Sie sind auf Seite 1von 3

CGT 412 – Fine Design 02/01/2021

Project Scope & Team Composition Execution

Project Scope: Estimated


Progress
Key Milestones Completion
We will be creating a working prototype for a protective, aftermarket, (%)/Status
Date
exterior trim attachment for a vehicle called the Lotus Elise. The target Beginning of Semester Meeting/Scheduling 100% 01/22/2021
audience will be Elise owners who need a cheaper way to protect and fix
3D Scan of Lotus Elise 25% 02/12/2021
their vehicles. We will design a skid plate that can attach to the Elise
Concept Drawings of Initial Designs 5% 02/17/2021
which will protect the “clamshell” and prevent further damage to the
vehicle.

Team:
Logan Gauker Chasidy Dean
Trent Lambrecht Alexander Meredith
Adam Crum
Assumptions and Risks Accomplishments and Help Needed

Assumptions Accomplishments
1. Group members will be present at 3D scan of the car on 2/8 1. Set time for scanning Lotus on 2/8
2. Gained access to the Lotus on 2/8
Risks 3. Reached out to Eric for time to scan car
• If it snows we will not have access to the car 4. Met with our partner groups for our presentation
5. Gained valuable insight from our group meetings, namely:
- Make sure the product is unique from existing carbon fiber products
- Why is there no carbon fiber solution currently?
- What way can we produce the skid plate to increase strength? For example, rubber inserts to
dampen vibration
- Etc.

Help Needed
• Research to make sure that our product is going to be unique
CGT 412 – Fine Design ACTIONS
Action Description Assigned-to Due Date Notes STATUS
  Schedule Group meeting for return to Semester Logan 01/22 Group met to schedule work Complete
for the next few weeks
Research 3D scanning methods on mobile devices or request All 1/29 Met with grad student Eric Complete
access to the 3D Romer arm that we used in CGT 313 Kozikowski to get access to
Purdue IMI for 3D scanning
Request access to the Lotus vehicle from Carlos Alexander 02/05 Gain access to the Lotus for a Complete
couple hours in a day.

Scan 3D model of Lotus on Monday All 02/09 Taking Lotus to IMI to 3D scan In Progress
New Items in BLUE
Old Items in BLACK

New Items in BLUE


Old Items in BLACK
GREEN – On Schedule
YELLOW – Off-Schedule w/Recovery Plan
RED – Off-Schedule w/No Recovery PLan