refinery Coke, Diesel & Jet A1 Truck
Legal Advisor Loading
• Natural Gas Reception Facilities
Licensor Not Applicable • Flare, Fire Fighting, Slop Oil, HC Drain,
Type of Lumpsum EPC
Flush Oil & Spent Caustic Systems
contract • Waste Water Treatment Plant
Site location Duqm ~ 600 KM from Muscat • Waste Handling and Disposal
Type of site Greenfield
System
• Drainage System – Oil Water System
Scope Engineering, Procurement, Construction,
Commissioning, Training, Start-up and • Drainage System – Clean Water
Initial Acceptance • Interconnecting Pipe racks,
ITT(Invitation ITT endorsement certificate was provided Infrastructure & Buildings
To Tender. along with PART 2 – FINAL TECHNICAL & • Export Product Pipelines ( LPG,
Endorsement UNPRICED COMMERCIAL bid confirming
correctness and completeness of the Naphtha, JetA1, Diesel & HSFO )
Tender Document
6
Petrofac Quality Policy & ISO Certificate
SECL’s Quality Policy & Objectives
Enhancement of Quality
Competetiveness
Continual process improvement
based on preventive action
Accomplishment of Customer
Satisfaction
8
Project Quality Policy
Section 5.0 PQP - PROJECT QUALITY POLICY
The JV team aims to deliver the project following quality policy of Duqm Refinery, all activities for the project
execution will be carried out in full compliance with JV quality management system which is fully in alignment
with company standards, design data, statutory and regulatory requirements (where applicable) and ISO
9001-2015.
JV Project Director will provide the leadership to the project management team and committed to provide the
following,
Initiate actions for understanding the needs and requirements of the customer including statutory and
regulatory requirements
Allot adequate and competent resources throughout the duration of the project execution
Establish JV Project Quality Management System covering all project activities ( Engineering, Procurement,
Construction, Commissioning to Handover ), and continually improve the effectiveness of quality
management system to enhance company satisfaction
The Contractors and its Suppliers shall manage Quality in line with DUQM REFINERY Quality Policy.
Contractor shall ensure the compliance with the requirements during execution of the Contracts. Initiate
activities and controls that will ensure products or services are delivered meeting the technical intent and
the asset is built to a level of standard which ensures safe, reliable operation.
Identifying needs and expectations of all interested parties and communicating company requirements
including regulatory requirements that will deliver the product meeting customer requirement consistently
JV Project Director will communicate Quality Policy to all stake holders and interested parties and create
awareness among the project team for its understanding and application.
The quality policy will be implemented through our project quality management system and periodic audits,
project reviews will be used to verify conformance with requirements, assess continuing suitability and
effectiveness with company requirements. 9
Project Quality Objectives
Section 6.0 PQP - Project Quality Objectives
Following are the project quality objectives which are specified and recommended by the company
Compliance: Assure compliance with project specified requirements including project specifications,
national and international code and standards and statutory requirements where applicable
Technical Integrity: Assure that technical integrity is verified and maintained in all the project phases
Objective Evidence: Assure the evidence of “conformance to requirements” is clearly identified,
recorded and maintained. Identify, compile and verify quality records and documentation in a timely
manner during the life of the project
Vendor / Supplier / Sub-Contractor Quality Management: Assure supplier and sub-Contractor
manage quality in line with company quality requirements stated and implied
Lesson Learned and Continual Improvement: Recognize and apply lesson learned during the project
execution at various stages based on in house LL module and strive for continual improvement
throughout the project duration
ICV – Assure compliance to Schedule 17 of the Contract. Contractor, Subcontractors and Vendors to
contribute to Company’s objective of increasing in-country value (ICV) in Oman. For ensuring the in
country value, EPC contractor will utilise local companies to provide construction material, services and
equipment’s.
The above quality objectives will be further developed and detailed for different project phases as
appropriate, Key performance Indicators will be developed in line with above objective and same will be
monitored and reviewed as part of quality management system
10
Project Quality Strategies
Section 7.0 PQP- Project Quality Strategies
Adopt “Right First Time” approach to minimize the amount of checking and rework. SQM will roll
out to site, to ensure we adopt the policy at the commencement of site-works.
Inbuilt Quality- Quality Built by Design.
Proactive Approach- Defect Prevention rather than detection and correction
Resources: Engage and use an effective, competent and skilled project team utilizing project and
group expertise available in the company that satisfies the needs of the project
Compliance: Clear and timely communication of requirements to the project team as well as
Contractors and suppliers. Adopt ISO 9001 as quality system standard applied to the project by all
parties. Verify and document compliance to the requirements through audits / reviews and
surveillance
Technical and Project Assurance : Establish an integrated Project Controls & Assurance Plan
that will be implemented to manage quality through the measurement of critical parameters in key
business processes, ensure compliance with Project requirements, demonstrate assurance to
Project stakeholders, provide clear audit trails and assess the continuing effectiveness of the
QMS. Ensure decisions and approvals of project deliverables by the competent authority through
the approved key personnel’s (as specified in contract).
Risk-based Quality Management System: Utilize a risk based quality audit and quality
intervention and criticality rating process for services, equipment, products, goods, and materials
to determine the appropriate level of quality assurance, surveillance and inspection activity.
11
Overview of Project QMS
Customer requirements are Management’s top priorities.
QMS is managed through a web based electronic application.
Project Quality Plan (PQP) is developed based Company Quality Management Plan PLN-1500-1000-001 & Company
Specification for Quality Management SPC-1500-1000-00 and Part 4 section 6 Quality Management DRP001-FED-GSU-U-000-
416
PQP shall be applied by entire Project team, throughout the project duration, including Sharjah Home office, Value
Engineering Centers, Subcontractors and Site location.
Quality Audit Procedure & Plan
Non-conformance Procedure
QA/C implementation During Engg.
QA/C implementation During Procurement
QA/C implementation During Construction
Inspection Coordination procedure
Key Performance Indicators (KPI)
Management Review
Continual Improvement
12
Project Key Plans & Procedures
• Project Execution Plan • Document Control procedure
once ready key plans and procedures will be • Pre -Commissioning Procedures
13
RIGHT FIRST TIME
There are four main Objective areas that have been
identified for all project phases ( EPC ) as being
critical to the success of the RFT process
SAFE, CLEAN, TIGHT, OPERABLE & MAINTAINABILITY
15
Quality Management – Construction & Completion
• Subcontractor Approvals
• Subcontractor Quality documents -based on contractor’s standard QCP / ITP and ITR
by incorporating project specific requirements The eight Golden Rules of Safety
16
Daily Surveillance at Site
Daily Surveillance will be conducted during
construction works at site, report and
discuss findings that have a potential to
cause non-conformities.
17
Project KPIs
Quality - HO
Vendor Quality Document Review Cycle
1 % >80% within 2 weeks % of documents reviewed within 2 weeks vs. Documents Received
Time
2 NCR Response ( For Client NCRs ) % >80% within 1 week No of NCRs responded with prposed corrective actions
Vendor Quality document approval Number of vendor documents approved in code-1 within 2nd revision
5 % >85% by Second revision
(Code-1) vs. number of vendor documents approved in code-1 after 2nd revision
Inspections visits aborted due to lack of Number of Inspection visits aborted Vs Number of Inspection visits
6 % <1% Inspection visits
readiness carried out
1 Weld Rejections
% weld Joints rejected vs. Weld joints RT tested ( Reshoot joints
1.1 CS Pipeline % Max 5% Joint wise
shall not be considered )
% weld Joints rejected vs. Weld joints RT tested ( Reshoot joints
1.2 CS Pipeline % Max 1% Linear wise
shall not be considered )
For Fab shop Max 1% Joint wise % weld Joints rejected vs. Weld joints RT tested ( Reshoot joints
1.3 Utility Piping For Fabshops and Site %
For Site Max 3% Joint wise shall not be considered )
% weld Linear length rejected vs. Total Linear Weld length RT tested
1.4 Utility Piping % Max 0.5 % Linear
( Reshoot joints shall not be considered )
% weld Joints rejected vs. Weld joints RT tested ( Reshoot joints
1.5 Tank welding Joints % Max 5.0% shall not be considered )
PLAN
Establish the objectives and processes necessary to deliver
results in accordance with the specifications.
DO
Implement the processes.
CHECK
Monitor and evaluate the processes and results against
objectives and Specifications and report the outcome.
ACT
Apply actions to the outcome for necessary improvement. This
means reviewing all steps (Plan, Do, Check, Act) and modifying
the process to improve it before its next implementation.
Key Success Factors
20
Any Questions ?
Thank You
21